RERA Property Intelligence Report · Preview

ULTIMA

sai kalyan builders and developers · Bengaluru North · K-RERA PRM/KA/RERA/1251/309/PR/171021/001218

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
3
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

364
Registered units
₹71.6 Cr
Est. construction cost
Units profiled
23
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units364Total inventory registered with K-RERA.
Official carpet area29,296 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area16,181 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings5Official tower/wing count in the K-RERA detail page.
Parking disclosed364 total (0 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date03-01-2016

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
FLATS364100%29,296 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
BLOCK A138282-
BLOCK B138282-
BLOCK C138282-
BLOCK D138282-
BLOCK E53636-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 364 official flat/unit rows, matching the 364 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK294718.3-770.4 sqft422.3-451.0 sqft294
3BHK70947.8-1,227.4 sqft553.5-861.0 sqft70

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
BLOCK A82718.3-1,227.4 sqft422.3-861.0 sqft82
BLOCK B82718.3-1,227.4 sqft422.3-861.0 sqft82
BLOCK C82718.5-1,227.4 sqft422.3-861.0 sqft82
BLOCK D82718.5-1,227.4 sqft422.3-861.0 sqft82
BLOCK E36718.3-947.8 sqft422.3-553.5 sqft36
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G1BLOCK A02BHK770.4 sqft451.0 sqft1
G2BLOCK A02BHK718.3 sqft422.3 sqft1
G3BLOCK A02BHK718.3 sqft422.3 sqft1
G4BLOCK A02BHK730.5 sqft430.5 sqft1
G5BLOCK A02BHK730.5 sqft430.5 sqft1
G6BLOCK A03BHK947.8 sqft553.5 sqft1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~781 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 364 homes across 5 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 364 parking spaces for 364 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~462 sqft per home; across all 364 homes that is ~96% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 19 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Jan 2019, extended (Section 6 Extension) to 31 Jan 2020 — both dates have passed with no OC on file. The extension on file was granted on 19 Jul 2019 (K-RERA extension no. EX/PRM/KA/RERA/1251/309/PR/190719/001218) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (171 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Pradeep K Srivastava vs sai kalyan builders and developers private limitedTo complete the project, To furnish OC, To refund maintenance collected from March 2021.AUTHORITY21/01/2026
RAKESH KUMAR SONI vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till dateAUTHORITY21/01/2026
Prashant Shukla vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to furnish OC. To instruct builder to Refund the maintenance amount collected from March 2019 to Till date.AUTHORITY21/01/2026
Tanumoy Sett vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY21/01/2026
Niraj Chandrakar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Aqeeluddin Saiyad vs sai kalyan builders and developers private limitedProject Completion as per the agreement and compensation as per agreementAUTHORITY16/03/2026
Ultima Smart Homes Owners Asssociation vs sai kalyan builders and developers private limitedAs specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damagesAUTHORITY16/03/2026
Anurag Kumar vs sai kalyan builders and developers private limitedForce builder to complete the project and as compensation pay to me the interest part of EMI, that I had paid till date to the bankAUTHORITY16/03/2026
BHUPAL REDDY P vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Siny Saleesh vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Shabeer Ahmed vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Swaroop Kumar Sana vs sai kalyan builders and developers private limitedProject Completion as per the agreement and compensation for the delay in completionAUTHORITY16/03/2026
Gaurav Kumar vs sai kalyan builders and developers private limitedProject completion as committed with the promised amenities and compensation for the delay as per the agreement.AUTHORITY16/03/2026
MANISH RANJAN vs sai kalyan builders and developers private limitedProject completion as committed with up to the mark quality of amenities and compensation for delay as per the agreement.AUTHORITY16/03/2026
Pratyesh Chandra Singh vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till dateAUTHORITY16/03/2026
Deepak Ushadevi vs sai kalyan builders and developers private limitedto complete amenities, to issue OC, to correct all structural defects in the pillars, walls.AUTHORITY16/03/2026
Pummy Kumari vs sai kalyan builders and developers private limitedAs specified in the facts of complaints fought for the amenities, OC from BBMP, liquified DamagesAUTHORITY16/03/2026
