K-RERA · the public record
MAHAVEER PALATIUM
Anekal · REDDY STRUCTURES
Know the project.
Then choose your home.
The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.
The record · free to read
Registration read 20 Sep 2026Progress & dates
The timeline on file.
Available record
No construction trend to plot.
The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.
declared completion
31 Aug 2019
The registered date and a construction update answer different questions. Neither is a confirmation of possession.
K-RERA registration · read 20 Sep 2026
Inventory & scale
What this registration contains.
Filed categories, unchanged · K-RERA registration · read 20 Sep 2026
The whole registration
121.6registered acres
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.
From another project
See the report before you buy.
A published sample shows the level of detail, source illustrations and buyer reasoning. Its findings belong to that project.
Read a sample report ↗The source record
The details behind the headline.
K-RERA · PRM/KA/RERA/1251/308/PR/171015/000357
This project, on the record
The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
Official Registry Facts
Official project scale
RERA filingRegistration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Official carpet area | 172,775 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 492,031 sqm | The land area attached to this K-RERA registration. |
| Open-parking field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Project start date | 01-04-2014 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| PLOTS | 1,099 | 100% | 172,775 sqm |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingNo litigation declared on this project's K-RERA filing.
All 19 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Aug 2019, extended (Section 6 Extension) to 28 Feb 2021 — both dates have passed with no OC on file. The extension on file was granted on 01 Apr 2021 (K-RERA extension no. EX/PRM/KA/RERA/1251/308/PR/210401/000357) — it has been used, its deadline has also passed, and no further extension is recorded.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (75 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| SUPRIT DUTTA & KARABI DAS vs REDDY STRUCTURES PRIVATE LIMITED & UTTAM KUMAR NAIDU | Request RERA to instruct mahaveer to process my refund as early as possible. | AUTHORITY | 29/11/2024 |
| Akash G Nanda vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 26/06/2023 |
| Abhishek G Nanda vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 26/06/2023 |
| Rajesh Yekkala vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all amenities and compensation of 10% of current value on my plot for delayed and energy wasted following up with builder | AUTHORITY | 26/06/2023 |
| SHASHI BHUSHAN KUMAR vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 26/06/2023 |
| Sachin Chavadi vs M/S REDDY STRUCTURES PRIVATE LIMITED | Request RERA to please intervene and help the work get completed at the earliest as promised and mentioned in the agreement. Also compensation for the Clubhouse fees taken in advance for 3years. | AUTHORITY | 26/06/2023 |
| Vishwanath Patil vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion (in next 6 months) with all promised amenities as shown in their sales broucher. | AUTHORITY | 26/06/2023 |
| Manjunath Lakshmaiah vs M/S REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities | AUTHORITY | 26/06/2023 |
| Kuruvalli Rajasekhar Reddy vs MAHAVEER PALATIUM | Compensation from the builder | AUTHORITY | 20/03/2023 |
| Balakrishna Gupta Talasu vs MAHAVEER PALATIUM | Immediate Project Completion with all promised amenities and. Compensation of 10% on my plot value for the Delay, Interest paid to Loan | AUTHORITY | 20/03/2023 |
| Roopashree VM vs MAHAVEER PALATIUM | Immediate Project completion with all promised amenities and compensation of 10% on my plot current value for the delay, Interest paid for loan, Energy wasted following up with builder. | AUTHORITY | 20/03/2023 |
| KASI VISWANADHAM SISTA vs MAHAVEER PALATIUM | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 20/03/2023 |
| Dileep Kumar Ramachandra vs MAHAVEER PALATIUM | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 20/03/2023 |
| Saravana Kumar Rajiah vs MAHAVEER PALATIUM | Immediate Project Completion with all promised amenities and Compensation for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 20/03/2023 |
