Invictus by GS Tower C

PR1180002501500 · Gandhi Nagar MIG Colony, Bandra East · promoter Ten Realty West

Certificate SignedDue 31 Aug 2031

Delivery & Registration

MahaRERA registrationPR1180002501500
Registered on18 Nov 2025
Promoter-declared completion31 Aug 2031
Current statusCertificate Signed
Against today61 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Ten Realty West is the promoter of record on 73 projects, of which 5 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Construction Progress

MahaRERA's cost filing puts construction at ~2.6% of the estimated project cost incurred as of the last certificate (₹4.92 Cr spent against a ₹189.66 Cr estimate). This financial % is the regulator's own proxy for how much is physically built — the closest public read on real progress, and one a brochure never shows.

Cost-incurred % as last certified to MahaRERA; it can lag on-site reality between filings. Confirm the current stage and the latest Form 2 before you book.

Sales & Inventory

Of 11 homes filed with MahaRERA, 3 are sold/booked and 8 remain available (~27% sold) — early in sales — more choice of units now, but confirm the developer has the pre-sales to fund the build. Buyers have committed ₹19.61 Cr in agreement value so far. Of that, ₹3.13 Cr (~16%) is already collected, ₹16.48 Cr receivable — a read on how far along these sales really are. Note: the project registers 91 homes in total, but this sold/unsold inventory filing covers only 11 of them — the other 80 aren't in the ledger yet. Ask the builder what they are (an unreleased phase, held-back stock, or non-saleable/car-park units) before reading too much into the percentage. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

The unsold units on the filing — if you're quoted a unit NOT on this list, ask why it shows as sold/booked on the RERA record:

FloorUnitCarpetReckoner value
Floor 11011,386 sqft (128.73 sqm)₹4.91 Cr
Floor 11041,208 sqft (112.2 sqm)₹4.38 Cr
Floor 22011,372 sqft (127.5 sqm)₹4.62 Cr
Floor 22041,193 sqft (110.83 sqm)₹4.08 Cr
Floor 2020041,460 sqft (135.67 sqm)₹5.41 Cr
Floor 33041,193 sqft (110.83 sqm)₹4.08 Cr
Floor 44041,193 sqft (110.83 sqm)₹4.08 Cr
Floor 77011,372 sqft (127.5 sqm)₹4.85 Cr

No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+29 and 91 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
Tower C1G+2991-

Unit mix on the filing: 91 residential.

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

Location, Land & Connectivity

Located at Gandhi Nagar MIG Colony, Bandra East, Nanasaheb Dharmadhikari Road, Thane, Thane, 400051. Per the filed land record, the plot is bounded to the north by 18.00 mt Existing Road, to the south by 24.40 mt Existing Road, to the east by 9.15 mt Existing Road and to the west by 9.15 mt Existing Road. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Bandra Kurla Complex (BKC)2 km
Chhatrapati Shivaji Int'l Airport4 km
Lower Parel / Worli business district7 km
Andheri MIDC / SEEPZ8 km
Powai / Hiranandani business park9 km
Nariman Point / Fort15 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

TEN X Realty West Limited is the promoter on 6 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

Other flagged projects by TEN X Realty West Limited

TEN X Realty West Limited
FlaggedMumbai Suburban
TEN X Realty West Limited
FlaggedMumbai Suburban
TEN X Realty West Limited
FlaggedMumbai Suburban
TEN X Realty West Limited
FlaggedMumbai Suburban
TEN X Realty West Limited
FlaggedMumbai Suburban

Other RERA-registered projects in Bandra East

Sajay Avenue 18
possession by Aug 2026 · Vinca Realtors Private Limited
A And O Estado
Not filing quarterly progress reports · possession by Dec 2026 · Ashapura Builders AND Developers
Antariksh Ace
possession by Dec 2026 · Pittie Antariksh Realty Private Limited
Bandra North Gulmohar Avenue
possession by Dec 2026 · Shivalik Ventures Private Limited
Gurukrupa Nirmalam
possession by Dec 2026 · Gurukrupa Realcon Infrastructure LLP
LEO Eminence
possession by Dec 2026 · LEO Infrastructure Private Limited

Major developers building in Bandra East

Other RERA-registered projects in Mumbai Suburban

Invictus By GS Tower D
possession by Aug 2031 · TEN X Realty West Limited
Invictus By GS Tower E
possession by Aug 2031 · TEN X Realty West Limited
Invictus By GS Tower F
possession by Aug 2031 · TEN X Realty West Limited
Iora At L And T Realty Elixir Reserve
declared completion May 2025 · Larsen & Toubro Ltd.
Ipsit Anand Mangal
possession by Dec 2027 · Navkar Developers
Ipsit Deep Darshan
possession by Dec 2029 · Ipsit Incline

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026