RERA Property Intelligence Report · Preview

SUMUK SQUARE

SUMUK PROJECTS · Yelahanka · K-RERA PRM/KA/RERA/1251/472/PR/070323/005769

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

75
Registered units
₹20.0 Cr
Est. construction cost
Units profiled
50
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units75Total inventory registered with K-RERA.
Official carpet area6,796 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area10,070 sqmUseful scale context when comparing density and project cost.
Registered land area3,140 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.34Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed83 total (83 covered, 0 open) — 1.11 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberBBMP/ADDL.DIR/JDNORTH/0088/21-22Use this to match the sanctioned drawing set shown by the builder.
Plan approval date01-12-2022
Project start date30-01-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK4560%3,479 sqm
2 BHK3040%2,498 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
A5758314.5 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 75 official flat/unit rows, matching the 75 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK4568.1-95.4 sqm40.6-50.6 sqm45
2 BHK3059.7-73.2 sqm34.6-39.8 sqm30

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
A7559.7-95.4 sqm34.6-50.6 sqm75
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
GF-001A13 BHK68.1 sqm41.6 sqm1
GF-002A12 BHK59.8 sqm35.8 sqm1
GF-003A13 BHK69.5 sqm48.3 sqm1
GF-004A13 BHK76.6 sqm45.0 sqm1
GF-005A13 BHK73.9 sqm45.0 sqm1
GF-006A13 BHK76.8 sqm48.2 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~815 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 75 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 83 parking spaces for 75 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~42 sqm per home; across all 75 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 43 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC and environmental clearance are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

7 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved05-11-2022BWSSB NOC.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved14-02-2022KSPCB NOC.pdf
KPTCL- BESCOMApproved20-02-2022BESCOM NOC.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantKVN PHANENDRA REDDY2479602019Bengaluru Urban, Karnataka - 515465
EngineerRAMESH SBCC/BL-3.6/E/4350/2018-192010Bengaluru Urban, Karnataka - 560021
ArchitectMAYUR KULKARNIBCCL/BL-3.6/A-0160/22-232015Bengaluru Urban, Karnataka - 560061
ContractorCHITTIBABU-2019Bengaluru Urban, Karnataka - 560070

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹4.95 Cr collected from buyers, ₹49.48 Cr withdrawn from the project's escrow account. This quarter the escrow withdrawal (₹49.48 Cr) exceeded buyer collections (₹4.95 Cr) — worth asking the builder to reconcile against certified construction milestones, which is what RERA requires escrow draws to track.

Construction progress97% → 97% (+0 pts)
Units sold/booked as registered50/75 (67%)
Buyer collections in available QPRs₹4.95 Cr
Escrow withdrawals in available QPRs₹49.48 Cr (10.00x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹26.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC RR NAGR IFSC Code : HDFC0001039 Pin Code : 560078. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~12 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Outer Ring Road / Manyata12 km
MG Road / city centre17 km
Kempegowda Int'l Airport21 km
Bellandur–Marathahalli belt25 km
Whitefield IT hub28 km
Electronic City32 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sumuk Projects.
Sumuk Projects has 2 projects registered in Bangalore, 1 completed.

Other projects by this builder in Bangalore

Sumuk Square-2
Filing overdue · 44% built · 32% sold

Other RERA-registered projects in Vidyaranyapura

Major developers building in Vidyaranyapura

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Sumuk Square?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026