Bangalore/Project record

K-RERA · the public record

Nitesh Cape Cod Phase I

Bengaluru East · NITESH URBAN DEVELOPMENT

Know the project.
Then choose your home.

The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.

31 Dec 2018declared completionK-RERA registration · read 20 Sep 2026
241registered unitsK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Available record

No construction trend to plot.

The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.

declared completion

31 Dec 2018

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

3Bed - 13
4

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

4.4registered acres

55.1registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/446/PR/180509/001674

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2018
Land area17,705 sq m (4.4 acres)
Homes registered241
Tower/wing entries5
Unit mix4 × 3Bed - 13

In context

Density55.1 homes per acre
Density in context23rd percentile of 1119 Bengaluru East projects (median 75.5)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units241Total inventory registered with K-RERA.
Official carpet area121 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area17,705 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.16Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries5Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)241Separate filed counts; these categories may overlap and are not added together.
Open-parking field46Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date19-03-2012

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3Bed - 134100%121 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Block A125050-
Block B125050-
Block C123939-
Block D125050-
Block E125252-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 241 official flat/unit rows, matching the 241 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK168103.3-121.3 sqm41.1-46.9 sqm168
2BHK4880.5 sqm32.4 sqm48
4BHK25130.0-155.3 sqm52.1-61.3 sqm25

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Block E5280.5-108.2 sqm32.4-42.8 sqm52
Block A50106.0-130.0 sqm43.3-52.1 sqm50
Block B50106.0-121.3 sqm43.3-46.9 sqm50
Block D5080.5-105.7 sqm32.4-42.9 sqm50
Block C39103.3-155.3 sqm42.8-61.3 sqm39
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
NICC-A-0101Block A03BHK106.0 sqm43.3 sqm1
NICC-A-0102Block A03BHK106.0 sqm43.3 sqm1
NICC-A-0103Block A03BHK106.0 sqm43.3 sqm1
NICC-A-0104Block A04BHK130.0 sqm52.1 sqm1
NICC-A-0201Block A13BHK106.0 sqm43.3 sqm1
NICC-A-0202Block A13BHK106.0 sqm43.3 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

9 of 34 compliance document slots are filed as Not Applicable; the remaining 25 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2018, extended (an extension) to 31 Dec 2019 — both dates have passed with no OC on file. An extension application filed on 09 May 2019 is pending with K-RERA — until it is approved, the registration stands lapsed.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

2 K-RERA orders on this project (PROJECT EXTENSION, PROJECT TOR) — read the order copies on the K-RERA portal.

K-RERA complaint orders (31 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
AMEER SHAHUL vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDRefund of the collected funds of 26.85 lakh with 18% interestAUTHORITY30/01/2025
RAUNAK KUNDU AND ANOTHER vs NITESH URBAN DEVELOPMENT PVT LTDAs prayed in the Facts of ComplaintAUTHORITY16/03/2024
Devendra Ram Krishna vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDRelief u/s 3 4 5 7 8 11 15 35 38 59 60 61 62 and other section of RERA Act. Due to lack of space refer facts of complaint column & Last Enclosure Facts of Complaint and Reliefs and interim reliefsAUTHORITY16/03/2024
Hareesh Kurup vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Kiran Kumar Pujari vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Manish Kumar Agarwal vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
NAVEEN CHANDRA vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
PAWAN MUNSHI vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Prabhu Loganathan vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Pranav Kumar Agarwal vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Puneet Bhatia vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Sandeep Mallya Perdoor vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Sanjeev K Chaudhary vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Varun Gupta vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
VIKRAM BABARAO DABRE vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Saurabh Kumar vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Bhunesh Singh Kshatri vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Raghunathan Govindarjapuram vs NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY16/03/2024
Aanchal Agarwal vs INESA Ventures LLPAs prayed in Facts of ComplaintAUTHORITY15/10/2022
Vinay Agarwal vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDAs prayed in the facts of ComplaintAUTHORITY01/03/2025
BIBEK DIPTA CHAUDHURI vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDi) Direction to the Builder to handover possession of my apartment, complete in all respects and in conformity with the Construction Agreement and for the consideration mentioned therein, with all addAUTHORITY01/03/2025
Deepak Kubendran vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDCancel agreement, refund payment with interest compensationAUTHORITY01/03/2025
Gopi Krishna Ravinuthala vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY01/03/2025
N Jeevan Belliappa vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY01/03/2025
V V S SANTOSH KUMAR vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY01/03/2025
Tarun Bansal vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDRelief u/s 3 4 5 7 8 11 15 35 38 59 60 61 62 and other section of RERA Act. Due to lack of space refer facts of complaint column & Last Enclosure Facts of Complaint and Reliefs and interim reliefsAUTHORITY01/03/2025
Vishwas Kudli Nagaraja vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY01/03/2025
Sundaram Narayanaswamy vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDReliefs under Section 3, 4, 5, 6, 7, 8, 11, 19, 34, 35, 38, 59, 60, 61, 62 and various provision of RERA Act and Karnataka RERA Rules, elaborate reliefs prayed in the Facts of Complaint ColumnAUTHORITY01/03/2025
Amit Kumar Rathi vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDWithdraw/Exit from project with full compensatory interest from the respective date of payment.AUTHORITY01/03/2025
JIBU THOMAS VELAMKALAM vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDDelayed compensation and Refund of entire amount with InterestAUTHORITY01/03/2025
Bijoy P vs M/S NITESH URBAN DEVELOPMENT PRIVATE LIMITEDFull Refund with Interest for the delayAUTHORITY01/03/2025

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (34 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190320/0002471
20-03-2019
CompensationNitesh Cape Cod Phase IDISPOSED AO
CMP/190506/0002921
06-05-2019
Refund due to non completion of projectNitesh Cape Cod Phase IDISPOSED AO
CMP/200804/0006291
04-08-2020
Refund and CompensationNitesh Cape Cod Phase IDISPOSED AUTHORITY FULLBENCH
CMP/200807/0006317
07-08-2020
Refund- 7 year delayNitesh Cape Cod Phase IDISPOSED AO
CMP/201004/0006697
04-10-2020
Refund of money with interest and delay compensationNitesh Cape Cod Phase IDISPOSED AUTHORITY BENCH5
CMP/201010/0006810
10-10-2020
Provide Compensation for inordinate delay in handing over the apartmentNitesh Cape Cod Phase IDISPOSED AUTHORITY FULLBENCH
CMP/201020/0006926
20-10-2020
Refund of Rs 26.85 lakh with 18 percent interestNitesh Cape Cod Phase IDISPOSED AUTHORITY BENCH4
CMP/201022/0006917
22-10-2020
Delayed Compensation and Refund of the entire amount along with interestNitesh Cape Cod Phase IUNDER ENQUIRY AUTHORITY FULLBENCH

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectAECOM-2008C wing first floor Mittal tower, no 6 M G Road
ContractorSimplex Infrastructures Ltd-1924S C Road Brigade Plaza, Unit C Anand Rao Circle
Structural engineerNovel Engineering Consultants---

Builder track record

RERA filing

Nitesh has 10 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Nitesh Urban”). 10 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a higher delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹60.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: YES BANK Kasturba Road (IFSC YESB0000022, a/c …0927). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Bellandur–Marathahalli belt2 km
Electronic City9 km
MG Road / city centre9 km
Whitefield IT hub10 km
Outer Ring Road / Manyata15 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Nitesh Urban. View Nitesh Urban's full track record →

Other RERA-registered projects in Bellandur

Major developers building in Bellandur

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Nitesh Cape Cod Phase I?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 20 Sep 2026