RERA Property Intelligence Report · Preview

GM GLOBAL TECHIES TOWN TOWER C

Gulam Mustafa Enterprises · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/170928/001289

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
3
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

1,416
Registered units
₹474.3 Cr
Est. construction cost
Units profiled
30
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units1,416Total inventory registered with K-RERA.
Registered land area33,404 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI3.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed1,596 total (187 open) — 1.13 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date18-02-2017

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
C311,4161,596-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 1,416 official flat/unit rows, matching the 1,416 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK95558.5-74.8 sqm16.7-21.4 sqm955
3BHK46197.5-113.8 sqm27.9-32.5 sqm461

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
C1,41658.5-113.8 sqm16.7-32.5 sqm1,416
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
C0101C03BHK97.5 sqm27.9 sqm1
C0102C02BHK74.8 sqm21.4 sqm1
C0103C02BHK74.8 sqm21.4 sqm1
C0104C02BHK74.8 sqm21.4 sqm1
C0105C02BHK74.8 sqm21.4 sqm1
C0106C03BHK97.5 sqm27.9 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~850 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 1416 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 1,596 parking spaces for 1,416 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~23 sqm per home; across all 1,416 homes that is ~96% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 25 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 18 Aug 2021, extended (Section 6 Extension) to 18 May 2023 — both dates have passed with no OC on file. The extension on file was granted on 07 Mar 2023 (K-RERA extension no. EX/PRM/KA/RERA/1251/308/PR/230307/001289) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (91 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Syed Irfan Ahmed vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDi am burden by paying EMI and rent together from past 1 year. now developer saying possession in march 2023, making delay of 2 years, I need compensation from developer as per RERA regulationAUTHORITY31/01/2024
JINKA ANIL KUMAR vs M/s.Gulam Mustafa Enterprises Pvt LtdCOMPENSATION FOR DELAYED PROJECT AND PAY THE INTREST WITH HIGH RATEAUTHORITY31/01/2024
PRANNAY SRIVASTAVA vs GM GLOBAL TECHIES TOWN TOWER CProject is delayed and according to Construction Agreement or Government Norms seeking help from RERA for Compensation.AUTHORITY30/08/2023
Abhinay Prakash Pandey vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDI would like RERA to interfere here and direct the builder to provide full refund inclusive of the interest paid and cancel the flat for the complainantAUTHORITY30/07/2025
POULAMI BASU vs M/S.GULAM MUSTFA ENTERPRISES PVT LTDNeed Help from RERA in recovering the refund from the builder.AUTHORITY30/07/2025
Saurabh Sharma vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDREFUND OF AMOUNT PAID ALONGWIYTH INTEREST @ 24%, AND LITIGATION EXPENSESAUTHORITY30/07/2025
SATISH HONMUTE vs M/s gulam Mustafa Enterprised Pvt Ltd.Refund of blocking amountAUTHORITY30/05/2026
L Ananth Narayan vs Gulam Mustafa Enterprises Pvt LtdInterest on delay periodAUTHORITY30/03/2026
Mohan N V vs M/S.GULAM MUSTAFA ENTERPRISESQuick delivery of flat, Interest on delay period of Rs.9,66,563 (Calculated until 14-03-2025), and legal fee refund of Rs.1,15,000AUTHORITY29/06/2026
MR JAIKRISHNAN vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDSpeedy completion of the project and Compensation for the delays as per the agreementAUTHORITY28/02/2025
manas sikdar vs gm global techies town tower cRERA Order to Builder on the Delays and compensationsAUTHORITY27/02/2024
birendra kumar sahu vs gulam mustafa enterprisesBuilder should pay the delayed compensation immediately and start paying the compensation on a monthly basis.Builder should complete project within reasonable time with all promised amenities.AUTHORITY27/02/2024
SURYA KUMAR S vs GM GLOBAL TECHIES TOWN TOWER CCompensation for the delay of flat; along with the rental amount we are paying.AUTHORITY26/09/2023
RAMAWATI DEVI vs GM GLOBAL TECHIES TOWN TOWER CRERA ORDER BUILDER FOR DELAY COMPENSATIONAUTHORITY25/04/2024
