RERA Property Intelligence Report · Preview
sai kalyan builders and developers · Bengaluru North · K-RERA PRM/KA/RERA/1251/309/PR/171021/001218
Report coverage
K-RERA registry & builder-record report
What this report covers
To confirm directly with the builder
🔒 The verdict & buyer playbook · Compliance report
The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 364 | Total inventory registered with K-RERA. |
| Official carpet area | 29,296 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 16,181 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.25 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 5 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 364 total (0 open) — 1.00 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 03-01-2016 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| FLATS | 364 | 100% | 29,296 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| BLOCK A | 13 | 82 | 82 | - |
| BLOCK B | 13 | 82 | 82 | - |
| BLOCK C | 13 | 82 | 82 | - |
| BLOCK D | 13 | 82 | 82 | - |
| BLOCK E | 5 | 36 | 36 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 364 official flat/unit rows, matching the 364 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 294 | 718.3-770.4 sqft | 422.3-451.0 sqft | 294 |
| 3BHK | 70 | 947.8-1,227.4 sqft | 553.5-861.0 sqft | 70 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| BLOCK A | 82 | 718.3-1,227.4 sqft | 422.3-861.0 sqft | 82 |
| BLOCK B | 82 | 718.3-1,227.4 sqft | 422.3-861.0 sqft | 82 |
| BLOCK C | 82 | 718.5-1,227.4 sqft | 422.3-861.0 sqft | 82 |
| BLOCK D | 82 | 718.5-1,227.4 sqft | 422.3-861.0 sqft | 82 |
| BLOCK E | 36 | 718.3-947.8 sqft | 422.3-553.5 sqft | 36 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| G1 | BLOCK A | 0 | 2BHK | 770.4 sqft | 451.0 sqft | 1 |
| G2 | BLOCK A | 0 | 2BHK | 718.3 sqft | 422.3 sqft | 1 |
| G3 | BLOCK A | 0 | 2BHK | 718.3 sqft | 422.3 sqft | 1 |
| G4 | BLOCK A | 0 | 2BHK | 730.5 sqft | 430.5 sqft | 1 |
| G5 | BLOCK A | 0 | 2BHK | 730.5 sqft | 430.5 sqft | 1 |
| G6 | BLOCK A | 0 | 3BHK | 947.8 sqft | 553.5 sqft | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Unit-by-unit guidance · Unit Guidance report
Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.
🔒 Full records — land title, amenities paperwork & document catalog · Compliance report
The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.
No litigation declared on this project's K-RERA filing.
All 19 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Jan 2019, extended (Section 6 Extension) to 31 Jan 2020 — both dates have passed with no OC on file. The extension on file was granted on 19 Jul 2019 (K-RERA extension no. EX/PRM/KA/RERA/1251/309/PR/190719/001218) — it has been used, its deadline has also passed, and no further extension is recorded.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (171 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Pradeep K Srivastava vs sai kalyan builders and developers private limited | To complete the project, To furnish OC, To refund maintenance collected from March 2021. | AUTHORITY | 21/01/2026 |
| RAKESH KUMAR SONI vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date | AUTHORITY | 21/01/2026 |
| Prashant Shukla vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to furnish OC. To instruct builder to Refund the maintenance amount collected from March 2019 to Till date. | AUTHORITY | 21/01/2026 |
| Tanumoy Sett vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 21/01/2026 |
| Niraj Chandrakar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Aqeeluddin Saiyad vs sai kalyan builders and developers private limited | Project Completion as per the agreement and compensation as per agreement | AUTHORITY | 16/03/2026 |
| Ultima Smart Homes Owners Asssociation vs sai kalyan builders and developers private limited | As specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damages | AUTHORITY | 16/03/2026 |
| Anurag Kumar vs sai kalyan builders and developers private limited | Force builder to complete the project and as compensation pay to me the interest part of EMI, that I had paid till date to the bank | AUTHORITY | 16/03/2026 |
| BHUPAL REDDY P vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Siny Saleesh vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Shabeer Ahmed vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Swaroop Kumar Sana vs sai kalyan builders and developers private limited | Project Completion as per the agreement and compensation for the delay in completion | AUTHORITY | 16/03/2026 |