PRASHANT KUMAR SARANADAGOUDA vs sai kalyan builders and developers private limitedrefund of advance maintainance collected and completion of amenitiesAUTHORITY16/03/2026
Javed Ahmad vs sai kalyan builders and developers private limitedProject completion as committed and compensation for delay as per agreementAUTHORITY16/03/2026
Sanjaya Kumar Jena vs sai kalyan builders and developers private limitedProject completion as committed and compensation for delayAUTHORITY16/03/2026
Padma Subramanian vs sai kalyan builders and developers private limitedTo complete the project by providing all the amenities mentioned as per agreement, to furnish OC, to instruct builder to refund the maintenance amount collected from March 2021 to till date.AUTHORITY16/03/2026
Muzammil Khan vs sai kalyan builders and developers private limitedCompletion of Amenties, Provide OC from BBMP and Refund of excess Property Tax collectedAUTHORITY16/03/2026
Vijaya Kumar GS vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Arunpandiyan Kumaran vs sai kalyan builders and developers private limitedPending Amenities and Compensation for delay, Run Sewage treatment plant as per government norms for safe life for society as it is currently implemented without proper planAUTHORITY16/03/2026
Jayanthi Pratap vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Nagaraj G vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from October 2021 to Till dateAUTHORITY16/03/2026
Basavana Gowda RH vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till dateAUTHORITY16/03/2026
Akhaya Kumar Mishra vs sai kalyan builders and developers private limitedProject Completion as per the agreement and compensation for the delay in completionAUTHORITY16/03/2026
Siddesh H K vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2020 to Till date.AUTHORITY16/03/2026
Suhas Nadiger vs sai kalyan builders and developers private limitedProject completion and compensation for the delay.AUTHORITY16/03/2026
Puttur Rajasekara Reddy vs sai kalyan builders and developers private limitedNeed to have complete all Amenities with help of ReraAUTHORITY16/03/2026
Nivya J vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay per the agreementAUTHORITY16/03/2026
kumar Manish vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till dateAUTHORITY16/03/2026
Aditya Raj vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per agreement. Also whatever extra amount I have paid for the property tax and advance maintenance, I want that refundAUTHORITY16/03/2026
Gayatri Ramesh Kamat vs sai kalyan builders and developers private limitedEarly & immidiate completion of project in all respect with quality and handing over to RWA. Restoring UDS of flat owners as per absolute sale deed.AUTHORITY16/03/2026
SUSHMITA vs sai kalyan builders and developers private limitedPROJECT COMPLETION AS COMMITTED AND COMPENSATION FOR THE DELAY AS PER THE AGREEMENTAUTHORITY16/03/2026
Yash Verma vs sai kalyan builders and developers private limitedProper Completion of Project along with OC and CC. Refund of maintainence amount collected from September 2018 till date along with compensation for delay.AUTHORITY16/03/2026
Pradeep Teekinavar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Arpan Kumar Behera vs sai kalyan builders and developers private limitedGet the amenities completed as comitted by builderAUTHORITY16/03/2026
Deepak Prajapati vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreementAUTHORITY16/03/2026
Sushma Kudupaje Kushalappa vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreement and RERA guidelines.AUTHORITY16/03/2026
Aditya Dayananda Rao vs sai kalyan builders and developers private limitedInstruct builder : Complete project, Get OC and refund maintainance amount collected OR Provide compensation of 25Lacs for loss of property value due to unfinished projectAUTHORITY16/03/2026
Sandeep Kumar B N vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from January 2023 to Till date.AUTHORITY16/03/2026
Ankit Jain vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Venkateswara Varaprasad K vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish full OC and compensation of delay in completing project.AUTHORITY16/03/2026
Abhishek Gaurav vs sai kalyan builders and developers private limitedEnforce RERA Rules and make sure the promised amenities are completed and the project is handed over. Also compensation needed for delay in project which is more than two yearsAUTHORITY16/03/2026
M V Shrish vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreementAUTHORITY16/03/2026
Ajit Kumar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement.To Furnish OC . To instruct builder to Refund the maintenance amount collected Till dateAUTHORITY16/03/2026