BHAGYASHREE SURYAVANSHI vs GM GLOBAL TECHIES TOWN TOWER CRERA must ask builder for possesion date and compensation for delay.AUTHORITY25/04/2024
VARUN NIMBALAL vs G M GLOBAL TECHIES TOWNI must get the respective compensation for the delayed period and make sure that Builder must be completing and giving possession as early as possibleAUTHORITY25/03/2025
TUHIN BHOWMIC vs GM GLOBAL TCHIES TOWN TOWER CRERA should order builder to pay compensation for delaying the project handover.AUTHORITY23/08/2023
INDRANIL SEN vs GULAM MUSTAFA ENTERPRISESCompensation from builderAUTHORITY23/08/2023
RIJAS P K vs GULAM MUSTAFA ENTERPRISES PVT LTDProject has been delayed from May 2022 and need help from RERA to get delay compensation as per agreement until delivery .AUTHORITY23/08/2023
SAI JAI GANESH GURUBARAN vs GM GLOBAL TECHIES TOWN TOWER CRERA order to the builder to compensate for the delay as per the provisions outlined.AUTHORITY23/05/2024
DARSHAN GOPAL R vs GM GLOBAL TECHIES TOWN TOWER CCompensation to be given until possession of apartment is given.AUTHORITY23/04/2024
UPAMANYA MODAK vs GM GLOBAL TECHIES TOWN TOWER CCompensation full AmountAUTHORITY23/04/2024
PRIYANKA KUMARI & SHAILENDRA KUMAR vs GULAM MUSTAFA ENTERPRISESRERA ORDER TO THE BUILDER FOR DELAY COMPESATIONAUTHORITY23/04/2024
SUMITH SINGH vs GM GLOBAL TECHIES TOWN TOWER CI am seeking compensation from builder as they failed to deliver by the date they promised and also failed to deliver by the extension RERA provided.AUTHORITY23/04/2024
K PRADEEP KUMAR REDDY & MEGHA V S vs GM GLOBAL TECHIES TOWN TOWER-CRERA ODER TO THE BUILD FOR DELAY COMPENSATION TILL I GET POSSESSION OF THE FLATAUTHORITY22/08/2023
Arindam Dhar vs GULAM MUSTAFA ENTERPIRSES PVT LTDRefund of entire sale consideration of Rs.67,16,985/- with interest @ 18 % P.A, & Grant such other relief if any, as this authority deems fit in the interest of justice and equityAUTHORITY22/07/2025
Soumendra Kumar Dash vs GM GLOBAL TECHIES TOWN TOWER CI want the interest amount from the builder on delay period till possession of my Flat.AUTHORITY21/07/2025
Mahesh M Pai vs GM GLOBAL TECHIES TOWN TOWER C1. Compensation and handover of GTT Tower C with committed quality along with agreed amenities 2. Compensation for delay (Paid in monthly until builder provides the possession)AUTHORITY20/09/2023
ARINDAM DHAR AND NEHA PUROHIT vs GM GLOBAL TECHIES TOWN TOWER-CReturn of amount and compensationAUTHORITY20/02/2024
RISHABH TAKA vs GM GLOBAL TECHIES TOWN TOWER C1. Monthly compensation to me @9.5% on the amount paid by me to the builder for delay beyond 18-05-2022. 2. In case the penalty is not paid monthly, the interest should start compounding monthly.AUTHORITY20/02/2024
RITIKA MAHESHWARI vs GM GLOBAL TECXHIES TOWN TOWER CCompensation & possession of flat at the earliest.AUTHORITY20/02/2024
SUDIPTA MAJUMDAR vs GM GLOBAL TECHIES TOWN TOWER AHandover of the flats along with compensation mentioned in the sale and construction agreement.AUTHORITY18/06/2024
SIBANI ROUT vs GM GLOBAL TECHIES TOWN TOWER CCompensation for the delay in handover + Handover of Apt C2017AUTHORITY18/06/2024
Neeraj Lohia vs M/S.GULAM MUSTAFAKindly help me getting the refund of the advances paidAUTHORITY17/02/2026
Sravya Bommakanti vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDI urge RERA to direct the developer to complete my flat registration immediately and pay the interest on delay period and keep me updated of my complaint's statusAUTHORITY16/08/2025
B Varadaraj vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDRefund of booking amount with interestAUTHORITY16/06/2025
SHASHI KANT VERMA vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDKindly order the builder for delay compensation.AUTHORITY16/01/2024
BHASKAR BHARDWAJ vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDPlease instruct to builder for timely deliver of project and also ask them to compensate their customersAUTHORITY16/01/2024
RAVISH TAK vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDRERA should take a concern of completion of the project with Full COMPENSATION on the delayAUTHORITY16/01/2024
NIRANJAN ANIRUDHA VILADKAR vs GM GLOBAL TECHIES TOWN TOWER CKindly order the builder to pay delay compensation as per the agreement beginning May 2022AUTHORITY14/06/2024
ABHISHEK S vs GM GLOBAL TECHIES TOWN TOWER CNeed compensation from the builder for my lossesAUTHORITY14/06/2024