| Gaurav Kumar vs sai kalyan builders and developers private limited | Project completion as committed with the promised amenities and compensation for the delay as per the agreement. | AUTHORITY | 16/03/2026 |
| MANISH RANJAN vs sai kalyan builders and developers private limited | Project completion as committed with up to the mark quality of amenities and compensation for delay as per the agreement. | AUTHORITY | 16/03/2026 |
| Pratyesh Chandra Singh vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date | AUTHORITY | 16/03/2026 |
| Deepak Ushadevi vs sai kalyan builders and developers private limited | to complete amenities, to issue OC, to correct all structural defects in the pillars, walls. | AUTHORITY | 16/03/2026 |
| Pummy Kumari vs sai kalyan builders and developers private limited | As specified in the facts of complaints fought for the amenities, OC from BBMP, liquified Damages | AUTHORITY | 16/03/2026 |
| PRASHANT KUMAR SARANADAGOUDA vs sai kalyan builders and developers private limited | refund of advance maintainance collected and completion of amenities | AUTHORITY | 16/03/2026 |
| Javed Ahmad vs sai kalyan builders and developers private limited | Project completion as committed and compensation for delay as per agreement | AUTHORITY | 16/03/2026 |
| Sanjaya Kumar Jena vs sai kalyan builders and developers private limited | Project completion as committed and compensation for delay | AUTHORITY | 16/03/2026 |
| Padma Subramanian vs sai kalyan builders and developers private limited | To complete the project by providing all the amenities mentioned as per agreement, to furnish OC, to instruct builder to refund the maintenance amount collected from March 2021 to till date. | AUTHORITY | 16/03/2026 |
| Muzammil Khan vs sai kalyan builders and developers private limited | Completion of Amenties, Provide OC from BBMP and Refund of excess Property Tax collected | AUTHORITY | 16/03/2026 |
| Vijaya Kumar GS vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Arunpandiyan Kumaran vs sai kalyan builders and developers private limited | Pending Amenities and Compensation for delay, Run Sewage treatment plant as per government norms for safe life for society as it is currently implemented without proper plan | AUTHORITY | 16/03/2026 |
| Jayanthi Pratap vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Nagaraj G vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from October 2021 to Till date | AUTHORITY | 16/03/2026 |
| Basavana Gowda RH vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date | AUTHORITY | 16/03/2026 |
| Akhaya Kumar Mishra vs sai kalyan builders and developers private limited | Project Completion as per the agreement and compensation for the delay in completion | AUTHORITY | 16/03/2026 |
| Siddesh H K vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2020 to Till date. | AUTHORITY | 16/03/2026 |
| Suhas Nadiger vs sai kalyan builders and developers private limited | Project completion and compensation for the delay. | AUTHORITY | 16/03/2026 |
| Puttur Rajasekara Reddy vs sai kalyan builders and developers private limited | Need to have complete all Amenities with help of Rera | AUTHORITY | 16/03/2026 |
| Nivya J vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay per the agreement | AUTHORITY | 16/03/2026 |
| kumar Manish vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date | AUTHORITY | 16/03/2026 |
| Aditya Raj vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per agreement. Also whatever extra amount I have paid for the property tax and advance maintenance, I want that refund | AUTHORITY | 16/03/2026 |
| Gayatri Ramesh Kamat vs sai kalyan builders and developers private limited | Early & immidiate completion of project in all respect with quality and handing over to RWA. Restoring UDS of flat owners as per absolute sale deed. | AUTHORITY | 16/03/2026 |
| SUSHMITA vs sai kalyan builders and developers private limited | PROJECT COMPLETION AS COMMITTED AND COMPENSATION FOR THE DELAY AS PER THE AGREEMENT | AUTHORITY | 16/03/2026 |
| Yash Verma vs sai kalyan builders and developers private limited | Proper Completion of Project along with OC and CC. Refund of maintainence amount collected from September 2018 till date along with compensation for delay. | AUTHORITY | 16/03/2026 |
| Pradeep Teekinavar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Arpan Kumar Behera vs sai kalyan builders and developers private limited | Get the amenities completed as comitted by builder | AUTHORITY | 16/03/2026 |