Shivaraj M vs sai kalyan builders and developers private limitedAs specified in the facts of complaint The Complainant fought for the amenities, OC from BBMPAUTHORITY16/03/2026
Kiran shantharama shet vs sai kalyan builders and developers private limitedProject competition as per advertised and promised and compensation for delay in projectAUTHORITY16/03/2026
Tushar Manohar Padole vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till dateAUTHORITY16/03/2026
Antriksh Chandresh Gupta vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To furnish OC. Provide the compensation for the delay in project.AUTHORITY16/03/2026
UDAY HATTANGADI vs sai kalyan builders and developers private limitedCompletion of pending basic Amenities, getting Occupancy Certificate, Khata certificate, handing over of affairs to RWA, Refund of Rs.45540/= charged towards maintenance charges already (mentioned inAUTHORITY16/03/2026
Neetu Luthra vs sai kalyan builders and developers private limitedAs specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damagesAUTHORITY16/03/2026
Sambasiva Sagar Pakki vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreement.AUTHORITY16/03/2026
Gaurav Umesh Kumar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Siddhant Wadhera vs sai kalyan builders and developers private limitedProject Completion, provide OC and pay compensation for the delay at the earliestAUTHORITY16/03/2026
ANKUR CHATURVEDI vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per agreementAUTHORITY16/03/2026
Pankaj Kumar Sheoram vs sai kalyan builders and developers private limitedProject completion as committed and compensation for delays as per agreementAUTHORITY16/03/2026
Dr NS Senthil Kumar vs sai kalyan builders and developers private limitedProject Completion & Compensation, Legal action against the BuilderAUTHORITY16/03/2026
Shobhit Chaturvedi vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Sivaprasad Nadukuru vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreement.AUTHORITY16/03/2026
Mallikarjun M Maharajpet vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Sumon Mookherjee vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to provide OC .AUTHORITY16/03/2026
Thiagarajan SVR vs sai kalyan builders and developers private limitedProject completion as committed by Builder/Land owner, OC, completion of all pending points and compensation for the delayAUTHORITY16/03/2026
Tarique Sayeed Nasser vs sai kalyan builders and developers private limitedProject Completion as committed, Compensation of delay and full OC of ProjectAUTHORITY16/03/2026
NAVEEN KUMAR K S vs sai kalyan builders and developers private limitedProject completion as committed and compensate for the delay as per the agreement.AUTHORITY16/03/2026
Greeshma Shetty vs sai kalyan builders and developers private limitedProject completion as committed and provide compensation for the delayAUTHORITY16/03/2026
S PARAMASIVAN vs sai kalyan builders and developers private limitedCompletion of the project in all respects without any further delay. To give strict instruction to SAI Kalyan builder & ATZ Properties to complete the project immediately and obtain OC.AUTHORITY16/03/2026
Abhishek Behera vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Sushitha P R vs sai kalyan builders and developers private limitedProject completion and compensation for delay. Timely maintenance needed.AUTHORITY16/03/2026
Debasish Chakrabartty vs sai kalyan builders and developers private limitedTo complete the project by providing all the amenities mentioned as per agreement. To Furnish OC. To instruct Builder to Refund the maintenance amount collected from March 2021 to Till Date.AUTHORITY16/03/2026
Vivek GS vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Sadashivaiah TG vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refundthe maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Amit Shrestra vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to furnish OC .AUTHORITY16/03/2026
SREEDHAR REDDY vs sai kalyan builders and developers private limitedProject completion as committed and compensate for the delay as per the agreementAUTHORITY16/03/2026
Senthil Kumar vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delayAUTHORITY16/03/2026
Vinod Tatti vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Gurpreet Singh Panesar vs sai kalyan builders and developers private limitedCompletion of all amenities with compensation for delay or complete funds from builder and we will complete themAUTHORITY16/03/2026
Pradeep Pai Karthattu vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC .AUTHORITY16/03/2026
Himansu Sekhar Pati vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from the day I got the possession..AUTHORITY16/03/2026
Santoshkumar B Hattaraki vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from July 2022 to Till date.AUTHORITY16/03/2026
