RERA Property Intelligence Report · Preview

Mantri Manyata Energia

BUOYANT TECHNOLOGY CONSTELLATIONS · Bengaluru North · K-RERA PRM/KA/RERA/1251/309/PR/171014/000439

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

887
Registered units
₹334.9 Cr
Est. construction cost
Units profiled
40
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units887Total inventory registered with K-RERA.
Registered land area46,134 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI3.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings6Official tower/wing count in the K-RERA detail page.
Parking disclosed971 total (0 open) — 1.09 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date13-07-2015

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
A18148162-
B18148162-
C18148162-
H18148162-
I18148162-
J18147161-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 887 official flat/unit rows, matching the 887 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2.5-BHK44281.3-81.5 sqm5.9-6.3 sqm442
3-BHK (A)44188.4 sqm6.4-6.8 sqm441
1.5-BHK463.2-63.2 sqm4.7-4.9 sqm4

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
A14863.2-88.4 sqm4.9-6.7 sqm148
B14863.2-88.4 sqm4.7-6.4 sqm148
C14881.3-88.4 sqm5.9-6.4 sqm148
H14881.3-88.4 sqm5.9-6.4 sqm148
I14863.2-88.4 sqm4.7-6.4 sqm148
J14763.2-88.4 sqm4.9-6.8 sqm147
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-002A01.5-BHK63.2 sqm4.9 sqm1
A-003A03-BHK (A)88.4 sqm6.7 sqm1
A-005A02.5-BHK81.3 sqm6.2 sqm1
A-006A02.5-BHK81.3 sqm6.2 sqm1
A-007A03-BHK (A)88.4 sqm6.7 sqm1
A-008A03-BHK (A)88.4 sqm6.7 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~913 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 887 homes across 6 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 971 parking spaces for 887 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~6 sqm per home; across all 887 homes that is ~12% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

3 of 35 compliance document slots are filed as Not Applicable; the remaining 32 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Jun 2020, extended (Section 6 Extension) to 30 Dec 2021 — both dates have passed with no OC on file. The extension on file was granted on 13 Dec 2021 (K-RERA extension no. EX/PRM/KA/RERA/1251/309/PR/211213/000439) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