| Deepak Prajapati vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Sushma Kudupaje Kushalappa vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement and RERA guidelines. | AUTHORITY | 16/03/2026 |
| Aditya Dayananda Rao vs sai kalyan builders and developers private limited | Instruct builder : Complete project, Get OC and refund maintainance amount collected OR Provide compensation of 25Lacs for loss of property value due to unfinished project | AUTHORITY | 16/03/2026 |
| Sandeep Kumar B N vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from January 2023 to Till date. | AUTHORITY | 16/03/2026 |
| Ankit Jain vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Venkateswara Varaprasad K vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish full OC and compensation of delay in completing project. | AUTHORITY | 16/03/2026 |
| Abhishek Gaurav vs sai kalyan builders and developers private limited | Enforce RERA Rules and make sure the promised amenities are completed and the project is handed over. Also compensation needed for delay in project which is more than two years | AUTHORITY | 16/03/2026 |
| M V Shrish vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Ajit Kumar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement.To Furnish OC . To instruct builder to Refund the maintenance amount collected Till date | AUTHORITY | 16/03/2026 |
| Shivaraj M vs sai kalyan builders and developers private limited | As specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP | AUTHORITY | 16/03/2026 |
| Kiran shantharama shet vs sai kalyan builders and developers private limited | Project competition as per advertised and promised and compensation for delay in project | AUTHORITY | 16/03/2026 |
| Tushar Manohar Padole vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date | AUTHORITY | 16/03/2026 |
| Antriksh Chandresh Gupta vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To furnish OC. Provide the compensation for the delay in project. | AUTHORITY | 16/03/2026 |
| UDAY HATTANGADI vs sai kalyan builders and developers private limited | Completion of pending basic Amenities, getting Occupancy Certificate, Khata certificate, handing over of affairs to RWA, Refund of Rs.45540/= charged towards maintenance charges already (mentioned in | AUTHORITY | 16/03/2026 |
| Neetu Luthra vs sai kalyan builders and developers private limited | As specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damages | AUTHORITY | 16/03/2026 |
| Sambasiva Sagar Pakki vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement. | AUTHORITY | 16/03/2026 |
| Gaurav Umesh Kumar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Siddhant Wadhera vs sai kalyan builders and developers private limited | Project Completion, provide OC and pay compensation for the delay at the earliest | AUTHORITY | 16/03/2026 |
| ANKUR CHATURVEDI vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per agreement | AUTHORITY | 16/03/2026 |
| Pankaj Kumar Sheoram vs sai kalyan builders and developers private limited | Project completion as committed and compensation for delays as per agreement | AUTHORITY | 16/03/2026 |
| Dr NS Senthil Kumar vs sai kalyan builders and developers private limited | Project Completion & Compensation, Legal action against the Builder | AUTHORITY | 16/03/2026 |
| Shobhit Chaturvedi vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Sivaprasad Nadukuru vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement. | AUTHORITY | 16/03/2026 |
| Mallikarjun M Maharajpet vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Sumon Mookherjee vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to provide OC . | AUTHORITY | 16/03/2026 |
| Thiagarajan SVR vs sai kalyan builders and developers private limited | Project completion as committed by Builder/Land owner, OC, completion of all pending points and compensation for the delay | AUTHORITY | 16/03/2026 |
| Tarique Sayeed Nasser vs sai kalyan builders and developers private limited | Project Completion as committed, Compensation of delay and full OC of Project | AUTHORITY | 16/03/2026 |
| NAVEEN KUMAR K S vs sai kalyan builders and developers private limited | Project completion as committed and compensate for the delay as per the agreement. | AUTHORITY | 16/03/2026 |
| Greeshma Shetty vs sai kalyan builders and developers private limited | Project completion as committed and provide compensation for the delay | AUTHORITY | 16/03/2026 |
| S PARAMASIVAN vs sai kalyan builders and developers private limited | Completion of the project in all respects without any further delay. To give strict instruction to SAI Kalyan builder & ATZ Properties to complete the project immediately and obtain OC. | AUTHORITY | 16/03/2026 |
