RERA Property Intelligence Report · Preview

SHRIRAM SUMMITT

P. Badarinath · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/180131/001789

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

26
Registered units
Est. construction cost
Units profiled
17
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units26Total inventory registered with K-RERA.
Official carpet area2,238 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area1,300 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~98.31Sanctioned floor-area ratio (≈127,799 sqm sanctioned FAR area ÷ 1,300 sqm land) — higher means a denser vertical build.
Registered towers/wings14Official tower/wing count in the K-RERA detail page.
Parking disclosed26 total (5 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date02-07-2014

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
APARTMENTS26100%2,238 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
21311-
41311-
51322-
61311-
71311-
81311-
91322-
101333-

Showing first 8 of 14 tower/wing rows.

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 26 official flat/unit rows, matching the 26 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK777.2-87.4 sqm0.1-0.1 sqm7
3 BHK796.8-110.2 sqm0.1-0.1 sqm7
2.5 BHK589.7-93.4 sqm0.1 sqm5
1 BHK349.5-50.9 sqm0.1 sqm3
2BHK382.3-87.4 sqm0.1 sqm3
3BHK1110.2 sqm0.1 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
12477.8-98.9 sqm0.1-0.1 sqm4
10377.2-93.4 sqm0.1-0.1 sqm3
16396.8-100.2 sqm0.1 sqm3
11249.5-77.8 sqm0.1-0.1 sqm2
13250.6-79.5 sqm0.1-0.1 sqm2
17250.9-79.5 sqm0.1-0.1 sqm2
5277.2-93.4 sqm0.1-0.1 sqm2
9287.4-91.8 sqm0.1 sqm2
151100.1 sqm0.1 sqm1
21110.2 sqm0.1 sqm1
4187.4 sqm0.1 sqm1
6187.4 sqm0.1 sqm1

Showing first 12 of 14 tower/wing groups.

Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
02.09.04283BHK110.2 sqm0.1 sqm1
04.08.04472BHK87.4 sqm0.1 sqm1
05.03.03522.5 BHK93.4 sqm0.1 sqm1
05.05.01542 BHK77.2 sqm0.1 sqm1
06.03.03622BHK87.4 sqm0.1 sqm1
07.04.03732BHK82.3 sqm0.1 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~927 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 26 homes across 14 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 26 parking spaces for 26 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~0 sqm per home; across all 26 homes that is ~0% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

