MahaRERA Property Intelligence · Mumbai Suburban

Rustomjee Elements - Wing SC

P51800005738 · D.N. Nagar · promoter Rustomjee Realty Private

Certificate SignedDue 30 Dec 2022

Delivery & Registration

MahaRERA registrationP51800005738
Registered on11 Aug 2017
Promoter-declared completion30 Dec 2022
Current statusCertificate Signed
Against todayabout 43 months past the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Rustomjee Realty Private is the promoter of record on 2 projects, of which none currently carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+14.

BuildingWingsFloorsDeclared completion
IGNIS1G+1430 Jun 2021

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

Legal & Litigation

The promoter has declared 171 court cases on this project to MahaRERA. 20 are still pending. Litigation can cloud the land title or stall the build — have a lawyer pull the cause list for each and confirm whether it touches the title to your flat. This is declared by the promoter; there may be further cases not on the RERA record.

CourtCase no.YearStatus
High Court Bombay2622012Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay122013Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay13782011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay13792011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay13802011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay13812011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15802011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15812011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15822011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15832011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15842011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay15862011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay21642011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay19422011Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay1182014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
Hugh Court Bombay1192014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2652014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2922014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2782014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2912014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2932014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2442014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2802014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay3282014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2422014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay2232014Rustomjees Entitlement To Development Upheld Pending For Framing Of Issues
High Court Bombay4152014Pending For Framing Of Issues Will Be Subject To Order In Group Matter
High Court Bombay3942014Pending For Framing Of Issues Will Be Subject To Order In Group Matter
High Court Bombay1252018Pending Admission Order For Deposit Of Money Complied Approvals To Be Processed
High Court Bombay42852015Pending For Admission No Coercive Action Order Subsisting Chargesheet Filed Dropping Petitioners
High Court BombayPIL 892015Pending For Admission
High Court Bombay18162016Pending For Admission Iorder Directing Mcgm To Process Approvals Subsisting
High Court Bombay335 L2015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay162015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay382015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay52015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay22015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay72015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2242016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2412016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High School Bombay2342016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay672015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay712015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay3562015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2322016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay3602015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2332016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2292016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay262015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay332015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay102015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay392015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay312015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay362015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay302015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay32015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay212015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay92015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
National Consumer Commission New Delhi1762011Evidence Being Filed By Parties
National Consumer Commission New Delhi2532011Impleadment Of Rustomjee Pending
National Consumer Commission New Delhi1642011Impleadment Of Rustomjee Pending
National Consumer Commission New Delhi2852012Evidence Being Filed By The Parties
National Consumer Commission New Delhi2862012Evidence Being Filed By The Parties
National Consumer Commission New Delhi2872012Evidence Being Filed By The Parties
National Consumer Commission New Delhi2522017Lower Court Order Stayed And Pending For Final Hearing
National Consumer Commission New Delhi2532017Lower Court Order Stayed And Pending For Final Hearing
National Consumer Commission New Delhi2542017Lower Court Order Stayed And Pending For Final Hearing
National Consumer Commission New Delhi2552017Lower Court Order Stayed And Pending For Final Hearing
National Consumer Commission New Delhi2562017Lower Court Order Stayed And Pending For Final Hearing
State Consumer Forum Mumbai2062013Pending For Final Hearing
High Court Bombay2572015Pending For Final Hearing No Interim Relief Granted
High Court Bombay13642011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay14722011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay15172011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13622011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay6162011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7702011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court9432011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13512011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13532011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13542011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13552011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13762011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay13772011Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay322012Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court5952013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay5962013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay6992013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7702013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7712013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay6742013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay222013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay2302013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay4882013Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay1162014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay782014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay1012014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay2822014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay2792014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay4342014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay3222014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay3232014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay5762014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay4402014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7102014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7232014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay7092014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay2672014Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay5112015Rustomjees Entitlement To Redevelopment Upheld Pending For Framing Of Issues
High Court Bombay4142014Pending For Framing Issues Will Be Subject To Order In Group Matter
High Court Bombay2402016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2392016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2312016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2422016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2452016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay172015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay372015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay282015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay852015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2372016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay192015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay662015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay342015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay702015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2362016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2222016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay3622015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay4052015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay112015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay292015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay122015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay2282016Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay62015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
City Civil Court Dindoshi Mumbai10132012At The Stage Of Recording Evidence Of Plaintiff
City Civil Court Dindoshi Mumbai10142012At The Stage Of Recording Evidence Of Plaintiff
City Civil Court Dindoshi Mumbai10152012At The Stage Of Recording Evidence Of Plaintiff
City Civil Court Dindoshi Mumbai10162012At The Stage Of Recording Evidence Of Plaintiff
City Civil Court Dindoshi Mumbai34402013Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai34412013Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai25262012Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai18092007Evidence Completed Pending For Final Arguments
City Civil Court Dindoshi Mumbai19992013Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai20012013Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai20002013Issues Framed Awaiting Commencement Of Evidence
City Civil Court Dindoshi Mumbai8932017Notice Of Motion For Ad Interim Reliefs Pending
City Civil Court Mumbai22712012Pending For Framing Of Issues
High Court Bombay26042016Pending For Admission Tagged With Other Similar Matters
National Consumer Commission New Delhi3402017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3412017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3422017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3432017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3442017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3452017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3462017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi3472017At The Stage Of Service Of Appeal To All Parties
National Consumer Commission New Delhi2512017Lower Court Order Stayed Pending For Final Hearing
National Consumer Commission New Delhi2502017Lower Court Order Stayed Pending For Final Hearing
National Consumer Commission New Delhi2492017Lower Court Order Stayed And Pending For Final Hearing
State Consumer Forum Mumbai2072013Pending For Final Hearing
State Consumer Forum Mumbai4552013Pending For Final Hearing
District Consumer Forum Mumbai5482017Pending For Final Hearing
District Consumer Forum Mumbai5492011Pending For Final Hearing
District Consumer Forum Mumbai5502011Pending For Final Hearing
Cooperative Court No Iv Mumbai2082010At The Stage Of Filing Evidence
Cooperative Court No Iv Mumbai42008At The Stage Of Commencing Evidence
High Court Bombay30352017Pending Hearing For Admission
High Court Bombay232015Admitted Without Any Injunction Against Rustomjee And Awaiting Final Hearing
High Court Bombay25782017Pending For Compliance Of Decree
State Consumer Forum Mumbai12312016Pending For Interim Reliefs But Stayed By Ncc On Application By First Opponent
State Consumer Forum Mumbai12322016Pending For Interim Reliefs But Stayed By Ncc On Application By First Opponentapplication Pending
City Civil Court Dindoshi Mumbai14572008Application For Impleadment Of Rustomjee As A Party Pending

