RERA Property Intelligence Report · Preview

ADNA LIFE SQUARE

ADNA PROJECTS · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/081025/008144

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

100
Registered units
₹58.4 Cr
Est. construction cost
Units profiled
23
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units100Total inventory registered with K-RERA.
Official carpet area8,670 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area16,086 sqmUseful scale context when comparing density and project cost.
Registered land area14,063 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI0.91Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed110 total (110 covered, 0 open) — 1.10 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberCC-843/2024-25Use this to match the sanctioned drawing set shown by the builder.
Plan approval date12-03-2025
Project start date01-08-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK44%233 sqm
3 BHK9292%8,142 sqm
2.5 BHK44%294 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
TOWER 1310011014.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 100 official flat/unit rows, matching the 100 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK9274.3-99.2 sqm120.3-158.9 sqm92
2 BHK458.3 sqm94.2-98.3 sqm4
2.5 BHK473.6 sqm120.7 sqm4

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
TOWER 110058.3-99.2 sqm94.2-158.9 sqm100
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
001TOWER 103 BHK89.2 sqm145.4 sqm1
002TOWER 103 BHK96.0 sqm152.1 sqm1
003TOWER 103 BHK99.2 sqm156.6 sqm1
004TOWER 103 BHK74.3 sqm120.3 sqm1
005TOWER 103 BHK99.2 sqm156.6 sqm1
006TOWER 103 BHK82.8 sqm129.7 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~933 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 100 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 110 parking spaces for 100 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~141 sqm per home; across all 100 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

3 of 21 compliance document slots are filed as Not Applicable; the remaining 18 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC and environmental clearance are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

7 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved18-07-2023Panchayath Noc 18-7-23.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved05-02-2025KSPCB 05022025.pdf
KPTCL- BESCOMApproved15-03-2025BESCOM 15-3-25.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantRaveendra Reddy V2045512001Bengaluru Urban, Karnataka - 560102
EngineerPrakruthi NAM31000922023Mysore, Karnataka - 560094
ArchitectMohamed Sididque NawazCA/2020/1212982020Ramanagara, Karnataka - 562160
ContractorADNA PROJECTS LLP-2024Bengaluru Urban, Karnataka - 560102

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹1.44 Cr collected from buyers, ₹0.70 Cr withdrawn from the project's escrow account.

Construction progress4% → 9% (+5 pts)
Units sold/booked as registered1/4 (25%)
Buyer collections in available QPRs₹1.82 Cr
Escrow withdrawals in available QPRs₹0.70 Cr (0.38x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹58.4 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: STATE BANK OF INDIA SME Kumarapark Branch IFSC Code : SBIN0008577 Pin Code : 560020. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~8 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City8 km
Bellandur–Marathahalli belt17 km
Whitefield IT hub21 km
MG Road / city centre24 km
Outer Ring Road / Manyata30 km
Kempegowda Int'l Airport46 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Adna Projects.

Other RERA-registered projects in Chandapura

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.