MahaRERA Property Intelligence · Mumbai Suburban

CONS OF MIG TS CTS 356 A KANNAMWAR NAGAR POCKET VIII BEARING S NO 113 PT

PM1181012503045 · kanamwar Nagar · promoter Mumbai Housing And

Certificate SignedDue 31 Dec 2032

Delivery & Registration

MahaRERA registrationPM1181012503045
Registered on25 Mar 2026
Promoter-declared completion31 Dec 2032
Current statusCertificate Signed
Against today77 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Mumbai Housing And is the promoter of record on 64 projects, of which 4 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Construction Progress

MahaRERA's cost filing puts construction at ~5.7% of the estimated project cost incurred as of the last certificate (₹2.52 Cr spent against a ₹44.35 Cr estimate). This financial % is the regulator's own proxy for how much is physically built — the closest public read on real progress, and one a brochure never shows.

Cost-incurred % as last certified to MahaRERA; it can lag on-site reality between filings. Confirm the current stage and the latest Form 2 before you book.

Sales & Inventory

Of 54 homes filed with MahaRERA, 0 are sold/booked and 54 remain available (~0% sold) — early in sales — more choice of units now, but confirm the developer has the pre-sales to fund the build. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+11 and 54 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
KANNAMWAR NAGAR, VIKHROLI ( POCKET-VIII) Building 11G+1154-

Unit mix on the filing: 43 residential and 11 non-residential (shops/offices).

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

Location, Land & Connectivity

Located at kanamwar Nagar, S. No.113(Pt), C.T.S. No 356 A/2 (pt), Andheri, Mumbai Suburban, 400083. Per the filed land record, the plot is bounded to the north by 9.15 Meter Wide existing Layout Road, to the south by 12.2 Meter Existing Road, to the east by Compound Wall and to the west by Compound Wall. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~4 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Powai / Hiranandani business park4 km
Andheri MIDC / SEEPZ7 km
Chhatrapati Shivaji Int'l Airport9 km
Bandra Kurla Complex (BKC)10 km
Lower Parel / Worli business district18 km
Nariman Point / Fort25 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

Mumbai Housing And Area Development Board is the promoter on 9 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

See every Mumbai Housing And Area Development Board project & its RERA track record →

Other flagged projects by Mumbai Housing And Area Development Board

Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban
Mumbai Housing And Area Development Board
FlaggedMumbai Suburban

Other RERA-registered projects in Vikhroli East

Shubh Elanza
possession by Aug 2026 · Shubh Vastu Lifespace LLP
Shree Balaji 7
possession by Sep 2026 · Saptrishi Landmarks LLP
Unique Enclave Residency
possession by Sep 2026 · Fazal Shaikh
Vrindavan Elite
possession by Oct 2026 · Matrix Constructions
Meadows 83
possession by Oct 2026 · Shreeji Realtors
BBJ Siena
possession by Dec 2026 · Geetai Developers Private Limited

Major developers building in Vikhroli East

Other RERA-registered projects in Mumbai Suburban

Const Of 1041 TR Ts 69 Shops 1950 EWS 224 MIG At Kannamwar Nagar Vikhroli East
declared completion Mar 2026 · Mhada
Const OF 586 EWS 234 MIG Tenaments ON Land Bearing CTS NO 1 C 1 1 Borivali West Mumbai 67
declared completion Dec 2017 · Maharashtra Housing AND Area Development
Constn Of 219 Ts And 172 MIG Ts On CTS No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai
declared completion Dec 2021 · Maharashtra Housing AND Area Development
Construcion Of 28 LIG Tenement On Plot OB 8,siddharth Nagar ,goregaon West,mumbai
declared completion Dec 2017 · Mumbai Housing AND Area Development Boar
Construction Of 232 LIG TS On S.no. 263 P C.t.s No. 3525p Nr Bus Depo Malwani Malad West Mumbai 95
declared completion Mar 2018 · Mumbai Housing AND Area Development Boar
Construction Of 406 TR TS 442 EWS 258 MIG TS At Gavanpada Mulund East Mumbai
declared completion Dec 2019 · Mhada

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026