RERA Property Intelligence Report · Preview

SS SNOWDROP

S.S.Builders and Developers · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/180728/001963

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
26
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

128
Registered units
₹29.3 Cr
Est. construction cost
Units profiled
42
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units128Total inventory registered with K-RERA.
Registered land area6,217 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed128 total (0 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date20-06-2018

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
SS SNOWDROP4128128-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 128 official flat/unit rows, matching the 128 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK104724.4-795.1 sqft4.0-526.9 sqft104
3BHK24956.9-1,030.2 sqft4.0 sqft24

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
SS SNOWDROP128724.4-1,030.2 sqft4.0-526.9 sqft128
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A101SS SNOWDROP13BHK998.5 sqft4.0 sqft1
A102SS SNOWDROP12BHK754.1 sqft4.0 sqft1
A103SS SNOWDROP12BHK754.1 sqft4.0 sqft1
A104SS SNOWDROP12BHK754.1 sqft4.0 sqft1
A105SS SNOWDROP12BHK754.1 sqft4.0 sqft1
A106SS SNOWDROP12BHK773.9 sqft4.0 sqft1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~814 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 128 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 128 parking spaces for 128 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~34 sqft per home; across all 128 homes that is ~6% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 21 of 35 compliance document slots are filed as under process / not yet usable: Commencement Certificate, Proforma For Sale Deed, Performa of Allotment Letter, Approval/NOC under Sec 14 of the KTCP Act, Utilisation certificate and more.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 19 Jun 2020, extended (Covid Extension) to 19 Mar 2021 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (58 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
MUTHUVEL vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarlier completion of project with quality and completion and hand overAUTHORITY23/12/2024
Santosh Kumar vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality work and require compensation for all the harrasment given by builder in this 2 yearAUTHORITY23/12/2024
KOLLI KALYANA CHAKRAVARTHY vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality work and compensation for the delayed periodAUTHORITY23/12/2024
Subba Rao Repalle vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of the project quality, issuance of OC, A-Katha Certificate(Katha Transfer), EB Name transfer and compensation till the handover of societyAUTHORITY23/12/2024
KRISHNA KUMAR PRASAD vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of societyAUTHORITY23/12/2024
Suma Reddy Battu vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSNeed immediate project completion as promised and we are not having mental pieceAUTHORITY23/12/2024
Tandra Vinay Kumar vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill name transfer and compensation till the handover of society.AUTHORITY23/12/2024
Mohammad Fathima Begum vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality work, issuance of OC, A-Khatha transfer, EB bill name transferAUTHORITY23/12/2024
Aisha Firdose vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of project with quality work, issue of A-katha, EB bill name transfer, Occupation CertificateAUTHORITY23/12/2024
Ashwin V vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality and compensation till handover.AUTHORITY23/12/2024
Purushotham Sathwik Vavilala vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of project with quality, issuance of OC, A Katha Certificate (Katha Transfer), EB Bill name transfer and compensation till handover of project.AUTHORITY23/12/2024
ANIMESH KUMAR SINGH vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality work and compensation for the delayed periodAUTHORITY23/12/2024
Syed Hadi Mehmood vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSEarly completion of the project with quality and compensation till handover.AUTHORITY23/12/2024
Goripati Hari Srinivas vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of the project with quality and compliance to RERA rules. Issuance of OC, A-khata certificate (Khata transfer), EB bill name transfer and compensation till the handover of societyAUTHORITY23/12/2024
Vyshnavi Vankadari vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of society.AUTHORITY23/12/2024
Raghavendra Keshmoni vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSImmediate completion of project with quality, issuance of OC, A-Khata Certificate(Khata transfer), EB bill name transfer & compensation till the handover of societyAUTHORITY23/12/2024
Undavalli Naga Durga Sandeep vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERSNeed immediate project completion as promisedAUTHORITY23/12/2024
PRABHASH TIWARI vs SS SNOWDROPSCompletion of project at the earliest with quality and compensation till handoverAUTHORITY23/07/2024
MANIVANNAN vs S S SNOWDROPSImmediate completion of project with quality , issuance of OC, A- Khata transfer certificate, BESCOM connection with name transfer completed and compensation till handover of soceity.AUTHORITY23/07/2024
KOLLI KALYANA CHAKRAVARTY vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed project from the date of sale deed.AUTHORITY23/07/2024
MOHAMMAD FATHIMA BEGUM vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed projected from the date of Sale DeedAUTHORITY23/07/2024
