RERA Property Intelligence Report · Preview

ARYA’S AVADANA

ARYAVARIDHI PROJECTS · Hosakote · K-RERA PRM/KA/RERA/1250/304/PR/160126/008407

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
3
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

64
Registered units
₹20.8 Cr
Est. construction cost
Units profiled
23
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units64Total inventory registered with K-RERA.
Official carpet area4,631 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area9,521 sqmUseful scale context when comparing density and project cost.
Registered land area3,642 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.498Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed70 total (71 covered, 0 open) — 1.09 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberHSK-LBPAS-10892/25-26/BPUse this to match the sanctioned drawing set shown by the builder.
Plan approval date30-09-2025
Project start date10-10-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK5688%3,871 sqm
3 BHK812%760 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower3647014.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 64 official flat/unit rows, matching the 64 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK5664.5-75.0 sqm48.8-55.5 sqm56
3 BHK892.1-97.9 sqm70.8-74.8 sqm8

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower6464.5-97.9 sqm48.8-74.8 sqm64
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G-01Tower02 BHK75.0 sqm51.9 sqm1
G-02Tower02 BHK69.7 sqm51.5 sqm1
G-03Tower02 BHK64.5 sqm48.8 sqm1
G-04Tower02 BHK67.2 sqm50.6 sqm1
G-05Tower02 BHK67.2 sqm50.6 sqm1
G-06Tower02 BHK67.2 sqm50.6 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~779 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 64 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 70 parking spaces for 64 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~54 sqm per home; across all 64 homes that is ~96% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

4 of 21 compliance document slots are filed as Not Applicable; the remaining 17 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC and environmental clearance are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

7 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved13-02-2025WATER NOC.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved19-11-2024KSPCB NOC with fees receipt.pdf
KPTCL- BESCOMApproved27-02-2025BESCOM NOC FEE RECEIPT .pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantVenkatramana P2284082012Bengaluru Urban, Karnataka - 560016
EngineerM Laxmi Narasimha RaoM-144844-12012Hyderabad, Telangana - 500027
ArchitectSathish Babu AssociatesCA/2018/1035212018Bengaluru Urban, Karnataka - 560075
ContractorNS CONSTRUCTIONS-2015Bengaluru Rural, Karnataka - 562114

Builder track record

RERA filing

Aryavaridhi Projects has 3 other K-RERA-registered projects in our records. 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹0.59 Cr collected from buyers, ₹0.41 Cr withdrawn from the project's escrow account.

Construction progress27% → 27% (+0 pts)
Units sold/booked as registered5/64 (8%)
Buyer collections in available QPRs₹0.59 Cr
Escrow withdrawals in available QPRs₹0.41 Cr (0.70x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹32.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

Location & Connectivity

The nearest major job hub is ~10 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub10 km
Bellandur–Marathahalli belt17 km
Kempegowda Int'l Airport18 km
Outer Ring Road / Manyata18 km
MG Road / city centre21 km
Electronic City27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Aryavaridhi Projects.
Aryavaridhi Projects has 3 projects registered in Bangalore.

Other projects by this builder in Bangalore

Other RERA-registered projects in M V Extenstion

Major developers building in M V Extenstion

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Arya’s Avadana?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026