RERA Property Intelligence Report · Preview

AMOGAYA ADORIT

AMOGAYA PROJECTS · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/230425/007689

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

130
Registered units
₹84.0 Cr
Est. construction cost
Units profiled
27
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units130Total inventory registered with K-RERA.
Official carpet area12,721 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area25,752 sqmUseful scale context when comparing density and project cost.
Registered land area7,714 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.499Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings2Official tower/wing count in the K-RERA detail page.
Parking disclosed130 total (163 covered, 0 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberHTP/CC/152/2024-25/2962Use this to match the sanctioned drawing set shown by the builder.
Plan approval date14-02-2025
Project start date01-04-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2.5 BHK1310%1,027 sqm
3 BHK11790%11,944 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
TOWER-B14707044.98 m
TOWER-A14606044.98 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 130 official flat/unit rows, matching the 130 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK117101.0-102.7 sqm47.2-61.3 sqm117
2.5 BHK1379.0 sqm43.7 sqm13

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
TOWER-B7079.0-102.7 sqm43.7-61.3 sqm70
TOWER-A60101.0-102.7 sqm60.9-61.3 sqm60
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
B001TOWER-B03 BHK102.7 sqm61.3 sqm1
B002TOWER-B03 BHK102.7 sqm61.3 sqm1
B101TOWER-B13 BHK101.0 sqm60.9 sqm1
B102TOWER-B13 BHK102.7 sqm61.3 sqm1
B103TOWER-B13 BHK102.7 sqm61.3 sqm1
B201TOWER-B23 BHK101.0 sqm60.9 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,074 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 130 homes across 2 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 130 parking spaces for 130 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~59 sqm per home; across all 130 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

1 of 25 compliance document slots are filed as Not Applicable; the remaining 24 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC is not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows it as "not found in catalog", that is why; ask the builder directly whether it applies here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

6 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved19-11-2024NOC Water Permission.pdf
KSPCB- MOEF (Above 50 Acres)Approved18-11-2024NOC MOEF - converted.pdf
Airport Authority of IndiaApproved02-04-2024NOC AAI.pdf
BSNL/Telecommunication DepartmentApproved03-06-2024NOC BSNL.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantCH Pranay Kumar2324192013Bengaluru Urban, Karnataka - 560066
EngineerArun Kumar SNBCCl/BL-3.6/SE-0029/2024-252024Bengaluru Urban, Karnataka - 560082
ArchitectHanumesh GCA/2010/506122010Bengaluru Urban, Karnataka - 560072
ContractorM/s AMOGAYA PROJECTS-2024Bengaluru Urban, Karnataka - 560038

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹8.78 Cr collected from buyers, ₹5.84 Cr withdrawn from the project's escrow account.

Construction progress31% → 33% (+2 pts)
Units sold/booked as registered0/130 (0%)
Buyer collections in available QPRs₹11.24 Cr
Escrow withdrawals in available QPRs₹8.30 Cr (0.74x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹64.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: ICICI Bank Indira Nagar IFSC Code : ICIC0003170 Pin Code : 560038. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~10 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub10 km
Outer Ring Road / Manyata15 km
Bellandur–Marathahalli belt16 km
Kempegowda Int'l Airport16 km
MG Road / city centre19 km
Electronic City26 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Amogaya Projects.

Other RERA-registered projects in Devanahalli

Major developers building in Devanahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.