| Haresh Talreja vs MAHAVEER PALATIUM | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 20/03/2023 |
| Bighnajit Parida vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project completion with all the Promised Amenities and compensation for the delay. | AUTHORITY | 19/06/2023 |
| Anand M S vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 19/06/2023 |
| Rakesh G vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot value for the Delay, Interest paid to Loans | AUTHORITY | 19/06/2023 |
| Ravi S Sajjanar vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder. | AUTHORITY | 19/06/2023 |
| Somanath Kasta vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my current plot value for the Delay, Interest paid to Loans, and Energy wasted with builder | AUTHORITY | 19/06/2023 |
| Sudheer Kumar Vadwa vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my current plot value for the Delay, Interest paid to Loans, Energy wasted with builder | AUTHORITY | 19/06/2023 |
| Kishore T K vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot value for the delay, interest paid to the loan | AUTHORITY | 19/06/2023 |
| Prathibha Gundappa Yarashi vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 19/06/2023 |
| Sathyavathi B R vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 30% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 19/06/2023 |
| Anju Maheshwari vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 19/06/2023 |
| Vicky Hanfee vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot value for the Delay, Interest paid to Loans, Rent Paid, Energy wasted with builder and Extreme Trauma | AUTHORITY | 19/06/2023 |
| Srinivas Somashetty vs M/S REDDY STRUCTURE PRIVATE LIMITED | = Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 19/06/2023 |
| Avinash kaushik vs M/S REDDY STRUCTURE PRIVATE LIMITED | I need full refund of my amount with interest which given to builder. | AUTHORITY | 16/01/2024 |
| Pratap Subramanyam Setty vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate project completion with all promised amenities and 10 % compensation on plot value , bank interest, time , energy and extream trauma. | AUTHORITY | 16/01/2024 |
| MARTIN MENACHERY vs M/S REDDY STRUCTURE PRIVATE LIMITED | Clear completion date from builder,and compensation amount if the date deadline is not met. | AUTHORITY | 16/01/2024 |
| Avinash A S vs M/S REDDY STRUCTURE PRIVATE LIMITED | Project completion with all promised amenities to be handed over at the earliest and compensation for delay. | AUTHORITY | 16/01/2024 |
| Ramya Narasimhaiah vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 16/01/2024 |
| STEEVAN FERNANDEZ vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 16/01/2024 |
| Abhijith R vs M/S REDDY STRUCTURE PRIVATE LIMITED | I request RERA to help me with a full refund of my money with interest and other applicable expenditure incured by me when purchasing the plot or a firm confirmation of deadline by the builder | AUTHORITY | 16/01/2024 |
| VS Pani vs REDDY STRUCTURES PRIVATE LIMITED | Request for Immediate Action 1. Conduct an official survey to verify the boundary measurements of my property. 2. Clarify and rectify the discrepancy to match the registered documents. 3. Ensure compl | AUTHORITY | 15/10/2025 |
| Ram Ratan vs M/S REDDY STRUCTURE PRIVATE LIMITED | Complete refund of all money at 15% interest and additional Rs. 200000 as harassment. | AUTHORITY | 14/06/2023 |
| Amit Sreedharan vs M/S REDDY STRUCTURE PRIVATE LIMITED | RERA to help accelerate project completion. | AUTHORITY | 14/06/2023 |
| Srinivas Ejju vs M/S REDDY STRUCTURE PRIVATE LIMITED | Compensation: I want a money refund that is equal to the current market price of the plot. The current market price of my plot number 685 is Rupees - 5516800.00 as per the Mahavee Palatium price list. | AUTHORITY | 14/06/2023 |
| Swathi Chandrashekar vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 20% on my plot value for the Delay, Interest paid to Loans, Rent Paid, Energy wasted with builder and Extreme Trauma | AUTHORITY | 14/06/2023 |
| Harish Kamat vs M/S REDDY STRUCTURE PRIVATE LIMITED | Refund as per current market rate as quoted by builder for new sales along with compensation for the mental trauma due to legal issue on my plot # 656 & 657 & due to overall delay of project. | AUTHORITY | 14/06/2023 |
