MahaRERA Property Intelligence · Thane

KOHINOOR EDEN B8

PM1335052600327 · Village Adivali-Dhokali · promoter Kgi Realty Private

Certificate SignedDue 31 Dec 2029

Delivery & Registration

MahaRERA registrationPM1335052600327
Registered on04 May 2026
Promoter-declared completion31 Dec 2029
Current statusCertificate Signed
Against today41 months to the declared date

Sales & Inventory

Of 17 homes filed with MahaRERA, 0 are sold/booked and 17 remain available (~0% sold) — early in sales — more choice of units now, but confirm the developer has the pre-sales to fund the build. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

The unsold units on the filing — if you're quoted a unit NOT on this list, ask why it shows as sold/booked on the RERA record:

FloorUnitCarpetReckoner value
Ground/Floor 0Retail 1214 sqft (19.88 sqm)₹9.14 Lakh
Ground/Floor 0Retail 10110 sqft (10.25 sqm)₹4.71 Lakh
Ground/Floor 0Retail 11148 sqft (13.75 sqm)₹6.33 Lakh
Ground/Floor 0Retail 12190 sqft (17.69 sqm)₹8.14 Lakh
Ground/Floor 0Retail 13190 sqft (17.69 sqm)₹8.14 Lakh
Ground/Floor 0Retail 14148 sqft (13.75 sqm)₹6.33 Lakh
Ground/Floor 0Retail 15116 sqft (10.77 sqm)₹4.95 Lakh
Ground/Floor 0Retail 16147 sqft (13.65 sqm)₹6.28 Lakh
Ground/Floor 0Retail 1779 sqft (7.33 sqm)₹3.37 Lakh
Ground/Floor 0Retail 2217 sqft (20.2 sqm)₹9.29 Lakh
Ground/Floor 0Retail 3154 sqft (14.28 sqm)₹6.57 Lakh
Ground/Floor 0Retail 4194 sqft (17.99 sqm)₹8.28 Lakh
Ground/Floor 0Retail 5148 sqft (13.75 sqm)₹6.33 Lakh
Ground/Floor 0Retail 6110 sqft (10.25 sqm)₹4.71 Lakh
Ground/Floor 0Retail 7153 sqft (14.25 sqm)₹6.55 Lakh
Ground/Floor 0Retail 8101 sqft (9.38 sqm)₹4.31 Lakh
Ground/Floor 0Retail 9153 sqft (14.25 sqm)₹6.55 Lakh

No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+0 and 17 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
PLOT C COMM BUILDING1G+017-

Unit mix on the filing: 17 non-residential (shops/offices).

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

Location, Land & Connectivity

Located at Village Adivali-Dhokali, Survey no. 36/23/3 and Survey no. 36/24, Sector no. 27, Ulhasnagar, Thane, 421306. Per the filed land record, the plot is bounded to the north by 24 mtr wide road, to the south by Existing Road, to the east by Hissa no. 3 and to the west by Not in possession Existing Road. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~26 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Powai / Hiranandani business park26 km
Andheri MIDC / SEEPZ29 km
Chhatrapati Shivaji Int'l Airport31 km
Bandra Kurla Complex (BKC)31 km
Lower Parel / Worli business district39 km
Nariman Point / Fort45 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.

Unlock in the ₹999 report →

🔒 Unit-by-unit guidance · Unit Guidance report

Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full financial records — escrow, funding & the document catalog · Compliance report

The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.

Unlock in the ₹999 report →

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Builder track record

KGI Realty Private Limited is the promoter on 14 MahaRERA-registered projects, with none currently carrying a regulator flag — a reassuring wider track record (matched on the promoter name in the register; it doesn't guarantee this specific project, but a clean portfolio is a good sign).

See every KGI Realty Private Limited project & its RERA track record →

Other flagged projects by KGI Realty Private Limited

KGI Realty Private Limited
FlaggedThane
KGI Realty Private Limited
FlaggedThane
KGI Realty Private Limited
FlaggedThane
KGI Realty Private Limited
FlaggedThane
KGI Realty Private Limited
FlaggedThane
KGI Realty Private Limited
FlaggedThane

Other RERA-registered projects in Kalyan East

Krishna Square
possession by Jul 2026 · Gopal Krishna Developers
SAI Heights
possession by Aug 2026 · Aaradhana Construction
Avighna Karan Wing C
possession by Aug 2026 · Avighna Karan
Kohinoor Eden
possession by Sep 2026 · KGI Realty Private Limited
Kohinoor Eden Ph 2
possession by Sep 2026 · KGI Realty Private Limited
Durga Imperial
possession by Oct 2026 · G K Mali & C K Mali

Major developers building in Kalyan East

Other RERA-registered projects in Thane

Kohinoor Eden Ph 2
possession by Sep 2026 · KGI Realty Private Limited
Kohinoor Gardens
possession by Nov 2027 · KGI Realty Private Limited
Kohinoor Heights
declared completion Sep 2025 · Kohinoor Buildcon
Kohinoor Highland
possession by Dec 2026 · KGI Realty Private Limited
Kohinoor Lifestyle
declared completion Dec 2020 · Sonu Anil Hotchandani
Kohinoor Luxuria
declared completion Sep 2022 · Shankar Hotchandani

What to verify before you book

  1. Confirm the MahaRERA registration is live and read the project page on the MahaRERA portal for the sanctioned plan, approvals and the promoter's quarterly progress reports.
  2. Check the declared completion date against actual site progress — registration is not the same as a delivered, occupancy-certified building.
  3. Verify the exact carpet area, floor and unit number in your agreement match the sanctioned plan (not the brochure's saleable area).
  4. Confirm the title, the 7/12 land extract and that your payments go to the project's designated RERA escrow account.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 27 Jul 2026