RERA Property Intelligence Report · Preview

VASUDHA PARKONE

vasudha projects · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/211202/004570

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

92
Registered units
₹20.0 Cr
Est. construction cost
Units profiled
44
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units92Total inventory registered with K-RERA.
Official carpet area1,958 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area4,681 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~1.74Sanctioned floor-area ratio (≈8,149 sqm sanctioned FAR area ÷ 4,681 sqm land) — higher means a denser vertical build.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed103 total (7 open) — 1.12 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date12-05-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK FLATS28100%1,958 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Vasudha Parkone392103-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 92 official flat/unit rows, matching the 92 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK6772.9-80.4 sqm47.6-52.5 sqm67
2BHK2572.8-72.9 sqm47.5-47.6 sqm25

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Vasudha Parkone9272.8-80.4 sqm47.5-52.5 sqm92
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
GF-001Vasudha Parkone03BHK78.5 sqm51.2 sqm1
GF-002Vasudha Parkone02BHK72.9 sqm47.6 sqm1
GF-003Vasudha Parkone03BHK80.4 sqm52.5 sqm1
GF-004Vasudha Parkone03BHK80.3 sqm52.4 sqm1
GF-005Vasudha Parkone02BHK72.9 sqm47.6 sqm1
GF-006Vasudha Parkone03BHK80.4 sqm52.5 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~839 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 92 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 103 parking spaces for 92 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~51 sqm per home; across all 92 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 37 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 17 Sep 2024, extended (an extension) to 17 Sep 2025 — both dates have passed with no OC on file. An extension application filed on 24 Sep 2024 is pending with K-RERA — until it is approved, the registration stands lapsed.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Architectmgk architects-2007no 3 lakshmi nivas apt, bda double road bsk 6 th satge
Structural engineerRAJU H G---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹21.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC JAYANAGAR-RVS PARADISE (IFSC HDFC0001226, a/c …4578). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~15 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
MG Road / city centre12 km
Electronic City15 km
Bellandur–Marathahalli belt17 km
Outer Ring Road / Manyata19 km
Whitefield IT hub24 km
Kempegowda Int'l Airport38 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Vasudha Projects.

Other RERA-registered projects in Subramanyapura

Major developers building in Subramanyapura

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Vasudha Parkone?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026