| Abhishek Behera vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Sushitha P R vs sai kalyan builders and developers private limited | Project completion and compensation for delay. Timely maintenance needed. | AUTHORITY | 16/03/2026 |
| Debasish Chakrabartty vs sai kalyan builders and developers private limited | To complete the project by providing all the amenities mentioned as per agreement. To Furnish OC. To instruct Builder to Refund the maintenance amount collected from March 2021 to Till Date. | AUTHORITY | 16/03/2026 |
| Vivek GS vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Sadashivaiah TG vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refundthe maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Amit Shrestra vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to furnish OC . | AUTHORITY | 16/03/2026 |
| SREEDHAR REDDY vs sai kalyan builders and developers private limited | Project completion as committed and compensate for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Senthil Kumar vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay | AUTHORITY | 16/03/2026 |
| Vinod Tatti vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Gurpreet Singh Panesar vs sai kalyan builders and developers private limited | Completion of all amenities with compensation for delay or complete funds from builder and we will complete them | AUTHORITY | 16/03/2026 |
| Pradeep Pai Karthattu vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . | AUTHORITY | 16/03/2026 |
| Himansu Sekhar Pati vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from the day I got the possession.. | AUTHORITY | 16/03/2026 |
| Santoshkumar B Hattaraki vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from July 2022 to Till date. | AUTHORITY | 16/03/2026 |
| sajeed ahamed vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Smita S Angadi vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| ARUNKUMAR YADAV vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| NITIN AGARWAL vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Brijessh Kumar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to furnish OC and instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Nithin vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per aggrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Suman Kumari vs sai kalyan builders and developers private limited | Project completion as committed and compensation for delay as per agreement | AUTHORITY | 16/03/2026 |
| Rupam Ghosal vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . To instruct builder to Refund the maintenance amount collected . | AUTHORITY | 16/03/2026 |
| Pramoda BS vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . To instruct builder to Refund the maintenance amount collected from December 2019 to Till date. | AUTHORITY | 16/03/2026 |
| Suraj Ankolekar vs sai kalyan builders and developers private limited | Project Completion as committed and compensation for the delay as per agreement | AUTHORITY | 16/03/2026 |
| Kamesh K S vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Sachin Borgave vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Joydeep Mondal vs sai kalyan builders and developers private limited | To complete the project as per the amenities mentioned in the agreement. To furnish complete OC. Most importantly to instruct the builder to refund the advance maintainance fee collected. | AUTHORITY | 16/03/2026 |
| Aneelkumar Savalagi vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Manjoorilahi Mohamadshappi Shamsher vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2019 to Till date. | AUTHORITY | 16/03/2026 |
| Mazhar A Shaikh vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from April 2019 to Till date. | AUTHORITY | 16/03/2026 |
| Sanjib Dhara vs sai kalyan builders and developers private limited | RERA should ask the builder to compensate the residents for incomplete tasks, get the OC and handover the project to the RWA | AUTHORITY | 16/03/2026 |
| MANDALA SHESHADRI RUPESH vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 16/03/2026 |
| Yogesh Basavaraj vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2020 to Till date. | AUTHORITY | 16/03/2026 |
| Abdullah Khlaif vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement and to Furnish OC . To instruct builder to Refund the maintenance amount collected | AUTHORITY | 16/03/2026 |
