K-RERA · the public record
GREEN EARTH ATRIUM
Bengaluru East · GREEN EARTH VENTURES
Know the project.
Then choose your home.
The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.
The record · free to read
Registration read 20 Sep 2026Progress & dates
The timeline on file.
Available record
No construction trend to plot.
The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.
declared completion
31 Mar 2018
The registered date and a construction update answer different questions. Neither is a confirmation of possession.
K-RERA registration · read 20 Sep 2026
Inventory & scale
What this registration contains.
Filed categories, unchanged · K-RERA registration · read 20 Sep 2026
The whole registration
0.8registered acres
90.9registered units per acre
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.
From another project · Prestige Park Grove
A larger advertised area. Almost the same carpet area.
In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.
This illustrates the report format. These findings concern the named sample, not this project.
Read the sample report ↗
The source record
The details behind the headline.
K-RERA · PRM/KA/RERA/1251/446/PR/180131/001516
This project, on the record
The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
Official Registry Facts
Official project scale
RERA filingRegistration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 75 | Total inventory registered with K-RERA. |
| Registered land area | 3,340 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | ~0.02 | Sanctioned floor-area ratio (≈75 sqm sanctioned FAR area ÷ 3,340 sqm land) — higher means a denser vertical build. |
| Registered tower/wing entries | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking total (reconciled) | 75 | Separate filed counts; these categories may overlap and are not added together. |
| Open-parking field | 7 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 75 | Separate filed counts; these categories may overlap and are not added together. |
| Project start date | 01-09-2016 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| GREEN EARTH ATRIUM | 3 | 75 | 75 | - |
Official unit register
RERA filingK-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 4 official flat/unit rows vs 75 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 1BHK | 4 | 1.0 sqm | 1.0 sqm | 0 (4 with 0) |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| GREEN EARTH ATRIUM | 4 | 1.0 sqm | 1.0 sqm | 0 (4 with 0) |
Show sample official unit rows
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 1 | GREEN EARTH ATRIUM | 0 | 1BHK | 1.0 sqm | 1.0 sqm | 0 |
| 1 | GREEN EARTH ATRIUM | 1 | 1BHK | 1.0 sqm | 1.0 sqm | 0 |
| 1 | GREEN EARTH ATRIUM | 2 | 1BHK | 1.0 sqm | 1.0 sqm | 0 |
| 1 | GREEN EARTH ATRIUM | 3 | 1BHK | 1.0 sqm | 1.0 sqm | 0 |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingNo litigation declared on this project's K-RERA filing.
All 16 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Mar 2018 — which has passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA complaint orders (17 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Tathagata Banerjee vs GREEN EARTH VENTURES | Promoter should pay entire amount received from flats to pay to BWSSB to BWSSB. Remediate issues with STP. Honour 5 year warranty period as signed in sales agreement | AUTHORITY | 29/04/2023 |
| HARISH VERMA vs GREEN EARTH ATRIUM | Seek RERA's interference in prevailing over the builder to fulfill his obligations as signed in sale agreement. | AUTHORITY | 20/09/2023 |
| HAREESH KUMAR A V vs GREEN EARTH VENDERS | We humbly pray RERA to intervene in this matter and order the builder to fulfill the obligations he had signed for. with the priority being BWSSB clearence for the property. | AUTHORITY | 20/09/2023 |
| Ankita Sinha vs GREEN EARTH VENTURES | Provide relief Regarding Kaveri Water Connection and Pollution Certi?cates of STP fron NGT and providing of Ammenities as advertised | AUTHORITY | 20/06/2022 |
| Ganesh P S vs GREEN EARTH VENTURES | Builder have to pay BWSSB charges to Goverment and STP connection should be installed properly. | AUTHORITY | 20/06/2022 |
| Balasubramani Thangaraj vs GREEN EARTH VENTURES | Provide relief regarding Cauvery Water connection and pollution certificate of STP from NGT | AUTHORITY | 20/06/2022 |
| Karthikeyan vs GREEN EARTH VENTURES | We would request the RERA authority to take necessary actions against the Builder and the builder should pay the amount to BWSSB and STB as he promised in the sale agreement OR refund the amount to us | AUTHORITY | 20/06/2022 |