| Satyavijay Sawarkar vs M/S REDDY STRUCTURE PRIVATE LIMITED | I want to get compensated for interest paid on my loan till date of final completion | AUTHORITY | 14/06/2023 |
| RAMESH KUMAR B vs REDDY STRUCTURES PRIVATE LIMITED | Immediate project completion with all promised amenities & compensation for the delay, Interest paid to loans, Rent paid/to be paid, Energy wasted following up with builder | AUTHORITY | 12/09/2023 |
| DEBASISH DHAR vs REDDY STRUCTURES PRIVATE LIMITED | Resolve the litigation immediately or swap to new plot where i prefer. = Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, | AUTHORITY | 12/09/2023 |
| GOURI CHIKODI, ARAVIND CHIKODI vs REDDY STRUCTURES PRIVATE LIMITED | Compensation for the delay of past two years. I need monthly compensation for the two year delay. | AUTHORITY | 12/09/2023 |
| KURUVALLI RAJASEKHAR REDDY vs M/s REDDY STRUCTURES PRIVATE LIMITED | Compensation from builder | AUTHORITY | 11/04/2023 |
| Darshan K U vs M/s REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 11/04/2023 |
| Ajay Kashyap vs M/s REDDY STRUCTURES PRIVATE LIMITED | Immediate project completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to loans and energy wasted following up with the builder. | AUTHORITY | 11/04/2023 |
| Shekhar Gupta vs M/s REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 11/04/2023 |
| Suresh Govindan vs M/s REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 11/04/2023 |
| Gnanesh Murthy vs M/s REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 11/04/2023 |
| Abilash Madhusudan Kirani vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities & Compensation of 10% on plot current value for the Delay, Interest on investment, Energy wasted and defer of 3 years maintenance commencement. | AUTHORITY | 08/01/2024 |
| Calvin Christopher Varkey vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot value for the Delay and a alternative solution for my plot which is under litigation | AUTHORITY | 08/01/2024 |
| Nimal Raju vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 08/01/2024 |
| Aby Varghese vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project completion with all promised amenities and compensation of 10% on my plot current valve for the delay , interest paid to loans, energy wasted following up with builder | AUTHORITY | 08/01/2024 |
| Ashok Mazumdar vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate completion of project and compensation for the litigation for Survey no 14 | AUTHORITY | 08/01/2024 |
| Karthik Sharash Chandra vs M/S REDDY STRUCTURE PRIVATE LIMITED | Effective immediate solve litigation and complete project with all promised amenities and Compensate of 10% on my plot current value for the Damage. If else refund with damage on current value of site | AUTHORITY | 08/01/2024 |
| Shrikant BM vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate resolution by the builder to close the litigation issue in survey no.12 or refund complete amount with the interest paid to home loan,registration amount . | AUTHORITY | 08/01/2024 |
| Bharath P vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot value for the Delay, Interest paid to Loans, Rent Paid, Energy wasted with builder and Extreme Trauma | AUTHORITY | 08/01/2024 |
| Vijay Shankar K vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate completion of project and amenities and 10% of my Plot value as compensation for the interest paid to loans, time wasted due to frequent visits to site and builder and stress | AUTHORITY | 08/01/2024 |
| Kaushik Thirumalachar vs M/S REDDY STRUCTURE PRIVATE LIMITED | Need RERA help to push the builder to complete the project in all aspects immediately. And the builder had to refund the bank interest part which we are bearing extra because we are not able to build | AUTHORITY | 08/01/2024 |
| Shailesh Srinivasan vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate project completion with all promised amenities and club house, compensation of 10% on my plot's current market value on account of delay, interest paid to loan, time wasted on follow ups | AUTHORITY | 08/01/2024 |
| Nabin Saha vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 08/01/2024 |
| Ramapriya vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 08/01/2024 |
| Inchara M C vs M/S REDDY STRUCTURE PRIVATE LIMITED | Refund the paid amount along with the interest | AUTHORITY | 08/01/2024 |