NIHAR RANJAN vs COLUMBIA INFRA HOLDINGSRERA ORDER BUILDER FOR DELAY COMPENSATIONAUTHORITY14/02/2024
DEEPIKA JAIN vs GULAM MUSTAFA ENTERPRISES PRIVATE LIMITED PATEL ENGINEERING LIMITEDGet the possession date from builder with proper compensation from builderAUTHORITY13/11/2023
RAKESH RANJAN vs GM GLOBAL TECHIES TOWN TOWER CRequesting you to kindly help us get possession with delay compensation to incur the rent paid as per the provision of K-RERAAUTHORITY13/01/2025
bibash saha vs gm global technies town tower cRERA Order to the Builder for delay Compensation and hand over the flat as soon as possibleAUTHORITY12/12/2023
arun kumar ps vs gm global techies town towe CNeed delay compensation from the RERA completion date to till the time handover as per Rera rulesAUTHORITY12/12/2023
Akshita Monga vs GULAM MUSTAFA ENTERPRISES PVT LTDPlease help in getting our refund on priority.AUTHORITY12/05/2025
Sangram Keshari Satapathy vs gm global techies town tower cinterest on delay periodAUTHORITY11/07/2025
manab mitra and rupsa mitra vs gulam mustafaHandover of the flats along with compensation mentioned in the sale and construction agreement.AUTHORITY11/07/2024
ROHITH G vs GM GLOBAL TECHIES TOWN TOWER ACANCELLATION OF SALE AGREEMENT, COMPENSATION & REFUND.AUTHORITY11/06/2025
manish kumar singh vs gm global techies town tower cRERA to order for delay compensation( interest part of the amount disbursed i am paying to bank) or full refund with interest if project is not completed.AUTHORITY10/09/2024
KAUSTAV BISWAS vs GM GLOBAL TECHIES TOWN TOWER CRera order to the builder for compensation and immediate possessionAUTHORITY09/05/2024
Satendra Kumar Musla vs GULAM MUSTAFARefund of full amount paid including Sale Amount, registration & Legal & TDS charges, Interest & penalties, Legal action and removal of any unauthorised case on us for this wrong property registrationAUTHORITY09/03/2026
CAPACITE INFRAPROJECTS LIMITED vs M/s.Gulam Mustafa Enterprises Pvt LtdDirections from Hon'ble authority for registration deeds of conveyance in relation to the 24 Units/Apartments listed in Table .Deliver possession of the 24 Units/Apartments listed in TableAUTHORITY09/01/2026
ABHRAJYOTHI SEN vs GM GLOBAL TECHNIES TOWN TOWER CRefund of Rs - 6,15,000 in case they dont provide me the legal documents for verification and if they found not in line with govt. approvals and exit from the projectAUTHORITY09/01/2024
Kurinji Meenakshi D vs gulam mustafa enterprises pvt ltd1. Request Hon KA RERA to direct the respondent cancel the allotment and immediately refund the entire amount with interest (MCLR+2%) .AUTHORITY07/07/2025
MR.TULU BAIDYA vs M/S.GULAM MUSTAFA ENTERPRISES AND ANOTHERRefund of Booking amount on cancelationAUTHORITY07/03/2025
MR NILESH PAWATE vs M/S.GULAM MUSTAFA ENTERPRISESI request a full refund of the booking amount with compensation and interestAUTHORITY07/03/2025
ARINDAM DHAR vs GM GLOBAL TECHIES TOWN TOWER-CProject completion , delivery of flat and compensation for bank interest and delayAUTHORITY07/03/2024
MR.JESWIN VARGHESE vs M/S.Gulm Mustafa Enterprises, BangaloreRequest RERA to intervene and return our booking amount of 2 lakhs as this project is blacklisted by all the major banks in Sep 2022AUTHORITY05/06/2024
Ajesh Janardhan Nambiar vs gm global techies town tower cIt is very difficult to bear burden of Rent & EMI hence seeking your assistance to get following 2 items completed 1) To complete project at earliest with committed quality 2) Compensation for delay.AUTHORITY05/03/2025
Aditya Singh vs M/s.Gulam Mustafa EnterprsesI need delay compensation from builder for delayed period of time between date promised on rera and when they will handoverAUTHORITY05/02/2026
MR RAJAT SAXENA vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTD.Order the builder to pay me compensation at the rate of 2% more than the bank interest rates, at monthly frequency, as soon as possible. This is to be continued until possession is not provided.AUTHORITY05/01/2024
MR SHIVAKUMAR KOLAGAD vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDLooking for big compensation and immediate possession of my flat C1607 Tower C. RERA should monitor these projects regularly.AUTHORITY05/01/2024
MR AMIT SEN vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTD & OTHERSRequest for Refund of total amount paid with interestAUTHORITY05/01/2024
MR MANAS RANJAN MOHAPATRA & ANOTHER vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDI want my amount should be refunded and settlement of home loan asapAUTHORITY05/01/2024