sajeed ahamed vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreementAUTHORITY16/03/2026
Smita S Angadi vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
ARUNKUMAR YADAV vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
NITIN AGARWAL vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Brijessh Kumar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to furnish OC and instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Nithin vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per aggrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Suman Kumari vs sai kalyan builders and developers private limitedProject completion as committed and compensation for delay as per agreementAUTHORITY16/03/2026
Rupam Ghosal vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . To instruct builder to Refund the maintenance amount collected .AUTHORITY16/03/2026
Pramoda BS vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . To instruct builder to Refund the maintenance amount collected from December 2019 to Till date.AUTHORITY16/03/2026
Suraj Ankolekar vs sai kalyan builders and developers private limitedProject Completion as committed and compensation for the delay as per agreementAUTHORITY16/03/2026
Kamesh K S vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Sachin Borgave vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Joydeep Mondal vs sai kalyan builders and developers private limitedTo complete the project as per the amenities mentioned in the agreement. To furnish complete OC. Most importantly to instruct the builder to refund the advance maintainance fee collected.AUTHORITY16/03/2026
Aneelkumar Savalagi vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delay as per the agreementAUTHORITY16/03/2026
Manjoorilahi Mohamadshappi Shamsher vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2019 to Till date.AUTHORITY16/03/2026
Mazhar A Shaikh vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from April 2019 to Till date.AUTHORITY16/03/2026
Sanjib Dhara vs sai kalyan builders and developers private limitedRERA should ask the builder to compensate the residents for incomplete tasks, get the OC and handover the project to the RWAAUTHORITY16/03/2026
MANDALA SHESHADRI RUPESH vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY16/03/2026
Yogesh Basavaraj vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2020 to Till date.AUTHORITY16/03/2026
Abdullah Khlaif vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement and to Furnish OC . To instruct builder to Refund the maintenance amount collectedAUTHORITY16/03/2026
Tirthadeep Chakraborty vs sai kalyan builders and developers private limitedProject Completion by providing all the amenities mentioned as per agreement , To Furnish OC ASAP . Maintenance calculation to be done from date of Production of OC , not Handover , Refund Remaining.AUTHORITY16/03/2026
Lakshmipathi KR vs sai kalyan builders and developers private limitedTo Complete the project by providing all the amenities mentioned as per agreement To furnish OC. To instruct builder to refund the maintaenance amount collected from March 2021 to Til date.AUTHORITY16/03/2026
MEDA SRI VENKATESWARARAO vs sai kalyan builders and developers private limitedProject Completion as committed and compensation for the delay as per agreementAUTHORITY16/03/2026
Ranjit Kumar vs sai kalyan builders and developers private limitedForce builder to complete the project and get full OC. Also, as compensation pay to me the the full EMI, that I have paid to the bank till the last amenity gets completed..AUTHORITY16/03/2026
Mayank Chaturvedi vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per aggrement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Karthik Kamath K R vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2019 to Till date.AUTHORITY16/03/2026
Ashwini Nayak and Amith Nayak vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refundthe maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Apurba Adhikari vs sai kalyan builders and developers private limitedProject Completion as Committed and Compensation for the delay as per AgreementAUTHORITY16/03/2026
VELURU NAGARJUNA vs sai kalyan builders and developers private limitedProject completion, OC and compensation for project delay as per agreementAUTHORITY16/03/2026
Aman Pratap Singh and Shikha Singh vs sai kalyan builders and developers private limitedPlease direct builder to complete the project with proper facilities and provide us compensation of the amount which we paid and suffering from last 3 years.AUTHORITY16/03/2026
Vijay Sankar vs sai kalyan builders and developers private limitedProject completion and compensation for the delay as per the agreementAUTHORITY16/03/2026
