31 Mar 2025declared completionK-RERA registration · read 20 Sep 2026
450registered unitsK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Available record

No construction trend to plot.

The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.

declared completion

31 Mar 2025

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

Studio 1BHK 2BHK 3BHK
450

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

7.3registered acres

61.5registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/310/PR/200702/003480

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 March 2025
Land area29,592 sq m (7.3 acres)
Homes registered450
Tower/wing entries2
Unit mix450 × Studio 1BHK 2BHK 3BHK

In context

Density61.5 homes per acre
Density in context28th percentile of 787 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units450Total inventory registered with K-RERA.
Official carpet area27,664 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area29,592 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.31Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries2Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)440Separate filed counts; these categories may overlap and are not added together.
Open-parking field42Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date01-10-2020

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Studio 1BHK 2BHK 3BHK450100%27,664 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Wing C25210200-
Wing D26240240-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 450 official flat/unit rows, matching the 450 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK27659.2-64.9 sqm33.5-39.9 sqm276
3BHK12374.9-77.7 sqm41.8-44.3 sqm124
Studio5024.7 sqm13.5-13.7 sqm24 (26 with 0)
1BHK146.8 sqm27.9 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Wing D24024.7-77.2 sqm13.5-43.6 sqm225 (15 with 0)
Wing C21024.7-77.7 sqm13.5-44.3 sqm200 (11 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
C021Wing C22BHK62.2 sqm35.6 sqm1
C022Wing C23BHK76.3 sqm44.3 sqm1
C023Wing C23BHK77.7 sqm43.6 sqm1
C024Wing C22BHK61.1 sqm35.2 sqm1
C025Wing C22BHK61.5 sqm35.2 sqm1
C026Wing C2Studio24.7 sqm13.5 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

3 of 26 compliance document slots are filed as Not Applicable; the remaining 23 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Mar 2025, extended (an extension) to 31 Dec 2025 — both dates have passed with no OC on file. An extension application filed on 20 Mar 2025 is pending with K-RERA — until it is approved, the registration stands lapsed.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectKishore Panikkar-2008Villa B Sai Anugraha 27/1, Rukmani street extn Besant Nagar
Structural engineerArun Karanth N---

Builder track record

RERA filing

Apg Habitat has 3 other K-RERA-registered projects in our records (average reported construction progress 74%). 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹38.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Richmond Road (IFSC HDFC0000523, a/c …0052). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~4 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City4 km
Bellandur–Marathahalli belt9 km
MG Road / city centre12 km
Whitefield IT hub17 km
Outer Ring Road / Manyata19 km
Kempegowda Int'l Airport37 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Apg Habitat.
Apg Habitat has 4 projects registered in Bangalore.

Other projects by this builder in Bangalore

Assetz Canvas & Cove - Phase 1 Wing A & B
On track · 88% built · 99% sold
Assetz Canvas & Cove 2.0 - Block A
On track · 62% built · 97% sold
Assetz Canvas & Cove 2.0 – Block B & C
On track · 73% built · 86% sold

Other RERA-registered projects in Singasandra

Major developers building in Singasandra

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Canvas AND Cove Phase 1 Wing C AND D?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 20 Sep 2026