SOORAJ K V vs GULAM MUSTAFA ENTERPRISES PVT LTDNeed your kind intervention on delay compensation and to make sure project completion at the earliestAUTHORITY04/09/2023
PRAMIT SEN vs GM GLOBAL TECHIES TOWN TOWER CNeed Compensation for the delay constructionAUTHORITY04/09/2023
Kiran M Vijay & Padmavathi H S vs Gulam Mustafa Enterprises Pvt.Ltd.,It is a RERA registered project. So, I request the concerned authorities to take strict action against the builder and force GM builder to provide interest on delay period.AUTHORITY04/08/2025
Ranganayakulu Neppalli vs GM GLOBAL TECHIES TOWN TOWER CRequesting RERA to help us get our money back (Rs.11,25,000) and compensation as soon as possible.AUTHORITY04/08/2025
Rajat Saxena vs M/s.Gulam Mustafa Enterprises Pvt LtdExecution of Sale Deed, Completion of Unit, Transfer of Ownership (Khata)AUTHORITY03/06/2026
SIDDHARTH DAS vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.BUILDER TO PROVIDE MONETARY COMPENSATIONAUTHORITY03/06/2025
NIDHIN KRISHNAN B vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.1)Completion & handover of GTT Tower C with committed quality along with amenities. 2) Compensation for the delay.AUTHORITY03/06/2025
Prabin vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.compensation for the delayAUTHORITY03/06/2025
Azhar Ajaz vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.I want to transfer my agreement to the third party. as soon as possible.AUTHORITY03/06/2025
Mrs Chitra Rajendra Ghatnatti vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.Want RERA to instruct GM to provide delay compensation till property registration date.AUTHORITY03/06/2025
Sri Harsha Ravi vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.Please help us in getting the delayed compensation amount from the builderAUTHORITY03/06/2025
Anupam Das vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD. CMP NO.870RERA order to Builder for Delay compensation and Delivery of FlatAUTHORITY03/06/2025
SUBRAT BORDOLOI vs M/S.GULAM MUSTAFA ENTERPRISES PVT LTDRERA Order to builder to start paying compensation to customer for delayed project and complete the project in next 4-5 monthsAUTHORITY03/06/2025
Satya Narayan Mohapatra vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.Help me get the proper compensation here since the project is delayed or help me cancel the flat and get full refundAUTHORITY03/06/2025
Amit Gupta vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.RERA SHOULD ORDER TO THE BUILDER TO PROVIDE COMPENSATION TILL I GET POSSESSION OF MY FLAT. ALSO THEY SHOULD STRICTLY ORDER TO COMPLETE THE PROJECT ASAP AS PER RERA GUIDELINESAUTHORITY03/06/2025
Cibin Varghese vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.RERA to intervene here, to order the builder for delay compensation.AUTHORITY03/06/2025
Ravi Prakash vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.We are looking for the refund of token money, which they had taken by giving the false promise of national bank loan of 90%AUTHORITY03/06/2025
Aman Kumar Chaudhary vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.I WANT THE INTEREST AMOUNT FROM THE BUILDER ON DELAY PERIOD TILL POSSESSION OF MY FLAT.AUTHORITY03/06/2025
Sumeet Kumar Chaudhary & Tanisha Tomar vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.Please get our booking amount refunded. We will be highly gratefulAUTHORITY03/06/2025
Nirbhan Singh vs M/s.GULAM MUSTFA ENTERPRISES PVT LTD.I need my booking amount refund with interest and penalty to the builder.AUTHORITY03/06/2025
SANDO STELLANCE vs M/s.Gulam Mustafa Enterprises Pvt Ltdcompletion of the project & interest on delay in possesion of apartment (ie period from 2019 till possesionAUTHORITY03/06/2025
Sri Ratna Manoj Pullipudi vs GM GLOBAL TECHIES TOWN TOWER CHandover of the project and compensation for delay to the buyersAUTHORITY03/04/2024
PRINCE vs GM GLOBAL TECHIES TOWN TOWER CRERA ORDER BUILDER FOR COMPENSATIONAUTHORITY03/04/2024
DOLLY SUSAMMA KOSHY vs GM GLOBAL TEHIES TOWN TOWER CAll of us need a project timeline for completion or need to be paid compensation for delay.AUTHORITY02/06/2025
ANSHUMAN PRAKASH vs M/S.GULAM MUSTAFA ENTERPRISES1) Intervention needed to ensure that the project is completed as soon as possible and handover is given 2) Need the delayed compensation as per the agreement and RERA guidelinesAUTHORITY02/05/2025