2 of 13 compliance document slots are filed as Not Applicable; the remaining 11 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2019 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (69 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Hari Krishnan C P vs Shriram SummittPhysical Possession , OC & Delay CompensationAUTHORITY31/01/2024
Mrinal Kanti Das vs Shriram SummittCompensation for the delay of possession and mental trauma faced by myself and my family.AUTHORITY31/01/2024
Rajkumar Sanajaoba Singh vs Shriram Properties Pvt. Ltd.Need Compensation of the delayAUTHORITY31/01/2024
Debashish vs Shriram SummittDirect Builder for Delayed Compensation, Respective pending interest and GST credit to be passed on to customer effective 1-Jan -2020AUTHORITY31/01/2024
ABHISHEK SAINI vs SHRIRAM SUMMITTCompensation on Account of Delay in PossessionAUTHORITY31/01/2023
SANTOSH SUBBARAO vs SHRIPROPR DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTDRequest to provide the delay compensation by the builder (SHRIRAM PROPERTIES)AUTHORITY30/12/2022
Hitesh Ray & Manisha Saxena vs M/s Shriram Properties Private LimitedCOMPENSATION AMOUNT (MCLR+2%) TO BE PAID INCLUDING DUE INTEREST FOR THE DELAYED PERIOD WITH IMMEDIATE EFFECT AS OF TODAYAUTHORITY30/09/2024
Madhu Sudhan Ravindran vs SHRIRAM PROPERTIES PRIVATE LIMITEDComplainant prays for monetary interest on delay period, and breach of agreement as per applicable RERA provisionsAUTHORITY30/06/2026
MR SANDEEP DUBEY AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERCancellation of Sale Deed and full refund with interest & Penality.AUTHORITY29/09/2023
Harish Kasiviswanathan vs SHRIRAM PROPERTIES PVT LTD; SHRIPROP DWELLERS PRIVATE LTDTo Provide Delay compensation as per agreement with builder till OCAUTHORITY29/08/2024
Praveen K Vijayan & Shabna CK vs SHRIRAM PROPERTIES PVT LTD, SHRIRAM PROPERTIES PVT LTD(1) Compensation for delay in delivery of flat and (2) Waiver of payment delay fee charged by the builderAUTHORITY28/11/2024
VARUN KUMAR & VEENA RAI vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDComplainant has already paid more than 7 lakhs of interest Property: Flat no. 21:03:02, Shriram Summit, Electronic City, Bangalore. Request you to provide compensation as per agreement.AUTHORITY28/10/2022
PRAKASH SUNDARAM vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDImmediate Intervention and Provide relief in terms of compensation and project completion/delivery dateAUTHORITY28/10/2022
PROUT CHAKMA vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDSeeking Delay compensation until registrationAUTHORITY28/10/2022
Amit Kumar Singh vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PVT LTDThe complainant has already paid around 90% of total flat amount of Flat no. 19.08.03, Shriram Summit, Electronic City. Looking for the compensation as per the agreement from the builder.AUTHORITY28/10/2022
BISWADIP CHAKRABORTY & SANTU SAIKIA vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PVT LTDAssist us in getting compensation from Shriram on losses we made due to delay in apartment handoverAUTHORITY28/10/2022
MS SINDHU VIDYASAGAR vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERCompensation & fasttrack project delivery from Shriram. Assure no more payment demands from Shriram until compensation terms are mutually agreedAUTHORITY28/07/2023
Girish Wali vs SHRIRAM PROPERTIES PRIVATE LIMITEDRefund the Amount along with InterestAUTHORITY25/10/2022
Pallav Das vs Shriram Summit1) I am paying Pre EMIs to the bank every month from last 2 years and not sure how i need to pay. So, i need a compensation of the interest i have paid to the bank and 6% extra GST refundAUTHORITY25/01/2024
HITESH RAY vs SHRIRAM SUMMITTWant to settled my delay compensation as per Sales Agreement.AUTHORITY24/05/2023
MR.PRATHAMESH PRAKASH KARMALKAR & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERCompensationAUTHORITY23/07/2026
MR PULKIT NAGPAL vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERSir, I am looking to withdraw from the project and get refund with interest applicable per RERAAUTHORITY22/07/2023
MR ARUN KUMAR TIWARI vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERBank loan interest & other compensation till receipt of OC & GST to be calculated at 5% & access GST amount already charged is refunded to me or adjusted with my disbursements.AUTHORITY22/07/2023
President, Shriram Summitt Apartment Owners Welfare Association vs M/S.SHRIRAM PROPERTIES PVT LTDDirect SPL to immediately release the 92 lakh INR balance corpus with accrued interest and, within 15 days, file complete audited corpus/maintenance accounts and all pending hand-over documentsAUTHORITY22/04/2026
SUDHIR KUMAR vs SHRIRAM PROPERTIES PRIVATE LIMITED & ANOTHERCompensation as per agreed in the sale agreementAUTHORITY22/02/2024
