RERA Property Intelligence Report · Preview

THE GREENS PHASE I

Sanchaya Land And Estate · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/171015/000701

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
3
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

1,278
Registered units
₹181.0 Cr
Est. construction cost
Units profiled
19
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units1,278Total inventory registered with K-RERA.
Registered land area51,040 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings16Official tower/wing count in the K-RERA detail page.
Parking disclosed1,277 total (825 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date16-03-2013

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
AMBER TOWER A99090-
AMBER TOWER B97272-
AMBER TOWER C97272-
AMBER TOWER D97272-
AMBER TOWER E97272-
PINE TOWER A97272-
PINE TOWER B97271-
PINE TOWER C99090-

Showing first 8 of 16 tower/wing rows.

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 1,278 official flat/unit rows, matching the 1,278 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK1,20643.7-59.6 sqm26.2-33.5 sqm1,206
3BHK7269.1-76.7 sqm42.1-45.2 sqm72

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
AMBER TOWER A9051.6-59.6 sqm30.1-33.5 sqm90
MAPLE TOWER A9048.3 sqm26.2 sqm90
MAPLE TOWER B9048.3 sqm26.2 sqm90
MAPLE TOWER C9048.3 sqm26.2 sqm90
PINE TOWER C9043.7 sqm26.2 sqm90
PINE TOWER D9043.7 sqm26.2 sqm90
PINE TOWER E9043.7 sqm26.2 sqm90
AMBER TOWER B7251.6-59.6 sqm30.1-33.5 sqm72
AMBER TOWER C7251.6-59.6 sqm30.1-33.5 sqm72
AMBER TOWER D7251.6-59.6 sqm30.1-33.5 sqm72
AMBER TOWER E7251.6-59.6 sqm30.1-33.5 sqm72
MAPLE TOWER D7248.3 sqm26.2 sqm72

Showing first 12 of 16 tower/wing groups.

Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1AMBER TOWER A02BHK53.9 sqm31.0 sqm1
2AMBER TOWER A02BHK51.6 sqm33.5 sqm1
3AMBER TOWER A02BHK59.6 sqm30.1 sqm1
4AMBER TOWER A02BHK59.6 sqm30.1 sqm1
5AMBER TOWER A02BHK59.6 sqm30.1 sqm1
6AMBER TOWER A02BHK51.6 sqm33.5 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~549 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a large, multi-tower township — 1278 homes across 16 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 1,277 parking spaces for 1,278 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~29 sqm per home; across all 1,278 homes that is ~72% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 15 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2014, extended (an extension) to 31 Dec 2015 — both dates have passed with no OC on file. An extension application filed on 07 May 2024 is pending with K-RERA — until it is approved, the registration stands lapsed.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (83 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
AJITH KUMAR PATHAK vs SANCHAYA LAND AND ESTATES PVT. LTD.It is therefore most respectfully prayed that the builder may kindly be directed to pay Rs. 153,55,982.00 to me along with pendent-lite and future interest @18% per annaum till its realizationAUTHORITY30/12/2023
Sunil Kumar D vs Sanchaya Land And Estate Pvt Ltdrefund of the entire sale consideration amount of Rs. 39,59,655/- paid by the Complainant for the both the flats with 24% interest P.A till the date of realisationAUTHORITY29/10/2022
Thankamani Govindan vs Sanchaya Land And Estate Pvt LtdDirect Respondent to refund Rs. 39,21,088.04 being the amount with interest as on 30.11.2022, pay Rs.3,41,250/- for delay caused to complete construction of Flat and pay penalty of 5% of Project cost.AUTHORITY28/04/2025
Syed Haroon Rasheed vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer :-AUTHORITY27/07/2022
Avanish Kant Agnihotri vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for the following reliefs and prayer before Hon'able RERA K, Adjudicating officerAUTHORITY27/07/2022
Sudhir Menon vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer :-AUTHORITY27/07/2022
Uvaiz Ahmed Madar vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating OfficerAUTHORITY27/07/2022
Maitri K vs THE GREENS PHASE IHence for the brief facts attached in pdf herewith , we are seeking reliefAUTHORITY27/07/2022
Nisha Atey vs THE GREENS PHASE IDelayed compensation, refund of all pending pre- emi installments, project completion and handover along with OC, CC, Khata number, Fire dept clearanceAUTHORITY27/07/2022
Sachin S mohite vs THE GREENS PHASE IIn view of the facts mentioned in paragraph 4 above, the applicant prays for the following compensation(s) Hence for the brief facts mentioned above we are seeking for following Reliefs and Prayer befAUTHORITY27/07/2022
Neetu Verma vs THE GREENS PHASE IFor the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer:-AUTHORITY27/07/2022
Suryakant Ramachandra Jakkaraddi vs THE GREENS PHASE IProject Hand-Over,Refund PreEMI,Delay compensationAUTHORITY27/07/2022
R. SARASWATHI vs THE GREEN PHASE 1Hence or the brief facts mentioned above we are seeking delayed compensation, pre emi settlement, etc., - mentioned in the detailed complaint.AUTHORITY27/07/2022
Vinesh G Nair vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer :-AUTHORITY27/07/2022
Vinaya Dalvi vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating OfficerAUTHORITY27/07/2022
Vikas Nandurkar vs THE GREENS PHASE IDelivery with Delay CompensationAUTHORITY27/07/2022
SHARMILA vs THE GREENS PHASE IRefund of amount and compensationAUTHORITY27/07/2022
VIJAY RAJ SUD vs SANCHAYA LAND AND ESTATE PVT LTD.,To award Complainant Rs 40,00,000/- (Rupees Forty Lakhs Only) from Respondent including full refund of invested amount of Rs 10,89,972/- plus Interest at 18% per annum for 6 years plus damages.AUTHORITY27/01/2025
Robert Steven Dsilva vs Sanchaya Land And Estate Pvt LtdHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer :-AUTHORITY26/05/2022
JEEVANANDA S & SHOBA D vs SANCHAYA LAND AND ESTATES PVT. LTD.Refund with interestAUTHORITY26/02/2024
Manita Sethi vs THE GREENS PHASE IMultiple Reliefs.AUTHORITY25/07/2022
Neetu Verma vs Neetu VermaFor the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating Officer:-AUTHORITY25/07/2022
Sanchita Banerjee vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating OfficerAUTHORITY25/07/2022
Amar Haldipur vs THE GREENS PHASE I1. Direct the Respondents to complete the project and hand over the apartment bearing NO.404 , Tower AMBER B, in The Greens Phase I as promised under various advertisement, sale broacher along with aAUTHORITY25/07/2022
SANDHYA SALLAN vs THE GREEN PHASE 12. Direct the Respondents to refund all pending PRE-EMI installment amounting to a sum of Rs.8,64,700 /- (Eight Lakhs Sixty Four thousand Seven hundred only) along with interest from the respective daAUTHORITY25/07/2022
Elvina Pereira vs THE GREENS PHASE IRefer Complaint LetterAUTHORITY25/07/2022
Jayshree Shivram Pushkarna vs THE GREENS PHASE I• Possession of the booked flat with all legal documents such Completion Certificate, Occupancy Certificate, Bonafide Khatha issued by competent authority, and all the promised amenities as specifiedAUTHORITY25/07/2022