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (74 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190218/0002184
18-02-2019
Amount to be refunded due to non compliance of wordsGM GLOBAL TECHIES TOWN TOWER CDISPOSED AO
CMP/191221/0003014
21-12-2019
Flat given to different customer without notice and taking booking installment with fake promisesGM GLOBAL TECHIES TOWN TOWER- A (another project by this promoter)DISPOSED AO
CMP/220811/0009877
11-08-2022
Delay in HandoverGM GLOBAL TECHIES TOWN TOWER CDISPOSED AO
CMP/191020/0004270
20-10-2019
Cheat / Fraud by GM Infinite - BangaloreGM GLOBAL TECHIES TOWN TOWER- A (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/220111/0008775
11-01-2022
Project is stalled, looking for immediate possession of FlatGM ELEGANCE TOWER-1 (E-12) (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/210826/0008274
26-08-2021
Request for Refund of Amount paid with InterestGM ELEGANCE TOWER-1 (E-12) (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/211113/0008552
13-11-2021
Refund not done for blocking amount after cancellationGM GLOBAL TECHIES TOWN TOWER CDISPOSED AUTHORITY BENCH4
CMP/220307/0009082
07-03-2022
Builder is not refunding down payment or Bank loan partial disbursement amountGM ELEGANCE TOWER-1 (E-12) (another project by this promoter)DISPOSED AUTHORITY BENCH5

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectMr.Jayaprakash Narayan-20022nd Cross, koramangala
Structural engineerMr. B.E. Pruthviraja---

Builder track record

RERA filing

Gulam Mustafa has 3 other K-RERA-registered projects in our records. 2 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹33.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC BTM Layout (IFSC HDFC0000885, a/c …1174). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~3 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Electronic City3 km
Bellandur–Marathahalli belt13 km
MG Road / city centre18 km
Whitefield IT hub19 km
Outer Ring Road / Manyata25 km
Kempegowda Int'l Airport42 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Gulam Mustafa.
Gulam Mustafa has 4 projects registered in Bangalore.
3 complaints on the K-RERA register against Gulam Mustafa in Bangalore.

Other projects by this builder in Bangalore

GM Global Techies Town Tower- A
No filings
GM Global Techies Town Tower-B
No filings

Other RERA-registered projects in Electronic City

Major developers building in Electronic City

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.