Darshan Gopal Bhatt & Leelavathi G Bhatt vs M/s Shriram Properties Ltd & Shriprop Dwellers Pvt LtdDelay CompensationAUTHORITY21/08/2024
Karthik Desh Kulkarni vs M/S. SHRIRAM PROPERTIES PVT LTD; M/S. SHRIPROP DWELLERS PRIVATE LTDDelay Compensation from the builder as per the RERA terms and conditions from 31-Dec-2019 till Occupancy Certificate is receivedAUTHORITY21/08/2023
MR RAJIV KUMAR SINGH vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHEREMI, Rent and No tax relief has broke my financial and mentally condition. I want mine Compensation be paid as soon as possible as per signed agreement.( MCLR+2% from 1st Jan2020 onwards).AUTHORITY19/10/2023
Adarsha Sachan & Kavita Kumari vs SHRIRAM PROPERTIES PVT LTD; SHRIPROP DWELLERS PVT LTDRequest for Delay compensation on account of delayed possession by builder for Property: Flat no. 21:11:02, Shriram Summit, Electronic City, Bangalore.AUTHORITY18/09/2024
Venkata N R Chinnam & Jayasree D Chinnam vs M/s Shriram Properties Pvt LtdRemaining compensation of Rs.1,22,260.00 plus interest at government rate calculated from handover notification date of 31st Jan, 2019 till date on which remaining to be paid by the builder.AUTHORITY18/09/2024
MR SABYASACHI MAITY & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERPre-EMI Interest refund, Delay compensation, No more demand notes to be raised by builderAUTHORITY17/08/2023
Vishal Kumar Pandey vs SHRIRAM PROPERTIES PVT LTDI humbly pray that this Hon’ble Court may be please allow the complaint and direct the opposite party to provide the delayed period compensation for entire delayed period in the interest of justice.AUTHORITY17/08/2023
MR CHETAN SONWALKAR vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay compensation as per agreement with interest and also updates on the project status to be updated to RERA. And we need actual planned completion date of the project.AUTHORITY17/07/2023
MR KUNAL PRIYADARSHI & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay and other compensation till receipt of OCAUTHORITY17/07/2023
MS.SUMAN SEKHAR BEHERA & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay and other compensation till receipt of OC.AUTHORITY17/07/2023
MR SACHIN SHARMA vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERHelp in getting the flat with full amenities/facilities and compensation for delay and not providing amenities/facilities as per registered and legally signed agreementAUTHORITY17/07/2023
MS SONI KUMARI & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERHandover of the project with delayed compensationAUTHORITY17/07/2023
MR NISHANT & MS.KUMARI SWETA vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERI am in huge financial loss due to builder false promises and incompetency in project execution. Compensation amount (MCLR+2%) to be paid including due interest for the delayed period with immediatelyAUTHORITY17/07/2023
MR SANDEEP VAMAN PALEKAR AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD AND ANOTHERInterest on delay period for 2years 7months as per SALE AgreementAUTHORITY17/01/2025
Damodar Mishra & Monica Mishra vs 1) SHRIRAM PROPERTIES PRIVATE LIMITED; (2) SHRIPROP DWELLERS PRIVATE LTDProper compensation for the delay in handover of the apartmentAUTHORITY13/11/2024
Tanmay Dayma & Akanksha Dayma vs SHRIPROP DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTDWe anticipate that RERA will step in and provide compensation from the builder.AUTHORITY13/08/2024
Ruchee & Prithvi Anand vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDSincere appeal to RERA authorities to please grant us the project delay compensation as per the lawfully abided signed sale agreement clause and the delivery of flat:20.05.02AUTHORITY13/08/2024
Mohammed Ameen Makkadayil & Anooja P vs SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTDCompensation for the delayAUTHORITY13/08/2024
Samsheer Nalakath Valappil & Ramisha Samsheer vs Shriram Properties Private LimitedI request honorable rera authority to please provide delay period compensation for the delayed period from Dec 2019 to July 2022AUTHORITY13/08/2024
ASHISH MANOJ MHETAR vs SHRIRAM PROPERTIES PRIVATE LIMITEDRespective Compensation from Builder for the Delay as per RERA normsAUTHORITY13/08/2022
AJAY KRISHNA KALANGI vs SHRIRAM PROPERTIES PRIVATE LIMITEDGST refund, Delay compensation, No more demand notes to be raised by builderAUTHORITY13/08/2022
MR SAMIT KUMAR PAL vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERFull Compensation or Full Ret. with interest immedAUTHORITY13/07/2023
MR SRIRAM.S. vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERRight Penal Compensation due to delay, Timely Delivery of Flat with all the Amenities without compromising on QualityAUTHORITY13/07/2023
Shivendra Pratap Singh & Madhu Singh vs Shriram Properties Pvt Ltd & Shriprop Dwellers Pvt LtdCompensation for Delayed period to be provided to buyer of Apartment 21.12.04 at SHRIRAM PROPERTIES PRIVATE LIMITED Registration Number : PRM/KA/RERA/1251/308/PR/ from Builder ( Period 2019 to 2022 )AUTHORITY13/05/2024