RASHMI PATEL vs THE GREEN PHASE 11. Direct the Respondents to complete the project and hand over the apartment bearing NO.008 , Tower AMBER D , in The Greens Phase I as promised under various advertisement, sale broacher along withAUTHORITY25/07/2022
LAILA ABDUL SAMAD vs THE GREENS PHASE IDirect the Respondents to pay delayed compensation at rate of 12% annual rate of interest, compounded annually from 2015, from the date of default of delivery for the said flat PINE E-503, The GreensAUTHORITY25/07/2022
Kamlianthang Guite vs THE GREENS PHASE IDirect the respondent to complete the project and hand over to their customers with all requisite documents, refund all pending pre-EMIs, pay delayed compensation, not to sent usurious demand note, etAUTHORITY25/07/2022
Sumit Pratap Sawe vs THE GREENS PHASE IOrder for refund with compensationAUTHORITY25/07/2022
Hadlee Raymond D Silva vs THE GREENS PHASE IAs per brief facts mentioned above & detailed complaint attached, I seek for relief and pray before Hon'ble RERA-K and Adjudicating officer as stated in section 5 of Form O uploaded as supporting docAUTHORITY25/07/2022
Reinbert Fernandes vs Sanchaya Land And Estate Pvt LtdAs per brief facts mentioned above & detailed complaint attached, I seek for relief and pray before Hon'ble RERA-K and Adjudicating officer as stated in section 5 of Form O uploaded as supporting docAUTHORITY25/07/2022
THE GREENS PHASE I vs Sanchaya Land And Estate Pvt LtdHENCE FOR THE BRIEF FACTS MENTIONED ABOVE WE ARE SEEKING FOR FOLLOWING RELIEFS ANDPRAY BEFORE HON'BLE RERA K ADJUDICATING OFFICER.AUTHORITY25/07/2022
Asutosh Panda vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for following reliAUTHORITY25/07/2022
Amar Nath Singh vs THE GREENS PHASE IHence for the brief facts mentioned above we are seeking for the following relief and prayer before Hon'ble RERA Karnataka Adjudicating OfficerAUTHORITY25/07/2022
Sundeep MV vs THE GREENS PHASE IDirect the respondents to: complete the project and handover as promised in sales brochure along with OC and relevant approvals, refund all pending pre-EMIs with interest, pay delayed compensation etcAUTHORITY25/07/2022
Cyril Thomas Zacharia vs THE GREENS PHASE IRefund paid amount with Interest, compensationAUTHORITY25/07/2022
SMITA MUKESH GUPTA vs SANCHAYA LAND AND ESTATE PVT LTD.,Hence for the brief facts mentioned above we are seeking for following reliefs and prayer before Honourable RERA K,Adjudicating Officer:-AUTHORITY25/02/2025
RAKESH NAYAK vs SANCHAYA LAND AND ESTATE PVT LTD.,1. To execute Sale Deed & handover the flat bearing No. 210 of the Greens Phase-1 Project in favor of the complainant. 2. To direct the respondent to pay delay compensation & penalty as applicableAUTHORITY25/02/2025
PRAVEEN SHIRMAL vs SANCHAYA LAND AND ESTATE PVT LTD.,Refund of the entire amount paid with interest till Date for the above mentioned PropertyAUTHORITY25/02/2025
MUMTAZ FARZAND PRASLA vs The Green Phase -1To Pay Interest on delay period and to complete the project in all respects, obtain OC, Permanent electricity, Water and handover the habitalbe Possession of the Flat in favour of Purchaser/AllotteeAUTHORITY24/03/2026
RAGUNATHAN KETHANDAPATTI CHAKRAVARTHY & 100+ others vs Sanchaya Land And Estate Pvt LtdAs prayed in factsAUTHORITY21/07/2025
DHWITA SHAH vs SANCHAYA LAND AND ESTATE PVT LTD.,Necessary steps for posssession of flat and take necessary steps for claim and compensationAUTHORITY19/02/2025
MEENAKSHI AMARNANI vs SANCHAYA LAND AND ESTATE PVT LTDDELAYED INTEREST, POSSESSION OF APARTMENT AND PROJECT COMPLETIONAUTHORITY19/02/2025
MEENAKSHI AMARNANI vs SANCHAYA LAND AND ESTATE PVT LTDDELAYED INTEREST, POSSESSION OF APARTMENT AND PROJECT COMPLETIONAUTHORITY19/02/2025
MEENAKSHI AMARNANI vs SANCHAYA LAND AND ESTATE PVT LTDDELAYED INTEREST, POSSESSION OF APARTMENT AND PROJECT COMPLETIONAUTHORITY19/02/2025
MEENAKSHI AMARNANI vs SANCHAYA LAND AND ESTATE PVT LTDDELAYED INTEREST, POSSESSION OF APARTMENT AND PROJECT COMPLETIONAUTHORITY19/02/2025
M SREE NIVETHA vs SANCHAYA LAND AND ESTATE PVT LTDTo get me the refund amount of Rs. 2 Lakhs alongwith suitable compensation and interest for the delay.AUTHORITY19/02/2025
INDIRA DEVI JAIN & ANAND CHAGANRAJ SHRIMNAL vs SANCHAYA LAND AND ESTATE PVT LTDRefund of the amt paid with interest till date.AUTHORITY19/02/2025
Shubhashish Das vs Sanchaya Land And Estate Pvt LtdFull refund(self financed & loan)+interest+penaltyAUTHORITY18/10/2022
A V Kedia and Associates vs Sanchaya Land And Estate Pvt LtdWe request that Developer be directed to discharge all obligations and execute cancellation deed alongwith refund of amount paid and compensation with interest @ 24% p.a. compounded annually.AUTHORITY18/10/2022
Suman Kedia vs Sanchaya Land And Estate Pvt LtdWe request that Developer be directed to discharge all obligations and execute cancellation deed alongwith refund of amount paid and compensation with interest @ 24% p.a. compounded annually.AUTHORITY18/10/2022
U SATYANARAYANA vs Sanchaya Land And Estate Pvt LtdPrayer is for refund of Net total (20,30,000 + 2,50,000) amount of Rs. 22,80,000/-(Twenty Two Lacs Eighty Thousand Only).AUTHORITY18/10/2022
