100%construction reportedQ3 2025 filing
54units not bookedof 96 · Q3 2025 filing
31 Dec 2025declared completionK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q3 2025

declared completion

31 Dec 2025

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

Flats
96

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

0.9registered acres

101.1registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1250/304/PR/190123/005629

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2025
Land area3,844 sq m (0.9 acres)
Homes registered96
Tower/wing entries1
Unit mix96 × Flats

In context

Density101.1 homes per acre
Density in context80th percentile of 112 Hosakote projects (median 79.1)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units96Total inventory registered with K-RERA.
Official carpet area9,384 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area12,635 sqmUseful scale context when comparing density and project cost.
Registered land area3,844 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.44Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)3Separate filed counts; these categories may overlap and are not added together.
Covered-parking field103Separate filed counts; these categories may overlap and are not added together.
Open-parking field2Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberCC/24/2022-23Use this to match the sanctioned drawing set shown by the builder.
Plan approval date22-07-2022
Project start date15-07-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Flats96100%9,384 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Sapthagiri Sampada496315 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 96 official flat/unit rows, matching the 96 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK7236.0-37.0 sqm8.0 sqm72
3 BHK2436.0-37.0 sqm8.0-9.0 sqm24

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Sapthagiri Sampada9636.0-37.0 sqm8.0-9.0 sqm96
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
4Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1
5Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1
6Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1
7Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1
8Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1
9Sapthagiri Sampada02 BHK37.0 sqm8.0 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

18 of 43 compliance document slots are filed as Not Applicable; the remaining 25 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2025, extended (an extension) to 05 Feb 2026 — both dates have passed with no OC on file. An extension application filed on 27 May 2026 is pending with K-RERA — until it is approved, the registration stands lapsed.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC and environmental clearance are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

7 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved10-06-2022Water NOC.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved08-06-2022KSPCB CFE.pdf
KPTCL- BESCOMApproved15-06-2022BESOCM NOC.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantANIMIREDDY RAMAKRISHNA2474202018Bengaluru Urban, Karnataka - 560043
EngineerMANDHADI VENKAT RAMANA REDDYBCCL/BL-3.6/E0011/22-232022Bengaluru Rural, Karnataka - 560089
ArchitectTata Vittala SrinivasCA/97/218981997Hyderabad, Telangana - 500003
ContractorSapthagiri Sanpada-2022Bengaluru Urban, Karnataka - 560043

Builder track record

RERA filing

Sapthagiri Constructions has 2 other K-RERA-registered projects in our records. 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹0.32 Cr collected from buyers, ₹0.32 Cr withdrawn from the project's escrow account.

Construction progress100% → 100% (+0 pts)
Units sold/booked as registered42/96 (44%)
Buyer collections in available QPRs₹0.32 Cr
Escrow withdrawals in available QPRs₹0.32 Cr (1.00x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹20.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Bank of Baroda Kasturinagar IFSC Code : BARB0VJKAST Pin Code : 560043. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~27 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Outer Ring Road / Manyata27 km
MG Road / city centre30 km
Kempegowda Int'l Airport32 km
Bellandur–Marathahalli belt40 km
Whitefield IT hub43 km
Electronic City45 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sapthagiri Constructions.
Sapthagiri Constructions has 3 projects registered in Bangalore, 1 completed.
6 complaints on the K-RERA register against Sapthagiri Constructions in Bangalore.

Other projects by this builder in Bangalore

Sapthagiri Sampada B Block
No filings

Other RERA-registered projects in M V Extenstion

Major developers building in M V Extenstion

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.