MahaRERA Property Intelligence · Raigarh

Wise City RZ8 Wing E2

P52000051752 · Wadhwa Wise City · promoter Wadhwa Construction And

Certificate SignedDue 31 Dec 2029

Delivery & Registration

MahaRERA registrationP52000051752
Registered on27 Jun 2023
Promoter-declared completion31 Dec 2029
Current statusCertificate Signed
Against today41 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Wadhwa Construction And is the promoter of record on 60 projects, of which 10 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Construction Progress

MahaRERA's cost filing puts construction at ~36.1% of the estimated project cost incurred as of the last certificate (₹11.53 Cr spent against a ₹31.96 Cr estimate). This financial % is the regulator's own proxy for how much is physically built — the closest public read on real progress, and one a brochure never shows.

Cost-incurred % as last certified to MahaRERA; it can lag on-site reality between filings. Confirm the current stage and the latest Form 2 before you book.

Sales & Inventory

Of 81 homes filed with MahaRERA, 59 are sold/booked and 22 remain available (~73% sold) — selling steadily. Buyers have committed ₹60.74 Cr in agreement value so far. Of that, ₹22.42 Cr (~37%) is already collected, ₹38.32 Cr receivable — a read on how far along these sales really are. Note: the project registers 111 homes in total, but this sold/unsold inventory filing covers only 81 of them — the other 30 aren't in the ledger yet. Ask the builder what they are (an unreleased phase, held-back stock, or non-saleable/car-park units) before reading too much into the percentage. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

What buyers actually paid: across 59 registered agreements, the effective carpet rate is ₹12,015/sqft (typical range ₹11,295–₹13,721) — computed from the agreement values and carpet areas the promoter filed, not broker quotes. Compare your quote against this before negotiating.

The unsold units on the filing — if you're quoted a unit NOT on this list, ask why it shows as sold/booked on the RERA record:

FloorUnitCarpetReckoner value
Floor 1E2-101782 sqft (72.67 sqm)₹29.63 Lakh
Floor 1E2-104873 sqft (81.07 sqm)₹33.06 Lakh
Floor 10E2-1001782 sqft (72.67 sqm)₹29.63 Lakh
Floor 16E2-1602782 sqft (72.67 sqm)₹29.63 Lakh
Floor 17E2-1701782 sqft (72.67 sqm)₹29.63 Lakh
Floor 17E2-1702782 sqft (72.67 sqm)₹29.63 Lakh
Floor 18E2-1802782 sqft (72.67 sqm)₹29.63 Lakh
Floor 19E2-1902782 sqft (72.67 sqm)₹29.63 Lakh
Floor 21E2-2102782 sqft (72.67 sqm)₹29.63 Lakh
Floor 21E2-2103873 sqft (81.07 sqm)₹33.06 Lakh
Floor 23E2-2303873 sqft (81.07 sqm)₹33.06 Lakh
Floor 26E2-2601782 sqft (72.67 sqm)₹29.63 Lakh
Floor 26E2-2603873 sqft (81.07 sqm)₹33.06 Lakh
Floor 27E2-2702782 sqft (72.67 sqm)₹29.63 Lakh
Floor 28E2-2802782 sqft (72.67 sqm)₹29.63 Lakh
Floor 29E2-2901782 sqft (72.67 sqm)₹29.63 Lakh
Floor 29E2-2902782 sqft (72.67 sqm)₹29.63 Lakh
Floor 6E2-601782 sqft (72.67 sqm)₹29.63 Lakh
Floor 6E2-602782 sqft (72.67 sqm)₹29.63 Lakh
Floor 9E2-901782 sqft (72.67 sqm)₹29.63 Lakh
Floor 9E2-902782 sqft (72.67 sqm)₹29.63 Lakh
Floor 9E2-903873 sqft (81.07 sqm)₹33.06 Lakh

⚠ The inventory filing also declares: 30 not for sale. Before booking, confirm YOUR unit appears in none of these lists and get any lender NOC in writing.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+30 and 111 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
Wise City RZ8 Wing E21G+30111-

Unit mix on the filing: 111 residential.

Complaints & Orders

1 complaint is on the MahaRERA record for this project, with orders passed in 1. An adjudicated complaint is the clearest evidence of how this promoter behaves when pushed — read the orders in full.

Complaint no.FiledPartiesStatus
SM1260005812/01/2026Bhakti Achrekar vs Wadhwa Construction and infrastructure Private Limitedorder passed

Location, Land & Connectivity

Located at Wadhwa Wise City, 36 Mtr DP Road, Kurla, Mumbai Suburban, 410206. Per the filed land record, the plot is bounded to the north by 12m Wide Road, to the south by E1 Tower, to the east by D2 Tower and to the west by 12m Wide Road. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~35 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Powai / Hiranandani business park35 km
Bandra Kurla Complex (BKC)36 km
Chhatrapati Shivaji Int'l Airport37 km
Lower Parel / Worli business district39 km
Andheri MIDC / SEEPZ39 km
Nariman Point / Fort39 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

Wadhwa Construction And Infrastructure Private Limited is the promoter on 8 MahaRERA-registered projects, of which 1 carry a regulator flag (insolvency, deregistration, suspension, completion lapse or QPR default). A pattern across a builder's portfolio matters more than any one project's brochure — look into these before you trust this registration:

See every Wadhwa Construction And Infrastructure Privat project & its RERA track record →

Other flagged projects by Wadhwa Construction And Infrastructure Privat

Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
Deregistered by MahaRERARaigarh

Other RERA-registered projects in Panvel

Ambaji Residency
possession by Jul 2026 · Vishal Tukaram Patil
Bayview
possession by Jul 2026 · Skyline Realbuild LLP
Delta Heights
possession by Jul 2026 · Shreenathji Organisers Pvt. Ltd.
Micron Residency
possession by Jul 2026 · Micron Infra
Shree Mahadev Residency
possession by Jul 2026 · SK Developers
Aishwarya Cooperative Housing Society
possession by Aug 2026 · Royal Enterprises

Major developers building in Panvel

Other RERA-registered projects in Raigarh

Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1
possession by Dec 2026 · Wadhwa Construction And Infrastructure P
Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2
possession by Dec 2026 · Wadhwa Construction And Infrastructure P
Wise City, South Block, Phase I, Plot RZ8 Building 1 Wing A3
possession by Dec 2026 · Wadhwa Construction And Infrastructure P
Wise City, South Block Phase I, Plot RZ8 Building 2 Wing B3
possession by Dec 2026 · Wadhwa Construction And Infrastructure P
Wise City, South Block Phase I, Plot Rz8 Building 3 Wing C1
possession by Dec 2026 · Wadhwa Construction And Infrastructure P
Wise City, South Block Phase I, Plot Rz8, Building 3 Wing C2
possession by Dec 2026 · Wadhwa Construction And Infrastructure P

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026