Construction of Building No 04 consisting of single wing comprising of Stilt 5P 33 floors 128 Ts

PR1181012502963 · promoter Mumbai Housing And

Certificate SignedDue 31 Oct 2028

Delivery & Registration

MahaRERA registrationPR1181012502963
Registered on18 Mar 2026
Promoter-declared completion31 Oct 2028
Current statusCertificate Signed
Against today27 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Mumbai Housing And is the promoter of record on 64 projects, of which 4 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Sales & Inventory

Of 128 homes filed with MahaRERA, 0 are sold/booked and 128 remain available (~0% sold) — early in sales — more choice of units now, but confirm the developer has the pre-sales to fund the build. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+38 and 128 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
Building No. 04 consisting of single wing comprising of Stilt +5P+33 floors1G+38128-

Unit mix on the filing: 128 residential.

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

Location, Land & Connectivity

Located at CTS No. 183 (PT), 184 (Pt), 185 (Pt), 186 (Pt), 187 (Pt), 196 (Pt) and 201 (Pt), Andheri, Mumbai Suburban, 400066. Per the filed land record, the plot is bounded to the north by CTS No 201, to the south by Building No. 1 and Building No. 5 , to the east by 18.30 Meter wide existing DP road and to the west by 12.2 Meter wide existing Road. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~10 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Andheri MIDC / SEEPZ10 km
Powai / Hiranandani business park12 km
Chhatrapati Shivaji Int'l Airport15 km
Bandra Kurla Complex (BKC)17 km
Lower Parel / Worli business district25 km
Nariman Point / Fort33 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

Mumbai Housing And Area Development Board is the promoter on 9 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

See every Mumbai Housing And Area Development Board project & its RERA track record →

Other flagged projects by Mumbai Housing And Area Development Board

Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban

Other RERA-registered projects in Borivali East

Rushabh Apartment
possession by Jul 2026 · R R Builders
Rashmi Manorath
possession by Aug 2026 · Modi's Navnirman Limited
Proposed Redevelopment OF Prakashkunj Chsl
possession by Sep 2026 · Yash Realtors & Developers
Chandratej CHS LTD
possession by Oct 2026 · Elesh Ravjibhai Rathod
Eknath Gruh
possession by Oct 2026 · Vastav Developers PVT LTD
NEW Avanti Chsl
possession by Oct 2026 · Balaji Enterprises

Major developers building in Borivali East

Other RERA-registered projects in Mumbai Suburban

Construction Of Building No 32.shopping Center At Bimbisar Nagar ,W. E. Highway,goregaon East
declared completion Dec 2017 · Mumbai Housing AND Area Development Boar
Construction Of Ews,lig,mig-HIG T/s. On Open Plot-A And B S.no 29P CTS No50a Pahadi Goregaon Mumbai
declared completion Dec 2024 · Mumbai Housing AND Area Development Boar
Construction Of LIG And MIG Tenement At Virar Bolinj
declared completion Mar 2018 · Konkan Housing AND Area Development Boar
Construction Of MIG T/s On Open Plot On Land Bearing S.no.01 Pt. On CTS No. 1/3 Village Kopari Powai
declared completion Dec 2025 · Mhada
Constrution Of 24 LIG Ts On CTS No 356 P At Siddharth Nagar Goregaon West Mumbai 400062
declared completion Jun 2019 · Mumbai Housing AND Area Development Boar
Contendre Enclave
declared completion May 2026 · Contendre Infratech Pvt. Ltd.

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026