MahaRERA Property Intelligence · Palghar

SAI YASHODHAN BLDG NO. 2

P99000005416 · parasnath nagari · promoter Deepak Sadanand Hanchate

Certificate SignedDue 30 Dec 2027

Delivery & Registration

MahaRERA registrationP99000005416
Registered on11 Aug 2017
Promoter-declared completion30 Dec 2027
Current statusCertificate Signed
Against today17 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Deepak Sadanand Hanchate is the promoter of record on 22 projects, of which 3 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Construction Progress

MahaRERA's cost filing puts construction at ~99.5% of the estimated project cost incurred as of the last certificate (₹5.85 Cr spent against a ₹5.88 Cr estimate). This financial % is the regulator's own proxy for how much is physically built — the closest public read on real progress, and one a brochure never shows.

Cost-incurred % as last certified to MahaRERA; it can lag on-site reality between filings. Confirm the current stage and the latest Form 2 before you book.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+4.

BuildingWingsFloorsDeclared completion
WING A1G+4-
WING B1G+4-

Complaints & Orders

1 complaint is on the MahaRERA record for this project, with orders passed in 1. An adjudicated complaint is the clearest evidence of how this promoter behaves when pushed — read the orders in full.

Complaint no.FiledPartiesStatus
CC00600000034421404/02/2023ANAGHA T JOSHI vs Deepak Hanchateorder passed

Deadline Extensions

The promoter has had the MahaRERA completion deadline formally extended 4 times. Each extension is the regulator letting the finish line move — the clearest evidence of delivery slippage, straight from the record.

From (declared)To (revised)Stated reason
29 Dec 202529 Dec 2025As there was delay in receiving N.A order of proposed pending upper floors from the component Authority
29 Dec 202531 Dec 2022non availability of material and delayed in getting permission for upper floors from collector
29 Dec 202531 Dec 2022due non availability of building material sand
31 Dec 201830 Dec 2027we have completed the project have applied for OC hence required extension

Location, Land & Connectivity

Located at parasnath nagari, survey No. 145, Vasai, Palghar, 401404. Per the filed land record, the plot is bounded to the north by 19 44576 N 72 45590 E, to the south by 19 44570 N 72 45592 E, to the east by 19 44574 N 72 46000 E and to the west by 19 44569 N 72 45585 E. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~71 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Andheri MIDC / SEEPZ71 km
Powai / Hiranandani business park73 km
Chhatrapati Shivaji Int'l Airport75 km
Bandra Kurla Complex (BKC)78 km
Lower Parel / Worli business district85 km
Nariman Point / Fort93 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

Deepak Sadanand Hanchate is the promoter on 2 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

Other flagged projects by Deepak Sadanand Hanchate

Deepak Sadanand Hanchate
FlaggedPalghar

Other RERA-registered projects in Palghar

Shree SAI Apartment
possession by Jul 2026 · Shree SAI Jivdani Developers
Madhav Vatika - VI
possession by Jul 2026 · R M N H Developers LLP
Prithvi Anand Kuber Complex
possession by Jul 2026 · Prithvi Anand Housing And Land Developer
Vardhaman Divine
possession by Jul 2026 · Vardhaman AND Shah Associates
Symphony Heights
possession by Aug 2026 · Kreate Space LLP
Shree Puram - 2, Building No. 1
possession by Aug 2026 · Vastu Realities

Major developers building in Palghar

Other RERA-registered projects in Palghar

Sainagar
declared completion Dec 2021 · Bharat Realty
Sainagar Sainath Building NO. 1 CO-Operative Housing Society Limited
declared completion Dec 2023 · Devendra Gupta
Sakina Residency
possession by Jun 2027 · Vision Developers
Sakshi Apartment
possession by Dec 2026 · Sushil Lalta Yadav
Samaira Opulence
possession by Dec 2027 · Samaira Buildcon
Samaira Residency
possession by Dec 2026 · AV Crystal Space

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026