| MATHAN V & ANOTHER vs M/S GREEN EARTH VENTURE | We humbly pray RERA to intervene in this matter and order the builder to fulfil the obligations he had signed for. With the priority being BWSSB clearance for the property | AUTHORITY | 14/12/2023 |
| SIVARAMAN R & ANOTHER vs M/S GREEN EARTH VENTURE | We humbly pray RERA to intervene in this matter and order the builder to fulfil the obligations he had signed for. With the priority being BWSSB clearance for the property | AUTHORITY | 14/12/2023 |
| NITESH BHASKARAN & ANOTHER vs M/S GREEN EARTH VENTURE | We humbly request RERA to intervene in matter of fulfilment of the BWSSB connection and CFE, CFO certification for STP. Judgement for similar complaints is given on 20/06/2022 in favor of flat owners. | AUTHORITY | 14/12/2023 |
| Mrs. VARALAKSHMI & ANOTHER vs M/S GREEN EARTH VENTURE | We humbly pray RERA to intervene in this matter and order the builder to fulfil the obligations he had signed for. With the priority being BWSSB clearance for the property | AUTHORITY | 14/12/2023 |
| RAMESHKUMAR N vs GREEN EARTH VENTURES | Either the builder should give back the money or pay the amount to BWSSB | AUTHORITY | 13/10/2022 |
| Jithin Ashokan vs green earth atrium | Builder has collected 75000 INR for BWSSB and not paid to govt,STP connection not installed properly | AUTHORITY | 03/11/2023 |
| ARUN KUMAR vs green earth | nil so far | AUTHORITY | 03/11/2023 |
| Jayaprakash Hiregoudar vs green earth autrium | Provide KAVERI water connection to the flat or refund to me the amount Rs 75000 collected for providing KAVERI water connection | AUTHORITY | 03/11/2023 |
| Allen Skariah vs green earth atrium | We humbly pray RERA to intervene in this matter and order the builder to fulfil the obligations he had signed for. With the priority being BWSSB clearance for the property | AUTHORITY | 03/11/2023 |
| Karthik T M Prabhu vs green earth atrium | We humbly pray RERA to intervene in this matter and order the builder to fulfill the obligations he had signed for with the priority being BWSSB clearance for the property | AUTHORITY | 03/11/2023 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (17 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/200829/0006466 29-08-2020 | BWSSB charges not paid by builder (costing buyer 75000)and Ammenities not provided as advertised(buyer cost 1,50,000) | GREEN EARTH ATRIUM | DISPOSED AUTHORITY FULLBENCH |
| CMP/210824/0008264 24-08-2021 | Builder collected Rs 75000 for BWSSB, but didnt pay amount to BWSSB | GREEN EARTH ATRIUM | DISPOSED AUTHORITY BENCH4 |
| CMP/210824/0008267 24-08-2021 | Builder not paid 75000 to govt which collected as BWSSB Charges and STP also not installed properly | GREEN EARTH ATRIUM | DISPOSED AUTHORITY FULLBENCH |
| CMP/210825/0008268 25-08-2021 | Others | GREEN EARTH ATRIUM | DISPOSED AUTHORITY FULLBENCH |
| CMP/210825/0008269 25-08-2021 | Builder has collected 75000 INR for BWSSB and not paid to govt, STP connection not installed properly | GREEN EARTH ATRIUM | DISPOSED AUTHORITY BENCH5 |
| CMP/210827/0008277 27-08-2021 | Green Earth Ventures collected Rs.75000 for BWSSB connection but still not paid to BWSSB/Govt | GREEN EARTH ATRIUM | DISPOSED AUTHORITY FULLBENCH |
| CMP/210828/0008278 28-08-2021 | Builder collected amount for BWSSD connection and now he is not paying to BWSSB board for kaveri connection | GREEN EARTH ATRIUM | DISPOSED AUTHORITY BENCH5 |
| CMP/210828/0008279 28-08-2021 | Incomplete BWSSB payment, STP not installed properly, Promoter refusal to repair | GREEN EARTH ATRIUM | DISPOSED AUTHORITY FULLBENCH |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Project team & certifications
RERA filingK-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | Right Angles | - | 2007 | 2nd Main road, Kasturinagar |
| Contractor | ASHVAMEDHA CONSTRUCTIONS | - | 2010 | RUSTUM BAGH, OLD AIRPORT ROAD |
| Structural engineer | Y.BHASKAR | - | - | - |
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹17.3 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: ICICI Bank OLD AIRPORT ROAD (IFSC ICIC0002326, a/c …2499). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Construction photo filings
RERA filingK-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
Location & Connectivity
The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.
| Landmark | Straight-line |
|---|---|
| Whitefield IT hub | 2 km |
| Bellandur–Marathahalli belt | 10 km |
| MG Road / city centre | 17 km |
| Outer Ring Road / Manyata | 17 km |
| Electronic City | 19 km |
| Kempegowda Int'l Airport | 25 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.