| Tirthadeep Chakraborty vs sai kalyan builders and developers private limited | Project Completion by providing all the amenities mentioned as per agreement , To Furnish OC ASAP . Maintenance calculation to be done from date of Production of OC , not Handover , Refund Remaining. | AUTHORITY | 16/03/2026 |
| Lakshmipathi KR vs sai kalyan builders and developers private limited | To Complete the project by providing all the amenities mentioned as per agreement To furnish OC. To instruct builder to refund the maintaenance amount collected from March 2021 to Til date. | AUTHORITY | 16/03/2026 |
| MEDA SRI VENKATESWARARAO vs sai kalyan builders and developers private limited | Project Completion as committed and compensation for the delay as per agreement | AUTHORITY | 16/03/2026 |
| Ranjit Kumar vs sai kalyan builders and developers private limited | Force builder to complete the project and get full OC. Also, as compensation pay to me the the full EMI, that I have paid to the bank till the last amenity gets completed.. | AUTHORITY | 16/03/2026 |
| Mayank Chaturvedi vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per aggrement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Karthik Kamath K R vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2019 to Till date. | AUTHORITY | 16/03/2026 |
| Ashwini Nayak and Amith Nayak vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refundthe maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Apurba Adhikari vs sai kalyan builders and developers private limited | Project Completion as Committed and Compensation for the delay as per Agreement | AUTHORITY | 16/03/2026 |
| VELURU NAGARJUNA vs sai kalyan builders and developers private limited | Project completion, OC and compensation for project delay as per agreement | AUTHORITY | 16/03/2026 |
| Aman Pratap Singh and Shikha Singh vs sai kalyan builders and developers private limited | Please direct builder to complete the project with proper facilities and provide us compensation of the amount which we paid and suffering from last 3 years. | AUTHORITY | 16/03/2026 |
| Vijay Sankar vs sai kalyan builders and developers private limited | Project completion and compensation for the delay as per the agreement | AUTHORITY | 16/03/2026 |
| Nagarjun Makam vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Anand Chellappa Bose vs sai kalyan builders and developers private limited | Enforce builders to complete the project or compensate the home buyers appropriately with penal interest on delaying the project. | AUTHORITY | 16/03/2026 |
| Gurjit Kaur vs sai kalyan builders and developers private limited | Builder should complete all amenities. Pay as fine the total amount I paid to the bank for home loan and maintenance paid till the amenities are completed. | AUTHORITY | 16/03/2026 |
| Ashwani Kumar Kammara vs sai kalyan builders and developers private limited | Pending amenities to be completed. Refund of the maintenance amount. For delay in project completion, pay fine at SBI rate. | AUTHORITY | 16/03/2026 |
| Abu zar vs sai kalyan builders and developers private limited | Builder should complete all the amenities promised. Pay as fine, the entire amount I paid to the bank as home loan and maintenance till the amenities are completed. | AUTHORITY | 16/03/2026 |
| Sohit Kumar Chauhan vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Murali Radha Gummidi vs sai kalyan builders and developers private limited | Project Completion with all Amenities and compensation for the delay as per agreement | AUTHORITY | 16/03/2026 |
| Amruth SK vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 16/03/2026 |
| MOHD REHAN PEERZADE vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . To instruct builder to Refund the maintenance amount collected from September 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Mohammed Ghiasul Hasan vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| RAVI KUMAR ALIMI vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 16/03/2026 |
| ABHINANDAN B A vs sai kalyan builders and developers private limited | PROJECT COMPLETION AS COMMITTED AND COMPENSATION FOR THE DELAY AS PER THE AGREEMENT | AUTHORITY | 16/03/2026 |
| Naheed Kausar vs sai kalyan builders and developers private limited | Project completion as committed, OC and compensation for the delay as per agreement. | AUTHORITY | 16/03/2026 |
| Nikhila Rao vs sai kalyan builders and developers private limited | project completion as per the agreement and compensation for the delay in completion | AUTHORITY | 16/03/2026 |
