RERA Property Intelligence Report · Preview

JYOTI ABHISHEK RESIDENCY PHASE 3

BHASKAR RAMGONDA PATIL · · K-RERA PRM/KA/RERA/1249/447/PR/081223/006459

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

52
Registered units
₹3.3 Cr
Est. construction cost
Units profiled
36
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units52Total inventory registered with K-RERA.
Official carpet area2,438 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area2,656 sqmUseful scale context when comparing density and project cost.
Registered land area4,554 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.1Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings2Official tower/wing count in the K-RERA detail page.
Parking disclosed26 total (26 covered, 26 open) — 0.50 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberNPN-LBPAS-11578/22-23/ALTUse this to match the sanctioned drawing set shown by the builder.
Plan approval date25-12-2022
Project start date01-04-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
1-BHK3669%1,523 sqm
2- BHK1631%862 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Building 24261314.8 m
Building 34261314.8 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 52 official flat/unit rows, matching the 52 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
1 BHK3639.0-54.1 sqm0.0 sqm0 (36 with 0)
2 BHK1651.9-55.4 sqm0.0 sqm0 (16 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Building 22639.0-55.4 sqm0.0 sqm0 (26 with 0)
Building 32640.1-55.4 sqm0.0 sqm0 (26 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1Building 201 BHK43.3 sqm0.0 sqm0
2Building 201 BHK43.3 sqm0.0 sqm0
101Building 212 BHK51.9 sqm0.0 sqm0
102Building 211 BHK40.1 sqm0.0 sqm0
103Building 211 BHK40.1 sqm0.0 sqm0
104Building 211 BHK40.1 sqm0.0 sqm0

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~505 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a boutique, low-density project — 52 homes across 2 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 26 parking spaces for 52 homes (~0.5 per home) — below one space per home — confirm your allotment and visitor parking before booking.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

16 of 29 compliance document slots are filed as Not Applicable; the remaining 13 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

10 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantKRISHNANAND KAMAT2218712009Belagavi, Karnataka - 590006
EngineerSUNIL ANNASAHEB DESAISTATE/R/2022/APL/005852001Kolhapur, Maharashtra - 416008
ArchitectSAHAS PATILBQZPP3242F2010Kolhapur, Maharashtra - 416013
ContractorBHASKAR PATIL-2000Belagavi, Karnataka - 591237

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹0.56 Cr collected from buyers, ₹0.51 Cr withdrawn from the project's escrow account.

Construction progress100% → 100% (+0 pts)
Units sold/booked as registered23/52 (44%)
Buyer collections in available QPRs₹1.53 Cr
Escrow withdrawals in available QPRs₹1.64 Cr (1.07x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹6.3 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Industrial Development Bank of India. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~10 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
MG Road / city centre7 km
Bellandur–Marathahalli belt10 km
Electronic City10 km
Outer Ring Road / Manyata15 km
Whitefield IT hub18 km
Kempegowda Int'l Airport34 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Bhaskar Ramgonda.

Other RERA-registered projects in J. P. Nagar

Major developers building in J. P. Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Jyoti Abhishek Residency Phase 3?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026