VISISTA BY VISTA SPACES | OKAS

Bengaluru North · VISTA SPACES JAKKUR RESIDENCY

Know the project.
Then choose your home.

The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.

100%construction reportedQ1 2026 filing
90units not bookedof 236 · Q1 2026 filing
31 Dec 2026declared completionK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q1 2026

declared completion

31 Dec 2026

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

3BHK + TER.
1
3BHK + M ROOM
1
3BHK + TER.ABV.
4
3BHK
1
3BHK + M ROOM
1
3.5 BHK + M ROOM
1
3BHK + M ROOM + TER.
1
3BHK + TER.
1
2BHK + STUDY + TER ABV
1
3BHK
1
3BHK + TER.
1
2BHK + TER.
1
3BHK + TER.
1
3BHK + M ROOM
48
2BHK + STUDY + TER ABV
3
4 BHK + M ROOM + TER.
1
3BHK + TER.
1
3BHK
1
3.5 BHK + M ROOM + TER.
1
2BHK + TER.
1
4 BHK + M ROOM + TER.Q
1
3BHK
48
3BHK
6
3.5 BHK + M ROOM
48
3.5 BHK + M ROOM
2
3BHK + TER.
1
3BHK + TER.
1
3BHK + TER.
1
3BHK
42
3BHK + TER.
1
2BHK + STUDY + TER ABV
1
3BHK + M ROOM + TER.ABV.
4
3.5 BHK + M ROOM + TER.
1
3BHK + M ROOM + TER.
1
3.5 BHK + M ROOM + TER.
1
3BHK + TER.
1
2BHK + STUDY + TER ABV
3
3BHK + TER.
1

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

4.4registered acres

53.9registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/309/PR/011022/005287

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2026
Land area17,705 sq m (4.4 acres)
Homes registered236
Tower/wing entries4
Unit mix11 × 3BHK + TER., 50 × 3BHK + M ROOM, 4 × 3BHK + TER.ABV., 99 × 3BHK, 51 × 3.5 BHK + M ROOM, 2 × 3BHK + M ROOM + TER., 8 × 2BHK + STUDY + TER ABV, 2 × 2BHK + TE

In context

Density53.9 homes per acre
Density in context27th percentile of 525 Bengaluru North projects (median 75.4)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units236Total inventory registered with K-RERA.
Official carpet area29,555 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area57,800 sqmUseful scale context when comparing density and project cost.
Registered land area17,705 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries4Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)334Separate filed counts; these categories may overlap and are not added together.
Covered-parking field334Separate filed counts; these categories may overlap and are not added together.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberBBMP/Addl.Dir/JDNORTH/0027/21-22Use this to match the sanctioned drawing set shown by the builder.
Plan approval date11-04-2022
Project start date16-06-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3BHK + TER.10%119 sqm
3BHK + M ROOM10%127 sqm
3BHK + TER.ABV.42%135 sqm
3BHK10%119 sqm
3BHK + M ROOM10%127 sqm
3.5 BHK + M ROOM10%136 sqm
3BHK + M ROOM + TER.10%127 sqm
3BHK + TER.10%119 sqm
2BHK + STUDY + TER ABV10%130 sqm
3BHK10%119 sqm
3BHK + TER.10%117 sqm
2BHK + TER.10%26 sqm
3BHK + TER.10%94 sqm
3BHK + M ROOM4820%127 sqm
2BHK + STUDY + TER ABV31%119 sqm
4 BHK + M ROOM + TER.10%157 sqm
3BHK + TER.10%118 sqm
3BHK10%119 sqm
3.5 BHK + M ROOM + TER.10%136 sqm
2BHK + TER.10%97 sqm
4 BHK + M ROOM + TER.Q10%153 sqm
3BHK4820%119 sqm
3BHK63%119 sqm
3.5 BHK + M ROOM4820%136 sqm
3.5 BHK + M ROOM21%136 sqm
3BHK + TER.10%113 sqm
3BHK + TER.10%112 sqm
3BHK + TER.10%119 sqm
3BHK4218%119 sqm
3BHK + TER.10%113 sqm
2BHK + STUDY + TER ABV10%130 sqm
3BHK + M ROOM + TER.ABV.42%145 sqm
3.5 BHK + M ROOM + TER.10%136 sqm
3BHK + M ROOM + TER.10%127 sqm
3.5 BHK + M ROOM + TER.10%136 sqm
3BHK + TER.10%119 sqm
2BHK + STUDY + TER ABV31%120 sqm
3BHK + TER.10%119 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower-A15608549.95 m
Tower-B15588249.95 m
Tower-C15588249.95 m
Tower-D15608549.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 236 official flat/unit rows, matching the 236 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK16991.2-141.2 sqm61.6-95.2 sqm169
3.5 BHK56131.8-141.2 sqm77.5-95.2 sqm56
2 BHK990.5-126.9 sqm52.9-82.3 sqm9
4 BHK1153.1 sqm84.7 sqm1
4.5 BHK1149.1 sqm86.6 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower-A60108.1-141.2 sqm61.6-95.2 sqm60
Tower-D6091.2-153.1 sqm52.9-95.2 sqm60
Tower-B5890.5-141.2 sqm52.9-95.2 sqm58
Tower-C58113.3-141.2 sqm62.0-95.2 sqm58
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-101Tower-A13 BHK108.1 sqm61.6 sqm1
A-102Tower-A13 BHK109.9 sqm61.8 sqm1
A-103Tower-A13 BHK122.5 sqm69.9 sqm1
A-104Tower-A13.5 BHK131.8 sqm77.6 sqm1
A-201Tower-A23 BHK115.2 sqm75.1 sqm1
A-202Tower-A23 BHK116.0 sqm72.0 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