| Mahesh Araganji vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per the agreement. To Furnish OC. To instruct builder to Refund the maintenance amount collected from March 2021 to Till date. | AUTHORITY | 16/03/2026 |
| Prabhat Kumar Srivastava vs sai kalyan builders and developers private limited | BUILDER SHOULD PROVIDE THE PROJECT AS PER THE AGREEMENT. BUILDER HAS TO COMPLETE THE AMENITIES AND PROVIDE THE COMPLETE HANDOVER WITH OC AND CC . PROVIDE COMPENSATION FOR THE DELAY | AUTHORITY | 16/03/2026 |
| Vinay Patil vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC. To instruct builder to Refund the maintenance amount collected in advance towards maintenance. | AUTHORITY | 16/03/2026 |
| ganapathy suresh vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2018 to Till date. | AUTHORITY | 16/03/2026 |
| Chidamber Kumar vs sai kalyan builders and developers private limited | Project completion as committed and compensation for the delay | AUTHORITY | 16/03/2026 |
| Janardhana D vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 16/03/2026 |
| Sourabh Thapak vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement Furnish OC . To instruct builder to Refund the maintenance amount collected from March 2022 to Till date. | AUTHORITY | 16/03/2026 |
| Mohammad Sirazuddin vs sai kalyan builders and developers private limited | Interest on delay period | AUTHORITY | 16/03/2026 |
| Raj Kumar Swarnakar vs sai kalyan builders and developers private limited | Project completion as advertised and promised | AUTHORITY | 09/01/2026 |
| Rajesh vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned in brochure and construction Agreement.To furnish Occupancy certificate issued by BBMP | AUTHORITY | 09/01/2026 |
| Jyoteesh Akurati vs sai kalyan builders and developers private limited | Project completion as advertised and promised | AUTHORITY | 09/01/2026 |
| Bipin Kumar Choudhary vs sai kalyan builders and developers private limited | Project completion as advertised and promised | AUTHORITY | 09/01/2026 |
| Shivanand Nirwani vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC by BBMP | AUTHORITY | 09/01/2026 |
| Rahul Tayal vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned in brochure and construction Agreement | AUTHORITY | 09/01/2026 |
| Mohammad Shaheed Bakshi vs sai kalyan builders and developers private limited | To complete the project by providing all amenities mentioned as per the agreement. | AUTHORITY | 09/01/2026 |
| Sumit Srivastava vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement. To Furnish OC. | AUTHORITY | 09/01/2026 |
| Kanak Kumari vs sai kalyan builders and developers private limited | Builder should complete all the amenities as promised in the brochure and agreement. Till everything gets completed, builder should pay me entire principal plus interest part of my home loan | AUTHORITY | 09/01/2026 |
| Meghna Suresh vs sai kalyan builders and developers private limited | Completion of the project at the earliest or handover the amenities funds collected to association | AUTHORITY | 09/01/2026 |
| DR RAMPRASAD KUNCHAM vs sai kalyan builders and developers private limited | Complete amenities, OC from BBMP, liquidated damages | AUTHORITY | 09/01/2026 |
| Rahul Pawar vs sai kalyan builders and developers private limited | Completion of Project as advertised and promised | AUTHORITY | 09/01/2026 |
| Kumar Patibandla vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agrrement.To Furnish OC . To instruct builder to Refund the maintenance amount collected from october 2021 to Till date. | AUTHORITY | 09/01/2026 |
| AKHILESH KUMAR vs sai kalyan builders and developers private limited | As specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP. | AUTHORITY | 09/01/2026 |
| Karan Luthra vs sai kalyan builders and developers private limited | As specified in the facts of complaint The Complainant fought for the amenities, OC from BBMP , liquated damages | AUTHORITY | 09/01/2026 |
| Rishiraj Nanda vs sai kalyan builders and developers private limited | Intervention to get all documents and formalities completed from the builder and handed over to the association. Impose a fine on the builder for not completing most amenities for the project. | AUTHORITY | 09/01/2026 |
| Gururaj Mahendrakar vs sai kalyan builders and developers private limited | Completion of Project and handover | AUTHORITY | 09/01/2026 |
| V Dinakara Reddy vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . | AUTHORITY | 09/01/2026 |
| Adarsh Karabasannavar vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC . | AUTHORITY | 09/01/2026 |
