85%construction reportedQ1 2026 filing
24units not bookedof 46 · Q1 2026 filing
46registered unitsK-RERA registration · read 16 Jul 2026

The record · free to read

Registration read 16 Jul 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q1 2026

declared completion

Not recorded

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 16 Jul 2026

Inventory & scale

What this registration contains.

Residential
22
Commercial
24

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.3registered acres

147.4registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1257/334/PR/311224/007330

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Land area1,263 sq m (0.3 acres)
Homes registered46
Tower/wing entries1
Unit mix22 × Residential, 24 × Commercial

In context

Density147.4 homes per acre
Density in context91st percentile of 4882 projects in this register (median 82.1)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units46Total inventory registered with K-RERA.
Official carpet area2,413 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area4,664 sqmUseful scale context when comparing density and project cost.
Registered land area1,263 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.84Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)26Separate filed counts; these categories may overlap and are not added together.
Covered-parking field26Separate filed counts; these categories may overlap and are not added together.
Open-parking field5Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberE2/BA 37/2023-24 (167349)Use this to match the sanctioned drawing set shown by the builder.
Plan approval date14-05-2024
Project start date15-09-2024

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Residential2248%1,212 sqm
Commercial2452%4,193 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Radha Raman6462614.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 46 official flat/unit rows, matching the 46 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
SHOP2481.8-440.3 sqft0.3-1.7 sqft0 (24 with 0)
3 BHK111,165.3-1,272.9 sqft4.5-4.9 sqft11
2 BHK8829.4-902.0 sqft3.2-3.5 sqft8
1 BHK3443.4-478.9 sqft1.7-1.8 sqft0 (3 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Radha Raman4681.8-1,272.9 sqft0.3-4.9 sqft19 (27 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1Radha Raman0SHOP440.3 sqft1.7 sqft0
2Radha Raman0SHOP358.9 sqft1.4 sqft0
3Radha Raman0SHOP359.3 sqft1.4 sqft0
4Radha Raman0SHOP130.2 sqft0.5 sqft0
5Radha Raman0SHOP96.7 sqft0.4 sqft0
6Radha Raman0SHOP195.3 sqft0.8 sqft0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 28 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

0 of 1 applicable approvals are on file; still outstanding: Water supply and sewage board. Confirm each has been granted, not merely applied for, before booking.

9 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardTo Be Applied-View NOC

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantCA Prasanna Shenoy0436592002Dakshina Kannada, Karnataka - 575006
EngineerHosadurga Anand BhatF-12830102003Dakshina Kannada, Karnataka - 575006
ArchitectC Chethan KamathCA/2003/320932003Dakshina Kannada, Karnataka - 575004
ContractorSuraj Karkera-2003Dakshina Kannada, Karnataka - 575001

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹1.64 Cr collected from buyers, ₹1.15 Cr withdrawn from the project's escrow account.

Construction progress64% → 85% (+21 pts)
Units sold/booked as registered22/46 (48%)
Buyer collections in available QPRs₹5.65 Cr
Escrow withdrawals in available QPRs₹3.95 Cr (0.70x collections)
  • Construction progress moved from 64% to 85% across the filed QPR window.
  • The builder has drawn 0.70x of buyer collections from escrow (about 70% of the ₹6 Cr collected) — money is largely staying in the regulated escrow account rather than being pulled out ahead of spend, which is the safer direction. A ratio near or above 1.0 would be the one to scrutinise.

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹22.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank Mangalore IFSC Code : UTIB0000077 Pin Code : 575003. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~302 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
MG Road / city centre300 km
Outer Ring Road / Manyata302 km
Electronic City306 km
Bellandur–Marathahalli belt309 km
Kempegowda Int'l Airport313 km
Whitefield IT hub316 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Avyuktha Infratech.

Other RERA-registered projects in Bellandur

Major developers building in Bellandur

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Radha Raman?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026