8 of 34 compliance document slots are filed as Not Applicable; the remaining 26 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

4 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved19-09-2022BWSSB NOC 19-09-2022.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved16-04-2022KSPCB CFE NOC 16-04-2022.pdf
KSPCB- MOEF (Above 50 Acres)Approved10-01-2022SEIAA MOEF NOC 10-01-2022.pdf
KPTCL- BESCOMApproved22-03-2021Bescom NOC 22-03-2021.pdf
Fire and SafetyApproved08-03-2022Fire NOC 08-03-2022.pdf
Airport Authority of IndiaApproved07-08-2020Airport NOC 07-08-2020.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantNAVAL JAIN5116972015Bengaluru Urban, Karnataka - 201306
EngineerBELLAD DINESH KUMARBCCL/BE-3.6/SE-0218/21-222009Bengaluru Urban, Karnataka - 560080
ArchitectV. NarasimhanCA/86/100341970Bengaluru Urban, Karnataka - 560025
ContractorNCC Urban Infrastructure Ltd-2006Gautam Buddha Nagar, Uttar Pradesh - 560064

Builder track record

RERA filing

Vista Spaces has 5 other K-RERA-registered projects in our records (average reported construction progress 69%). 3 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹12.66 Cr collected from buyers, ₹8.86 Cr withdrawn from the project's escrow account.

Construction progress90% → 100% (+10 pts)
Units sold/booked as registered146/236 (62%)
Buyer collections in available QPRs₹44.92 Cr
Escrow withdrawals in available QPRs₹31.52 Cr (0.70x collections)
  • Construction progress moved from 90% to 100% across the filed QPR window.
  • The builder has drawn 0.70x of buyer collections from escrow (about 70% of the ₹45 Cr collected) — money is largely staying in the regulated escrow account rather than being pulled out ahead of spend, which is the safer direction. A ratio near or above 1.0 would be the one to scrutinise.

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹67.3 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC BENGALURU - RICHMOND ROAD IFSC Code : HDFC0000523 Pin Code : 560025. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~6 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Outer Ring Road / Manyata6 km
MG Road / city centre13 km
Kempegowda Int'l Airport18 km
Bellandur–Marathahalli belt20 km
Whitefield IT hub22 km
Electronic City28 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Vista Spaces.
Vista Spaces has 6 projects registered in Bangalore, 1 completed.

Other projects by this builder in Bangalore

Vista Padmalaya
Due soon · 60% built · 40% sold
Vista Svara
Due soon · 78% built · 41% sold

Other RERA-registered projects in Yelahanka

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.