Deadline Extensions

The promoter has had the MahaRERA completion deadline formally extended 1 time. Each extension is the regulator letting the finish line move — the clearest evidence of delivery slippage, straight from the record.

From (declared)To (revised)Stated reason
30 Dec 202230 Jun 2022The promoter has completed around 91% work on the site. The project is mainly delayed due to delay in receiving approvals and inability to continue construction activities during p

Location, Land & Connectivity

Located at D.N. Nagar, D. N. Nagar, Andheri, Mumbai Suburban, 400053. Per the filed land record, the plot is bounded to the north by Latitude 19d07m08pt155s Longitude 72d49m46pt751s, to the south by Latitude 19d07m06pt781s Longitude 72d49m46pt327s, to the east by Latitude 19d07m06pt941s Longitude 72d49s46pt778s and to the west by Latitude 19d07m07pt733s Longitude 72d49m45pt472s. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~4 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Andheri MIDC / SEEPZ4 km
Chhatrapati Shivaji Int'l Airport5 km
Bandra Kurla Complex (BKC)7 km
Powai / Hiranandani business park8 km
Lower Parel / Worli business district14 km
Nariman Point / Fort22 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

Rustomjee Realty Private Limited is the promoter on 2 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

Other flagged projects by Rustomjee Realty Private Limited

Rustomjee Realty Private Limited
FlaggedMumbai Suburban

Other RERA-registered projects in Andheri West

Hubtown Premiere Residences - Bel Air
possession by Jul 2026 · Hubtown Limited
Morya Grand
possession by Jul 2026 · Nakta Investment Pvt. Ltd.
Umang Heights
possession by Aug 2026 · L K Infracon LLP
Royale
possession by Sep 2026 · Khoker Synergy Developers
Transcon Triumph Tower 3
possession by Sep 2026 · Transcon Triumph Phase 2 Private Limited
ARC ONE
possession by Dec 2026 · Chandra Gupta Estates Private Limited

Major developers building in Andheri West

Other RERA-registered projects in Mumbai Suburban

Rustomjee Elements - Wing SG
declared completion Dec 2018 · Rustomjee Realty Private Limited
Rustomjee Ocean Vista
possession by May 2029 · Keyspace Realtors Private Limited
Rustomjee Paramount - Wing C
declared completion Jun 2022 · Keystone Realtors Limited
Rustomjee Paramount - Wing D
declared completion Nov 2020 · Keystone Realtors Limited
Rustomjee Paramount - Wing E
declared completion Nov 2020 · Keystone Realtors Limited
Rustomjee Paramount - Wing F
declared completion Dec 2025 · Keystone Realtors Limited

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026