4%construction reportedQ1 2026 filing
99units not bookedof 304 · Q1 2026 filing
30 Jun 2030declared completionK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q1 2026

declared completion

30 Jun 2030

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

3 BHK
71
3 BHK + Study Type B
38
3 BHK + Study Luxe
70
4 BHK Duplex Type A
1
2 BHK + Study Type B
1
2 BHK
1
4 BHK Duplex Type D
1
4 BHK Duplex Type B
1
2 BHK + Study Type A
2
4 BHK + Study
76
3 BHK + Study Type A
35
3 BHK Small
2
4 BHK Duplex Type A
1
4 BHK Duplex Type A
1
4 BHK Duplex Type B
1
4 BHK Duplex Type A
1
4 BHK Duplex Type D
1

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

5.4registered acres

56.2registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/308/PR/280525/007785

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion30 June 2030
Land area21,903 sq m (5.4 acres)
Homes registered304
Tower/wing entries4
Unit mix71 × 3 BHK, 38 × 3 BHK + Study Type B, 70 × 3 BHK + Study Luxe, 4 × 4 BHK Duplex Type A, 1 × 2 BHK + Study Type B, 1 × 2 BHK, 2 × 4 BHK Duplex Type D, 2 × 4 BHK

In context

Density56.2 homes per acre
Density in context27th percentile of 471 Anekal projects (median 75.8)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units304Total inventory registered with K-RERA.
Official carpet area41,374 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area94,943 sqmUseful scale context when comparing density and project cost.
Registered land area21,903 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries4Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)304Separate filed counts; these categories may overlap and are not added together.
Covered-parking field505Separate filed counts; these categories may overlap and are not added together.
Open-parking field55Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberBDA/PS/EM/EO-1/TA-2/E/10/2025-26Use this to match the sanctioned drawing set shown by the builder.
Plan approval date23-05-2025
Project start date14-06-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK7123%90 sqm
3 BHK + Study Type B3812%111 sqm
3 BHK + Study Luxe7023%124 sqm
4 BHK Duplex Type A10%251 sqm
2 BHK + Study Type B10%79 sqm
2 BHK10%68 sqm
4 BHK Duplex Type D10%182 sqm
4 BHK Duplex Type B10%226 sqm
2 BHK + Study Type A21%87 sqm
4 BHK + Study7625%182 sqm
3 BHK + Study Type A3512%111 sqm
3 BHK Small21%90 sqm
4 BHK Duplex Type A10%251 sqm
4 BHK Duplex Type A10%251 sqm
4 BHK Duplex Type B10%226 sqm
4 BHK Duplex Type A10%251 sqm
4 BHK Duplex Type D10%182 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower A19767662 m
Tower B19767662 m
Tower C19767662 m
Tower F19767662 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 304 official flat/unit rows, matching the 304 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
4 BHK + STUDY76182.0 sqm89.0 sqm76
3 BHK7390.0 sqm42.0-43.0 sqm73
3 BHK + STUDY LUXE70124.0 sqm64.0 sqm70
3BHK+ STUDY TYPE A38111.0 sqm54.0 sqm38
3BHK+ STUDY TYPE B35111.0 sqm54.0 sqm35
4BHK DUPLEX TYPE A4251.0 sqm142.0-144.0 sqm4
2BHK+ STUDY287.0 sqm45.0 sqm2
4BHK DUPLEX TYPE B2226.0 sqm122.0-125.0 sqm2
4BHK DUPLEX TYPE D2182.0 sqm91.0-92.0 sqm2
2 BHK168.0 sqm32.0 sqm1
2BHK+ STUDY TYPE B179.0 sqm39.0 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower A7687.0-251.0 sqm45.0-143.0 sqm76
Tower B7687.0-251.0 sqm45.0-144.0 sqm76
Tower C7679.0-226.0 sqm39.0-125.0 sqm76
Tower F7668.0-182.0 sqm32.0-92.0 sqm76
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
0001Tower A04BHK DUPLEX TYPE A251.0 sqm143.0 sqm1
0002Tower A04BHK DUPLEX TYPE A251.0 sqm142.0 sqm1
0103Tower A14 BHK + STUDY182.0 sqm89.0 sqm1
0104Tower A14 BHK + STUDY182.0 sqm89.0 sqm1
0201Tower A23 BHK + STUDY LUXE124.0 sqm64.0 sqm1
0202Tower A23 BHK + STUDY LUXE124.0 sqm64.0 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

6 of 34 compliance document slots are filed as Not Applicable; the remaining 28 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

3 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved21-03-2025Annexure 96 Water NOC Village Panchayath.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved20-02-2025Annexure 97 KSPCB NOCF.pdf
KSPCB- MOEF (Above 50 Acres)Approved21-04-2025Annexure 98 SEIAA NOCECF1.pdf
KPTCL- BESCOMApproved07-03-2025Annexure 95 BESCOM NOC with Fee Receipt.pdf
Fire and SafetyApproved23-04-2025Annexure 99 Fire NOC dt 2342025.pdf
Airport Authority of IndiaApproved26-04-2024Annexure 100 Airport Athority of India NOC.pdf
BSNL/Telecommunication DepartmentApproved04-01-2025Annexure 101 BSNL NOC.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantChirag Sarvaiya & Co1530812020Mumbai City, Maharashtra - 400067
EngineerB E PruthvirajaBCCL/BL-3.6/SE-0061/21-222008Bengaluru Urban, Karnataka - 560083
ArchitectKiran KempaiahCA/2006/380302023Bengaluru Urban, Karnataka - 560038
ContractorNA-0000Bengaluru Urban, Karnataka - 560001

Builder track record

RERA filing

Lodha has 6 other K-RERA-registered projects in our records (average reported construction progress 10%). 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹388.20 Cr collected from buyers, ₹188.87 Cr withdrawn from the project's escrow account.

Construction progress3% → 4% (+1 pts)
Units sold/booked as registered205/304 (67%)
Buyer collections in available QPRs₹610.12 Cr
Escrow withdrawals in available QPRs₹366.96 Cr (0.60x collections)
  • Construction progress moved from 3% to 4% across the filed QPR window.
  • The builder has drawn 0.60x of buyer collections from escrow (about 60% of the ₹610 Cr collected) — money is largely staying in the regulated escrow account rather than being pulled out ahead of spend, which is the safer direction. A ratio near or above 1.0 would be the one to scrutinise.

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹115.2 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: ICICI Bank. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Bellandur–Marathahalli belt5 km
Electronic City5 km
MG Road / city centre12 km
Whitefield IT hub12 km
Outer Ring Road / Manyata18 km
Kempegowda Int'l Airport34 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Lodha Developers. View Lodha Developers's full track record →
Lodha Developers has 6 projects registered in Bangalore.

Other projects by this builder in Bangalore

Azur
On track · 20% built · 97% sold
Azur Phase 2
On track · 7% built · 81% sold
Azur Tower D
On track · 18% built · 89% sold
Fiorana@beaumont Estate
No filings
Haven Phase 2
On track · 4% built · 9% sold

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Haven?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 20 Sep 2026