Jeevanti Harish vs Sanchaya Land And Estate Pvt LtdDirect Respondents to complete the project and hand over the apartment. Compensation for PRE_EMI, Delay, Mental Agnoy, Unfair Trade practices, Cost of Litigation.AUTHORITY18/05/2022
Avinash Kumar vs Sanchaya Land And Estate Pvt Ltd1. Completion of the project and handing over possession with all legal documents such as OC; compensation for delay with interest. Directing respondent not to alienate our interest in the booked flatAUTHORITY18/05/2022
Havard Valerian DSilva vs Sanchaya Land And Estate Pvt LtdAs per brief facts mentioned above and detailed complaint attached, I seek for reliefs and pray before Hon'ble RERA-K and Adjudicating officer as stated in section 5 of Form O uploaded as supporting dAUTHORITY18/05/2022
Candy Nianglunghoih vs Sanchaya Land And Estate Pvt LtdSeeking relief and compensation for delaysAUTHORITY18/05/2022
Sony Sukumar Kattoor vs Sanchaya Land And Estate Pvt LtdAs per brief facts mentioned above and detailed complaint attached, I seek for reliefs and pray before Hon'ble RERA-K and Adjudicating officer as stated in section 5 of Form O uploaded as supprtng docAUTHORITY18/05/2022
Devendra Pandurang Bhagat vs Sanchaya Land and Estate Pvt LtdRefund of Rs. 42,83,738/-AUTHORITY18/03/2025
Abhishek Sharma vs Sanchaya Land And Estate Pvt LtdMonth after month builder is conventionality giving me a new refund date and then extending the date by one month. I request your intervention to get my money backAUTHORITY18/03/2025
Anjana Avinash Nair vs Sanchaya Land And Estate Pvt LtdRefund of full amount with compensationAUTHORITY18/03/2025
subhasish kundu vs Sanchaya Land And Estate Pvt LtdHANDOVER OF FLAT MAPLE C 809 WITH ALL AMENITIES AND PAYMENT OF PRE EMI WITH INTERESTAUTHORITY18/03/2025
Pinky Bhansali vs Sanchaya Land And Estate Pvt LtdReturn of the entire amount paid with interest till date for the said property.AUTHORITY18/03/2025
Poonam Tarun Mehta vs Sanchaya Land And Estate Pvt LtdReturn of the entire amount paid with interest till date for the said propertyAUTHORITY18/03/2025
Smitha S Jain vs Sanchaya Land And Estate Pvt LtdRefund of the entire amount paid with interest till date for the said property.AUTHORITY18/03/2025
Meghana Krishnan vs Sanchaya Land And Estate Pvt LtdRefund of the Entire amount paid with interest till date for the above mentioned PropertyAUTHORITY18/03/2025
Murali B Pillai vs Sanchaya Land And Estate Pvt LtdEnable registration through a transparent processAUTHORITY18/03/2025
AJIT KUMAR PATHAK vs Sanchaya Land And Estate Pvt LtdDirect the Respondents to refund to the Complainant a sum of Rs.18,14,318/- along with interest as applicable under the Act. Cost of ProceedingsAUTHORITY18/03/2025
Naveen P Naiker vs THE GREENS PHASE IREFUND OF TOTAL AMOUNT PAID INCLUDING INTEREST AND COMPENSATIONAUTHORITY16/11/2022
Pawan Verma vs M/s Sanchaya Land & Estate Pvt LtdReturn of the entire amount along with interest and exit from the project.AUTHORITY15/10/2022
Ashish Mohan vs Sanchaya Land And Estate Pvt LtdCompletion of the projectAUTHORITY13/07/2024
Vittal Dokre vs Sanchaya Land And Estate Pvt Ltd1. I would like to receive Rs 53.82/Sq. meter/Month amount from January 2015. 2. Pre_Emi Interest which the Builder has Defaulted. 3. I want RERA to instruct the Builder to complete project soon.AUTHORITY13/02/2025
Bhaskar Govindaswamy Naidu vs SANCHAYA LAND AND ESTATE PVT LTDHence for the bried facts mentioned above we are seeking for following relief: refund of pre emi as committed, delay compensation and interest on the advancemtn amount paidAUTHORITY12/07/2022
Raj A. Iype vs SANCHAYA LAND AND ESTATE PVT LTD1. Direct builder to complete the project and hand over the apartment. 2. Refund pending PRE-EMI of Rs. 2,11,200 along with interest until I get possession.AUTHORITY12/07/2022
S Arundathi MT vs SANCHAYA LAND AND ESTATE PVT LTDKindly seeking Hon’ble RERA K, Adjudicating Officer for Flat Completion, Handover & Compensations.AUTHORITY12/07/2022
K C RAGUANTHAN vs SANCHAYA LAND AND ESTATE PVT LTDDirect the Respondents to complete the project and hand over the apartment bearing NO.405 , Tower PINE E , in The Greens Phase I with all approval such as Completion Certificate, Occupancy CertificAUTHORITY11/07/2022
Vinaya Dalvi vs SANCHAYA LAND AND ESTATE PVT LTDHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicating OfficerAUTHORITY11/07/2022
ABHA SARAF vs Sanchaya Land And Estate Pvt Ltda) For payment of Compensation of Rs.107.64 per sq metre per month b) Delivery of flatAUTHORITY11/03/2025
NETRAVATI ANILKUMAR vs SANCHAYA LAND AND ESTATE PVT LTD.,Hence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicat-ing OfficerAUTHORITY05/03/2025
PRIYANKA NANNA vs SANCHAYA LAND AND ESTATE PVT LTD.,Hence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon’ble RERA K, Adjudicat-ing Officer:AUTHORITY05/03/2025
Anand Chagnraj Shrimal vs Sanchaya Land And Estate Pvt LtdRefund of the entire amount paid with interest till Date for the above mentioned Property.AUTHORITY02/04/2025
Alka Gupta vs SANCHAYA LAND AND ESTATE PVT LTDHence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon'ble Rera K,Adjudicating Officer : -AUTHORITY01/08/2022