MANINDRA NATH JHA & SANJUKTA JHA vs M/S SHRIRAM PROPERTIES PVT LTDDelay Penalty and Interest paid to the bank against the loan amount for the delayed period.AUTHORITY12/12/2024
SHAILENDRA DHARNE vs SHRIRAM PROPERTIES PRIVATE LIMITEDHelp getting compensation due to delay in handing over the flat as per registered and legally signed documentAUTHORITY12/03/2024
V Saraswathi Gowda vs M/S SHRIRAM PROPERTIES PRIVATE LIMITEDQuash/Set aside the Demand Notice dated 31.03.2023 and ordder the Respondent to Complete the Construction of the Apartment booked by her.AUTHORITY12/01/2024
MR.VINESH.K vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERcompensation on 2 grounds: 1) the total PRE Emi I have been paying since Oct 2019 till hand over of flat to be returned to me(as per the subvention scheme) 2) compensation for delay in handoverAUTHORITY11/10/2023
B.RAJKUMAR vs SHRIRAM PROPERTIES PVT LTDI am requesting RERA committee to order the builder to release the compensation amount for the principal money which I paid with the interest rate of bank MCLR rate plus 2% as per agreementAUTHORITY10/10/2023
YUDHISH GUPTA vs SHRIRAM PROPERTIESDelay compensation with interest and Rent paid for 2 years due to delayAUTHORITY08/09/2023
Siddharth Sinha vs shriram properties pvt ltdto direct the Respondent to cancel allocation of Apartment, Agreement of Sale, refund Booking Amount with Interest and foreclose loan with costs.AUTHORITY07/02/2023
MR.AMOL GOKUL ANANPARA vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERFull Compensation or Full Return asap or today.AUTHORITY06/09/2023
MR SUDHANSHU DWIVEDI vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERTake an action on builder to pay delayed compensation or Bank Interest payout until Possession.AUTHORITY06/09/2023
MR.SUMIT MATOO AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD.Expecting RERA to help us in this situation and get our flats and due compensation from the builder.AUTHORITY06/02/2024
BINU CHELLAPPAN vs SHRIRAM PROPERTIES PVT LTDREFUND OR BETTER COMPENSATION FOR THE DELAYAUTHORITY06/02/2023
Sunitha A Kumar vs SHRIRAM PROPERTIES PRIVATE LIMITEDDelay compensation and interest refund till receipt of OC for both units and cancellation of unit1 without any penalty . GST 12% is charged instead of 5% fixed by GOVT. Difference amt to be refundedAUTHORITY05/11/2022
Varun Bansal vs SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTDDelay compensation should be processedAUTHORITY05/08/2024
Soumya Ranjan Choudhury & Sasmita Nayak vs SHRIRAM PROPERTIES PRIVATE LIMITEDRequest for delay compensation for 1.5 years as per RERA regulationsAUTHORITY05/08/2024
Sheela Jha vs SHRIRAM PROPERTIES PRIVATE LIMITEDDelay compensation + Project completion + Cost of legal expensesAUTHORITY04/11/2022
ANKIT NADGOUDA vs SHRIRAM PROPERTIES PRIVATE LIMITED & 3 OTHERSSnags to be rectified in our flat + Compensation to be provided to us for the delay in handoverAUTHORITY03/10/2023
MR VIPIN KUMAR GUPTA AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHER1)Get the project completion with all promised/agreed amenities ASAP2)Decide on the delayed compensation payment and get it adjusted with upcoming demands3)Penalise builder for harassing customersAUTHORITY01/08/2023
MR.NIMEESH K RAMAKRISHNAN & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERI am expecting a relief like delay compensation until possession, refund EMI dues by the builder, action to complete the project in utmost priority. As a second option cancel the booking and refund.AUTHORITY01/07/2026
MR SOOREJ SASIKALA RAMESAN & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHER, compensation amount (MCLR+2%) to be paid including due interest for the delayed period with immediate effect as of todayAUTHORITY01/07/2026
Apartment not handed over on time vs SHRIRAM PROPERTIES PRIVATE LIMITEDDue to their carelessness I have to pay the rent and the EMI to bank which is increasing my financial debt. Requesting RERA to instruct Shriram builder to pay me the interest as per RERA policy.AUTHORITY01/06/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

RERA 70% project account is on file: ICICI Bank Jayanagar 5th Block (IFSC ICIC0001666, a/c …0202). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~9 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City9 km
MG Road / city centre9 km
Bellandur–Marathahalli belt10 km
Outer Ring Road / Manyata16 km
Whitefield IT hub18 km
Kempegowda Int'l Airport36 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Badarinath.

Other RERA-registered projects in Hulimavu

Major developers building in Hulimavu

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Shriram Summitt?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026