RERA Property Intelligence Report · Preview

ZED MANOR

ZED ENTERPRISES · · K-RERA PRM/KA/RERA/1268/378/PR/100726/008805

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

6
Registered units
₹7.1 Cr
Est. construction cost
Units profiled
22
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units6Total inventory registered with K-RERA.
Official carpet area1,105 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area1,172 sqmUseful scale context when comparing density and project cost.
Registered land area743 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.731Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed12 total (12 covered, 0 open) — 2.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberMYS-BL-07/2026-27,Use this to match the sanctioned drawing set shown by the builder.
Plan approval date04-06-2026
Project start date01-07-2026

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
4 BHK6100%1,105 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
ZED MANOR361211.45 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 6 official flat/unit rows, matching the 6 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
4 BHK6183.9-184.5 sqm113.5 sqm12

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
ZED MANOR6183.9-184.5 sqm113.5 sqm12
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
ZM 001ZED MANOR14 BHK184.5 sqm113.5 sqm2
ZM 002ZED MANOR14 BHK183.9 sqm113.5 sqm2
ZM 003ZED MANOR24 BHK184.5 sqm113.5 sqm2
ZM 004ZED MANOR24 BHK183.9 sqm113.5 sqm2
ZM 005ZED MANOR34 BHK184.5 sqm113.5 sqm2
ZM 006ZED MANOR34 BHK183.9 sqm113.5 sqm2

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,982 sqft — large, premium-format homes (4BHK/penthouse territory), not compact stock. This is a boutique, low-density project — 6 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 12 parking spaces for 6 homes (~2.0 per home) — comfortable headroom over the 1-per-home many projects offer.
Your land share (UDS)Undivided land share averages ~113 sqm per home; across all 6 homes that is ~92% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

7 of 20 compliance document slots are filed as Not Applicable; the remaining 13 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantA SUBRAMANYAM REDDY2144362009Bengaluru Urban, Karnataka - 560095
EngineerN SRIDHARAULR 18021AAAB08A008082026Bengaluru Urban, Karnataka - 560095
ArchitectABHISHEK TALUKDARCA/2019/1090452019Bengaluru Urban, Karnataka - 560095
ContractorZED ENTERPRISES-2023Bengaluru Urban, Karnataka - 560095

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹118.0 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~126 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Electronic City126 km
MG Road / city centre128 km
Bellandur–Marathahalli belt133 km
Outer Ring Road / Manyata134 km
Whitefield IT hub141 km
Kempegowda Int'l Airport152 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Zed Enterprises.

Other RERA-registered projects in Kengeri Satellite Town

Major developers building in Kengeri Satellite Town

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in ZED Manor?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026