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (135 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190522/0002133
22-05-2019
Complaint u/s 31 of the RERA Actskyview (another project by this promoter)DISPOSED AO
CMP/190522/0002152
22-05-2019
Variation in Sale Priceskyview (another project by this promoter)DISPOSED AO
CMP/190817/0002358
17-08-2019
Direct the Promoter to sell the Apartment at the rate as advertisedskyview (another project by this promoter)DISPOSED AO
CMP/190808/0002359
08-08-2019
Execute the agreement as per the Advertisement rateskyview (another project by this promoter)DISPOSED AO
CMP/190808/0002361
08-08-2019
Execute the agreement as per the advertisement rateskyview (another project by this promoter)DISPOSED AO
CMP/190522/0002363
22-05-2019
Direct the Promoter to sell the Apartment at rate as advertisedskyview (another project by this promoter)DISPOSED AO
CMP/190307/0002380
07-03-2019
Return of amount and CompensationTHE GREENS PHASE II (another project by this promoter)DISPOSED AO
CMP/190727/0003733
27-07-2019
Non delivery of apartmentTHE GREENS PHASE II (another project by this promoter)DISPOSED AO

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectMUNIRATHNAMMA-1998parvati nagar, laggere
ContractorM/S Bar Builder-2010Anekal Taluk, Bangalore.
Structural engineerHarikrishna Reddy---

Builder track record

RERA filing

Sanchaya Land has 3 other K-RERA-registered projects in our records. 2 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹14.2 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank RT Nagar (IFSC UTIB0000363, a/c …0050). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~16 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Electronic City16 km
Bellandur–Marathahalli belt25 km
Whitefield IT hub30 km
MG Road / city centre31 km
Outer Ring Road / Manyata38 km
Kempegowda Int'l Airport54 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sanchaya Land.
Sanchaya Land has 4 projects registered in Bangalore.

Other projects by this builder in Bangalore

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in THE Greens Phase I?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026