Nagarjun Makam vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Anand Chellappa Bose vs sai kalyan builders and developers private limitedEnforce builders to complete the project or compensate the home buyers appropriately with penal interest on delaying the project.AUTHORITY16/03/2026
Gurjit Kaur vs sai kalyan builders and developers private limitedBuilder should complete all amenities. Pay as fine the total amount I paid to the bank for home loan and maintenance paid till the amenities are completed.AUTHORITY16/03/2026
Ashwani Kumar Kammara vs sai kalyan builders and developers private limitedPending amenities to be completed. Refund of the maintenance amount. For delay in project completion, pay fine at SBI rate.AUTHORITY16/03/2026
Abu zar vs sai kalyan builders and developers private limitedBuilder should complete all the amenities promised. Pay as fine, the entire amount I paid to the bank as home loan and maintenance till the amenities are completed.AUTHORITY16/03/2026
Sohit Kumar Chauhan vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Murali Radha Gummidi vs sai kalyan builders and developers private limitedProject Completion with all Amenities and compensation for the delay as per agreementAUTHORITY16/03/2026
Amruth SK vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY16/03/2026
MOHD REHAN PEERZADE vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date.AUTHORITY16/03/2026
Mohammed Ghiasul Hasan vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
RAVI KUMAR ALIMI vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY16/03/2026
ABHINANDAN B A vs sai kalyan builders and developers private limitedPROJECT COMPLETION AS COMMITTED AND COMPENSATION FOR THE DELAY AS PER THE AGREEMENTAUTHORITY16/03/2026
Naheed Kausar vs sai kalyan builders and developers private limitedProject completion as committed, OC and compensation for the delay as per agreement.AUTHORITY16/03/2026
Nikhila Rao vs sai kalyan builders and developers private limitedproject completion as per the agreement and compensation for the delay in completionAUTHORITY16/03/2026
Mahesh Araganji vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per the agreement. To Furnish OC. To instruct builder to Refund the maintenance amount collected from March 2021 to Till date.AUTHORITY16/03/2026
Prabhat Kumar Srivastava vs sai kalyan builders and developers private limitedBUILDER SHOULD PROVIDE THE PROJECT AS PER THE AGREEMENT. BUILDER HAS TO COMPLETE THE AMENITIES AND PROVIDE THE COMPLETE HANDOVER WITH OC AND CC . PROVIDE COMPENSATION FOR THE DELAYAUTHORITY16/03/2026
Vinay Patil vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC. To instruct builder to Refund the maintenance amount collected in advance towards maintenance.AUTHORITY16/03/2026
ganapathy suresh vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2018 to Till date.AUTHORITY16/03/2026
Chidamber Kumar vs sai kalyan builders and developers private limitedProject completion as committed and compensation for the delayAUTHORITY16/03/2026
Janardhana D vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY16/03/2026
Sourabh Thapak vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date.AUTHORITY16/03/2026
Mohammad Sirazuddin vs sai kalyan builders and developers private limitedInterest on delay periodAUTHORITY16/03/2026
Raj Kumar Swarnakar vs sai kalyan builders and developers private limitedProject completion as advertised and promisedAUTHORITY09/01/2026
Rajesh vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned in brochure and construction Agreement.To furnish Occupancy certificate issued by BBMPAUTHORITY09/01/2026
Jyoteesh Akurati vs sai kalyan builders and developers private limitedProject completion as advertised and promisedAUTHORITY09/01/2026
Bipin Kumar Choudhary vs sai kalyan builders and developers private limitedProject completion as advertised and promisedAUTHORITY09/01/2026
Shivanand Nirwani vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC by BBMPAUTHORITY09/01/2026
Rahul Tayal vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned in brochure and construction AgreementAUTHORITY09/01/2026
Mohammad Shaheed Bakshi vs sai kalyan builders and developers private limitedTo complete the project by providing all amenities mentioned as per the agreement.AUTHORITY09/01/2026
Sumit Srivastava vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement. To Furnish OC.AUTHORITY09/01/2026
Kanak Kumari vs sai kalyan builders and developers private limitedBuilder should complete all the amenities as promised in the brochure and agreement. Till everything gets completed, builder should pay me entire principal plus interest part of my home loanAUTHORITY09/01/2026
Meghna Suresh vs sai kalyan builders and developers private limitedCompletion of the project at the earliest or handover the amenities funds collected to associationAUTHORITY09/01/2026
DR RAMPRASAD KUNCHAM vs sai kalyan builders and developers private limitedComplete amenities, OC from BBMP, liquidated damagesAUTHORITY09/01/2026