AISHA FIRDOSE vs SS SNOWDROPSCompensation and legal expenses for the stalled/delayed projected from the date of Sale DeedAUTHORITY23/07/2024
SYED HADI MEHMOOD vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed projected from the date of Sale DeedAUTHORITY23/07/2024
VYSHNAVI VANKADARI vs SS SNOWDROPSRs.50000 for breach of terms of compromise petition dated 12/11/2022 , Compensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of saleAUTHORITY23/07/2024
TANDRA VINAY KUMAR vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed projected from the date of Sale DeedAUTHORITY23/07/2024
SUBBA RAO REPALLE vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed projected from the date of Sale DeedAUTHORITY23/07/2024
MUTHUVEL vs SS SNOWDROPCompensation and legal expenses for the stalled/delayed projected from the date of sale DeedAUTHORITY23/07/2024
ANIMESH KUMAR SINGH vs SS SNOWDROPCompensation at 18% on total saleconsideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of sale.AUTHORITY23/07/2024
KRISHNA KUMAR PRASAD vs S S SNOWDROPCompensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of saleAUTHORITY23/07/2024
PURUSHOTHAM SATHWIK VAVILAL vs SS SNOWDROPCompensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of saleAUTHORITY23/07/2024
HARI DURGAPRASAD vs M/S.S.S.BUILDERS AND DEVELOPERSCompletion of project to the earliest with quality and compensation till date of completion for the loss due to in complete amenities.AUTHORITY12/11/2022
SHAKTI PRASANNA PATTNAYAK vs M/S.S.S.BUILDERS AND DEVELOPERSEarly completion of the project with quality and compensation till handover.AUTHORITY12/11/2022
SHARANA KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERSCompensationAUTHORITY12/11/2022
SAMARTH SAXENA vs M/S.S.S.BUILDERS AND DEVELOPERSCompletion of all amenities as promised by builder at the earliest.AUTHORITY12/11/2022
SANDEEP REEDY MUKKAMALLA vs M/S.S.S.BUILDERS AND DEVELOPERSI want complete all pending work in ss snowdrop apartment .AUTHORITY12/11/2022
LOKESH AYYALA vs M/S.S.S.BUILDERS AND DEVELOPERSCompletion of amenities, Rework of where poorly finished work for building and compensation for delay if possibleAUTHORITY12/11/2022
SATYAPRIYA TARANIA vs M/S.S.S.BUILDERS AND DEVELOPERSEarly completion of the project with Quality and compensation till the handover.AUTHORITY12/11/2022
MATHIVANAN ELANGOVAN vs M/S.S.S.BUILDERS AND DEVELOPERSComplete the Project without further delay and need status of the Completion and Quality of work also compensation till the handover and for the delayed time period.AUTHORITY12/11/2022
SUJIT RAI vs M/S.S.S.BUILDERS AND DEVELOPERSYes,Amenities and permanent power supply require.AUTHORITY12/11/2022
BIKASH KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERSComplete the Project and Arrange compensation for our lossesAUTHORITY12/11/2022
P VIJAYALAXMI vs M/S.S.S.BUILDERS AND DEVELOPERSEarly completion of the project with quality and compensation till the handover dateAUTHORITY12/11/2022
GURUPRASAD UDDANDAM vs M/S.S.S.BUILDERS AND DEVELOPERSPlease do the needful as we are not able to catch the builder and they are not under standing our suffering and Enjoying with our hard earned money. Requesting RERA please do proper action on builder.AUTHORITY12/11/2022
SUBHASMIT PRUSTY vs M/S.S.S.BUILDERS AND DEVELOPERSExpedite the development of the Apartment with all its amenities. Do not give any more relaxation to builder as already 9 months relaxation has been provided.AUTHORITY12/11/2022
SUJEET KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERSRERA should ask Builder to complete the project as soon as possible else builder should compensate for lack of amenities which was promised at the time of buying.AUTHORITY12/11/2022
SHYAM SEKHAR vs M/S.S.S.BUILDERS AND DEVELOPERSI am expecting to finish the project with all eminitiesAUTHORITY12/11/2022
MADUPURI THIRUMALA RAGHAVENDRA PRASAD vs M/S.S.S.BUILDERS AND DEVELOPERSRequest to take actions for quick finish the projectAUTHORITY12/11/2022
VISHAL ANAND vs M/S.S.S.BUILDERS AND DEVELOPERSWe need proper completion date with Quality material and compensation for delay.AUTHORITY12/11/2022
SOWMITRI vs M/S.S.S.BUILDERS AND DEVELOPERSAll Pending work as promised has to be completed with in 2months from nowAUTHORITY12/11/2022
KOLA AVINASH vs M/S.S.S.BUILDERS AND DEVELOPERSrequest to take actions for quick finish the projectAUTHORITY12/11/2022
BRIJESH KUMAR BEHERA vs M/S.S.S.BUILDERS AND DEVELOPERSEARLY COMPLETION WITH GOOD QUALITY WORKAUTHORITY12/11/2022
NESAMANI vs M/S.S.S.BUILDERS AND DEVELOPERSWe want all the Builder promised things needs to be ready at the earliest.AUTHORITY12/11/2022
Y KRISHNA KISHORE vs M/S.S.S.BUILDERS AND DEVELOPERSsir, I request you to take action on builder ,to make sure he builds all the facilities, which he promised in a shorter time, Thanks sir.AUTHORITY12/11/2022
POOLLA SESHA VENKATA RAMESH vs M/S.S.S.BUILDERS AND DEVELOPERSProject completion with all amenities as per contractual obligation and compensation sought for poor quality of workAUTHORITY12/11/2022
JITENDRA KUMAR SAMANTARAY vs M/S.S.S.BUILDERS AND DEVELOPERSEarly completion of the project with quality and compensation till handover.AUTHORITY12/11/2022
SHAMBHU NATH YADAV vs M/S.S.S.BUILDERS AND DEVELOPERSCompletion of the Complaints to the earliest and due compensation for the delay caused.AUTHORITY12/11/2022
M S V A PRADEEP vs M/S.S.S.BUILDERS AND DEVELOPERSImmediate Completion of the project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill Name Transfer and Compensation till the handover of societyAUTHORITY12/11/2022
ARAVIND VENKATAKRISHNAN vs M/S.S.S.BUILDERS AND DEVELOPERSKindly penalize builders and get the project completed as soon as possibleAUTHORITY12/11/2022
MALAY KUMAR K vs M/S.S.S.BUILDERS AND DEVELOPERSBasic amenities are requiredAUTHORITY12/11/2022