| Subhendu Sundar Sahoo vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . | AUTHORITY | 09/01/2026 |
| Bimohit Patnaik vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and furnish OC | AUTHORITY | 09/01/2026 |
| Abhijit Mohapatra vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to Furnish OC . | AUTHORITY | 09/01/2026 |
| Bighnaraj Samantaray vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement and to furnish OC . | AUTHORITY | 09/01/2026 |
| Krishna Kishore Sribhashyam vs sai kalyan builders and developers private limited | Project and Amenities completion as committed. Furnish OC | AUTHORITY | 09/01/2026 |
| Pushpa Nath Jha vs sai kalyan builders and developers private limited | RERA to do the needful with the sole objective of COMPLETION OF PROJECT in all respects | AUTHORITY | 09/01/2026 |
| NITHIN URS B V vs sai kalyan builders and developers private limited | Project completion as mentioned in the project plan and compensation for the relief. | AUTHORITY | 09/01/2026 |
| shashi B Hattaraki vs sai kalyan builders and developers private limited | To complete the project by providing all the amenities mentioned as per agreement and to furnish OC. | AUTHORITY | 09/01/2026 |
| ASHISH KANHAIYALAL DAYMA vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement &to Furnish OC. | AUTHORITY | 09/01/2026 |
| NISITH KUMAR DANDAPAT vs sai kalyan builders and developers private limited | To intervene for early completion of the Project by the Builder with all promised amenities as per agreement and to furnish OC | AUTHORITY | 09/01/2026 |
| Kannappa MK vs sai kalyan builders and developers private limited | Handover from build with all assured Amenities with quality | AUTHORITY | 09/01/2026 |
| Muthu Saravanan V P vs sai kalyan builders and developers private limited | Complete the Ultima project including all the mentioned amenities with good quality. Fix the problems in already completed amenities. Expedite the OC. | AUTHORITY | 09/01/2026 |
| Rajesh Mysore vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To get full OC as per the agreement | AUTHORITY | 09/01/2026 |
| Tapan Kumar Das vs sai kalyan builders and developers private limited | To complete the Project by providing all the amenities mentioned as per agreement. To Furnish OC | AUTHORITY | 09/01/2026 |
| K Usha Devi vs sai kalyan builders and developers private limited | Completion of all promised amenities , Provide Occupancy Certificate | AUTHORITY | 09/01/2026 |
| Ashok Kumar S G vs sai kalyan builders and developers private limited | - To complete the Project by providing all the amenities mentioned in brochure and construction Agreement entered by the builder with owners within specified time. - To furnish Occupancy certificate | AUTHORITY | 09/01/2026 |
| Rakesh Sharma Peesapati vs sai kalyan builders and developers private limited | Project completion and relief sought as per the agreement | AUTHORITY | 09/01/2026 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Sai Kalyan has 3 other K-RERA-registered projects in our records. 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹19.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: CORPORATION BANK MALLESWARAM (IFSC CORP0000056, a/c …0497). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.
The nearest major job hub is ~14 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.
| Landmark | Straight-line |
|---|---|
| MG Road / city centre | 12 km |
| Outer Ring Road / Manyata | 14 km |
| Bellandur–Marathahalli belt | 22 km |
| Electronic City | 25 km |
| Whitefield IT hub | 27 km |
| Kempegowda Int'l Airport | 31 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
Should you buy in ULTIMA?
This page is the free K-RERA filing summary. The full RERA Property Intelligence Report gives you buyer-complaint history, regulatory flags, builder track record, the official unit register, land title, NOCs, and (where the sanctioned plans support it) room-by-room unit data and an annotated site plan. See a real one first:
Sample: Sobha Silicon Oasis → · browse all sample reports →
Compliance Report · ₹999
The regulator’s filing record, read · 1 working day
Scan with any UPI app to pay · quietlist@kotak
Unit Guidance Report · ₹2,999
Everything, down to which unit · 1 working day
Not useful to your decision? Full refund — no questions asked.
Scan with any UPI app to pay · quietlist@kotak
Paying from outside India? Pay $15 (Compliance) or $39 (Unit Guidance) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes.
Built by Sai Kalyan.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.