Rahul Pawar vs sai kalyan builders and developers private limitedCompletion of Project as advertised and promisedAUTHORITY09/01/2026
Kumar Patibandla vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from october 2021 to Till date.AUTHORITY09/01/2026
AKHILESH KUMAR vs sai kalyan builders and developers private limitedAs specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP.AUTHORITY09/01/2026
Karan Luthra vs sai kalyan builders and developers private limitedAs specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damagesAUTHORITY09/01/2026
Rishiraj Nanda vs sai kalyan builders and developers private limitedIntervention to get all documents and formalities completed from the builder and handed over to the association. Impose a fine on the builder for not completing most amenities for the project.AUTHORITY09/01/2026
Gururaj Mahendrakar vs sai kalyan builders and developers private limitedCompletion of Project and handoverAUTHORITY09/01/2026
V Dinakara Reddy vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC .AUTHORITY09/01/2026
Adarsh Karabasannavar vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC .AUTHORITY09/01/2026
Subhendu Sundar Sahoo vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC .AUTHORITY09/01/2026
Bimohit Patnaik vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and furnish OCAUTHORITY09/01/2026
Abhijit Mohapatra vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC .AUTHORITY09/01/2026
Bighnaraj Samantaray vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement and to furnish OC .AUTHORITY09/01/2026
Krishna Kishore Sribhashyam vs sai kalyan builders and developers private limitedProject and Amenities completion as committed. Furnish OCAUTHORITY09/01/2026
Pushpa Nath Jha vs sai kalyan builders and developers private limitedRERA to do the needful with the sole objective of COMPLETION OF PROJECT in all respectsAUTHORITY09/01/2026
NITHIN URS B V vs sai kalyan builders and developers private limitedProject completion as mentioned in the project plan and compensation for the relief.AUTHORITY09/01/2026
shashi B Hattaraki vs sai kalyan builders and developers private limitedTo complete the project by providing all the amenities mentioned as per agreement and to furnish OC.AUTHORITY09/01/2026
ASHISH KANHAIYALAL DAYMA vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement &to Furnish OC.AUTHORITY09/01/2026
NISITH KUMAR DANDAPAT vs sai kalyan builders and developers private limitedTo intervene for early completion of the Project by the Builder with all promised amenities as per agreement and to furnish OCAUTHORITY09/01/2026
Kannappa MK vs sai kalyan builders and developers private limitedHandover from build with all assured Amenities with qualityAUTHORITY09/01/2026
Muthu Saravanan V P vs sai kalyan builders and developers private limitedComplete the Ultima project including all the mentioned amenities with good quality. Fix the problems in already completed amenities. Expedite the OC.AUTHORITY09/01/2026
Rajesh Mysore vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To get full OC as per the agreementAUTHORITY09/01/2026
Tapan Kumar Das vs sai kalyan builders and developers private limitedTo complete the Project by providing all the amenities mentioned as per agreement. To Furnish OCAUTHORITY09/01/2026
K Usha Devi vs sai kalyan builders and developers private limitedCompletion of all promised amenities , Provide Occupancy CertificateAUTHORITY09/01/2026
Ashok Kumar S G vs sai kalyan builders and developers private limited- To complete the Project by providing all the amenities mentioned in brochure and construction Agreement entered by the builder with owners within specified time. - To furnish Occupancy certificateAUTHORITY09/01/2026
Rakesh Sharma Peesapati vs sai kalyan builders and developers private limitedProject completion and relief sought as per the agreementAUTHORITY09/01/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Builder track record

RERA filing

Sai Kalyan has 3 other K-RERA-registered projects in our records. 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹19.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: CORPORATION BANK MALLESWARAM (IFSC CORP0000056, a/c …0497). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~14 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
MG Road / city centre12 km
Outer Ring Road / Manyata14 km
Bellandur–Marathahalli belt22 km
Electronic City25 km
Whitefield IT hub27 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sai Kalyan.
Sai Kalyan has 4 projects registered in Bangalore.

Other projects by this builder in Bangalore

Sai Kalyan Ballari Pearld
No filings

Other RERA-registered projects in Bharat Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Ultima?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026