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (45 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/221119/0010364
19-11-2022
Pending all AmenitiesSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010251
12-11-2022
Project Incomplete and mental/physical harrasementSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010249
12-11-2022
Pending All AmenitiesSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010248
12-11-2022
Pending all AmenitiesSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221114/0010270
14-11-2022
Project incomplete no response from builder on pending works and quality issuesSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010250
12-11-2022
Pending All AmenitiesSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010252
12-11-2022
Project incomplete and mental/physical harassmentSS SNOWDROPDISPOSED AUTHORITY BENCH4
CMP/221112/0010253
12-11-2022
Project incomplete and mental/physical harassmentSS SNOWDROPDISPOSED AUTHORITY BENCH4

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Builder track record

RERA filing

Builders And has 26 other K-RERA-registered projects in our records (average reported construction progress 82%). 9 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹22.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank Seegehalli. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~4 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Whitefield IT hub4 km
Bellandur–Marathahalli belt10 km
Outer Ring Road / Manyata14 km
MG Road / city centre16 km
Electronic City20 km
Kempegowda Int'l Airport22 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Builders And.
Builders And has 27 projects registered in Bangalore, 1 completed.

Other projects by this builder in Bangalore

Bhoomika Mayflower
Filing overdue · 65% built · 61% sold
RV Fallon
Filing overdue · 100% built · 0% sold

Other RERA-registered projects in Krishnarajapuram

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.