2 K-RERA orders on this project (PROJECT EXTENSION) — read the order copies on the K-RERA portal.

K-RERA complaint orders (47 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
SHARATH KUMAR MAHAJAN vs MANTRI TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERSDirect to complete the project in another 6 months, handover fully furnished flat No. J-1706 , to pay delay period interest, if not respondents liable to pay claims of complainant claimed as in MOCAUTHORITY30/04/2024
Santhi Lakshmanan vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDcompensation, refundAUTHORITY29/07/2022
MR JOSEPH MATHIAS vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the Facts of ComplaintAUTHORITY27/03/2023
MR AMARJEET SINGH GILL vs M/S.MANTRI TECHNOLOGY CONSTELLATIONSRequest for the refund of the amount with interestAUTHORITY25/05/2023
MR SUJAY MEETHALE PURAYIL AND ANOTHER vs M/S.MANTRI TECHNOLOGY CONSTELLTIONSDirect Developer 1.Refund amount paid by complainant towards sale consideration with interest 2.Pay loan outstanding amount directly to Bank 3.Pay Complainants all Pre-EMI/EMIs paid to Bank till date.AUTHORITY22/07/2024
Jai Sahani vs Mantri Technology Constructions Private Liitedfull refund of their own contribution and the PRE-EMIs paid to the financial institute on account of the default of the RespondentAUTHORITY22/06/2026
MR.ARJUN R MENON vs M/S.MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the Facts of ComplaintAUTHORITY21/04/2023
Fahmida Natankar Anwar vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the Facts of ComplaintAUTHORITY20/01/2023
H Anand vs MANTRI TECHNOLOGY CONSTELLATIONS PRIVATE LIMITEDAs prayed in the Facts of ComplaintAUTHORITY19/10/2022
Madhumathi A vs MANATRI TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the Facts of ComplaintAUTHORITY19/10/2022
Manish Prabhat Tigga vs MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the Facts of ComplaintAUTHORITY18/01/2023
SMARAN THOMAS vs MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the Facts of ComplaintAUTHORITY18/01/2023
Sudhindra R vs MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the ComplaintAUTHORITY18/01/2023
Krishna Hegde vs MANTRI TECHNOLOGY CONSTELLATIONSPlease help me to get my House or Return my money with 18% PA interest till now.AUTHORITY18/01/2023
Sandeep Radhakrishnan vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDFast track completion within a period not extending a year. If builder cannot handle further, please take action to handover the project to any other reliable reputed builder and complete the projectAUTHORITY15/11/2022
Lakshminarayana and Padma vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDRelief as per the decision of the supreme court cited aboveAUTHORITY15/11/2022
SIDDANNA MARPALLE vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the Facts of ComplaintAUTHORITY15/10/2022
ANAND H P vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDDelay in handling over possession and other relief (Including interest and penalty)AUTHORITY15/10/2022
GAGAN SHETTY & ANOTHER vs MANTRI TECHNOLOGY CONSTELLATIONS PVT. LTD.,Request for the refund of the amount with interestAUTHORITY14/05/2024
Prakash Mall vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD, MANYATA REALTYAs prayed for Facts of ComplaintAUTHORITY10/10/2022
Hardikkumar Shah vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD, MANYATA INFRASTRUCTURE DEVELOPMENT PRIVATE LTD., MANYATA REALTYAs prayed in the Facts of CaseAUTHORITY10/10/2022
Kandi Phani Kumar vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY09/11/2022
Rashmi Ranjan Mishra vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the Facts of ComplaintAUTHORITY09/11/2022
Vijayaraghavan S V vs Mantri Technology Constellations Pvt Ltd.,As prayed in the Facts of CaseAUTHORITY08/11/2022
Prashant S Ghargi vs Mantri Technology Constellations Pvt LtdAs prayed in the Facts of ComplaintAUTHORITY07/11/2022
MR.VARUN RAVISHANKAR vs M/S.MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in Facts of ComplaintAUTHORITY07/03/2023
MR.N.V.RAGHAVAN vs M/S.MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the Facts of ComplaintAUTHORITY07/03/2023
Harshil J Shah vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD(BUOYANT TECHNOLOGY CONSTELLATION PVT LTD), MANYATA REALTYAs prayed in the Facts of ComplaintAUTHORITY06/12/2022
Jai Sahani vs 1. MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. 2. MANYATA INFRASTRUCTURE DEVELOPMENT PVT LTDAs prayed in Facts of ComplaintAUTHORITY06/09/2022
Shanthi Chandrababu vs 1.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. 2. GOKULAM SHELTERS PVT LTDas prayed in the Facts of ComplaintAUTHORITY06/09/2022
Indrani N R vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. CURRENTLY KNOWN AS BUOYANT TECHNOLOGY CONSTELLATIONS PVT LTDAs prayed in the ComplaintAUTHORITY05/09/2022
Basawaraj Yallappa Hongal vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD., CURRENTLY KNOWN AS BUOYANT TECHNOLOGY CONSTELLATIONS PVT LTD.As prayed in the Facts of ComplaintAUTHORITY05/09/2022
MALLIKARJUNA JS & KOMALA ASHOK vs MANTRI TECHNOLOGY CONSTELLATIKONS PVT. LTD.,Refund of advance sale consideration of Rs.10,00,000/- (Rupees Ten Lakh only) along with compensation calculated at Rs.4,00,000/- (Rupees Four Lakh only) at the rate of 24% p.aAUTHORITY05/08/2024
MR C.R.RENIL KUMAR & ANOTHER vs M/S.MANTRI TECHNOLOGY & OTHERSDirect Developer to: 1.Refund sale consideration and Bank loan disbursed amount along with interest 2.Pay to Complainant Pre-EMIs & EMIs paid till date to bank, 3.Pay loan outstanding amount to BankAUTHORITY05/01/2024
Amit Kumar Singh vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Shashank Aroor vs Mantri Manyata EnergiaAs prayed in the Facts of complaintAUTHORITY02/11/2022
Sriram and Anuradha R vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Kumaraswamy R S vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Anoop Kumar H S R vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Niveditha B K vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Ravi Tomal Raghavendra vs Mantri Technology Constellations Pvt. Ltd.As prayed for in the Facts of complaintAUTHORITY02/11/2022
Vijaya S S vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of CaseAUTHORITY02/11/2022
Noor Ayesha vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Dr.Akshay Dwarakanath vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Mubeena Kausar vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
Sukanta Kumar Nayak vs Mantri Technology Constellations Pvt. Ltd.As prayed in the Facts of ComplaintAUTHORITY02/11/2022
MR.SATHISH R THOPPEY vs M/S.MANTRI TECHNOLOGY CONSTELLATIONSAs prayed in the Facts of ComplaintAUTHORITY01/03/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (96 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190213/0002123
13-02-2019
Delay in handing over, INTEREST AND COMPENSATIONMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190219/0002210
19-02-2019
Delay in handing over, interest and compensationMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190228/0002318
28-02-2019
Delay in possession, interest and compensationMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190301/0002324
01-03-2019
Delay in possession, compensation, interest and other reliefsMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190301/0002326
01-03-2019
delay in possession, interest & compensationMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190318/0002456
18-03-2019
Delay in handing over apartmentMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190325/0002512
25-03-2019
Delay in possession, interest, compensationMantri Manyata Lithos (another project by this promoter)DISPOSED AO
CMP/190329/0002535
29-03-2019
Delay in handing over possessionMantri Manyata Lithos (another project by this promoter)DISPOSED AO

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectEdifice Consultants Pvt Ltd.-NA12 Museum Road, 12 Museum Road
ContractorTATA PROJECTS LIMITED,-NA1-7-80 to 87, Prenderghast Road
Structural engineerNAGESH CONSULTANTS---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹37.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Kasturba Road BranchI (IFSC HDFC0000009, a/c …7496). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Outer Ring Road / Manyata2 km
MG Road / city centre9 km
Bellandur–Marathahalli belt15 km
Whitefield IT hub17 km
Kempegowda Int'l Airport18 km
Electronic City24 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Buoyant Technology.

Other RERA-registered projects in Nagavara

Major developers building in Nagavara

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.