| Sanjay vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 08/01/2024 |
| Saurabh Chandra vs M/S REDDY STRUCTURE PRIVATE LIMITED | Mahaveer Palatium" which is a Roman Theme based gated community project was supposed to be completed by 2019. The pictures of all amenities/facilities is attached. The builder, with all the fake prom | AUTHORITY | 08/01/2024 |
| Tejaswi vs M/S REDDY STRUCTURE PRIVATE LIMITED | Immediate completion of all the promised amenities and compensation of 10% on my plot's current value for the delay, interest paid to loans and energy wasted following up with the builder | AUTHORITY | 08/01/2024 |
| Satyavijay Sawarkar vs M/S REDDY STRUCTURE PRIVATE LIMITED | I am expecting compensation on amount paid for promised amenities along with compensation on interest paying on loan | AUTHORITY | 08/01/2024 |
| Pon Umapathy K S vs REDDY STRUCTURES PRIVATE LIMITED | Please provide me with appropriate compensation. | AUTHORITY | 04/03/2023 |
| Ananth K L vs REDDY STRUCTURES PRIVATE LIMITED | Immediate project completion with all promised amenities, Levelling of the plot and compensation of 10% on my plot value for delay, Interest paid on loans | AUTHORITY | 04/03/2023 |
| Lalit Patel vs REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and clubhouse and Compensation of 10% on my plot current value for the Delay, Energy wasted following up with builder | AUTHORITY | 04/03/2023 |
| Preethi Anand vs REDDY STRUCTURES PRIVATE LIMITED | Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder | AUTHORITY | 04/03/2023 |
| Vanishree VM vs REDDY STRUCTURES PRIVATE LIMITED | Immediate project completion with all promissed amenities and compensation of 10% on my plot curretn value for the delay, intrest paid to loan, Energy vasted following up with builder. | AUTHORITY | 04/03/2023 |
| SURYA KUMARI A & MADHURI PRASANNA A vs REDDY STRUCTURES PRIVATE LIMITED | Immediate project completion with promised amenities and compensation of 10% of my plot current value for the delay | AUTHORITY | 04/03/2023 |
| RAMAMANI B M vs REDDY STRUCTURES PRIVATE LIMITED | ACTION AGAINST THE DEVELOPER TO COMPLETE THE PROMISED AMENITIES AND LEVELLING OF THE PLOT | AUTHORITY | 04/03/2023 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (82 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/200305/0005643 05-03-2020 | Refund of GST amount | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AO |
| CMP/201226/0007330 26-12-2020 | refund extra gst amount charged | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AO |
| CMP/210115/0007039 15-01-2021 | Refund of GST amount | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AUTHORITY FULLBENCH |
| CMP/210117/0007459 17-01-2021 | REFUND OF EXTRA GST 4% CHARGED | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AO |
| CMP/210201/0007547 01-02-2021 | REFUND OF EXTRA PAID GST AMOUNT | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AUTHORITY FULLBENCH |
| CMP/210701/0008086 01-07-2021 | Refund of GST Amount | MAHAVEER PROMENADE (another project by this promoter) | DISPOSED AUTHORITY FULLBENCH |
| CMP/211012/0008432 12-10-2021 | Unable to make use of plot due to litigation | MAHAVEER PALATIUM | DISPOSED AUTHORITY BENCH4 |
| CMP/211027/0008477 27-10-2021 | Refund of advance paid for blocking plots | MAHAVEER PALATIUM | DISPOSED AO |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Project team & certifications
RERA filingK-RERA names 1 project professional/vendor row across Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Contractor | K RAMAKRISHNA RAJU | - | 2000 | JP Nagar 7th phase, RBI LAYOUT |
Builder track record
RERA filingReddy Structures has 10 other K-RERA-registered projects in our records (average reported construction progress 67%). 7 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.
RERA 70% project account is on file: HDFC RICHMOND ROAD (IFSC HDFC0000523, a/c …5952). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Construction photo filings
RERA filingK-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
Location & Connectivity
The nearest major job hub is ~11 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.
| Landmark | Straight-line |
|---|---|
| Electronic City | 11 km |
| Bellandur–Marathahalli belt | 21 km |
| MG Road / city centre | 24 km |
| Whitefield IT hub | 28 km |
| Outer Ring Road / Manyata | 32 km |
| Kempegowda Int'l Airport | 50 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.