RERA Property Intelligence Report · Preview

ALLEGRO AVENTUS

ALLEGRO BUILDERS AND DEVELOPERS · · K-RERA PRM/KA/RERA/1257/334/PR/100222/004694

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

78
Registered units
₹20.0 Cr
Est. construction cost
Units profiled
40
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units78Total inventory registered with K-RERA.
Official carpet area6,171 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area10,760 sqmUseful scale context when comparing density and project cost.
Registered land area2,431 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI3.084Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed88 total (74 covered, 14 open) — 1.13 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberE9/BA108/2020-21Use this to match the sanctioned drawing set shown by the builder.
Plan approval date16-09-2021
Project start date14-01-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Flats78100%6,171 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Allegro Aventus13788841.58 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 78 official flat/unit rows, matching the 78 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK7874.0-80.8 sqm28.8-32.3 sqm78

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Allegro Aventus7874.0-80.8 sqm28.8-32.3 sqm78
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
101Allegro Aventus12 BHK78.2 sqm29.9 sqm1
102Allegro Aventus12 BHK78.2 sqm29.9 sqm1
103Allegro Aventus12 BHK74.0 sqm28.8 sqm1
104Allegro Aventus12 BHK78.2 sqm29.9 sqm1
105Allegro Aventus12 BHK78.2 sqm29.9 sqm1
106Allegro Aventus12 BHK78.2 sqm30.4 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~851 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 78 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 88 parking spaces for 78 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~31 sqm per home; across all 78 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 7 of 35 compliance document slots are filed as under process / not yet usable: Certificate from Registered Engineer indicating the structural safety of the building, Urban Land Ceiling, Brochure, JD AFFIDAVIT CUM DECLARATION, Approval/NOC under section 109 of KLR Act 1961 and more.

6 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note environmental clearance and pollution-control clearance (KSPCB) are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

6 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved25-10-2021Water NOC.jpg
KPTCL- BESCOMApproved19-11-2021NOC Mescom.pdf
Fire and SafetyApproved31-12-2020Fire NOC Com.pdf
Labour and Education DepartmentApproved01-06-2022Labour Registration Cirtificate.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantB.N. Surendra Bhat0238921972Dakshina Kannada, Karnataka - 575001
EngineerK.Anil HegdeMNG/BL/10124/20-211998Dakshina Kannada, Karnataka - 575003
ArchitectNayak Pai & AssociatesCA/2018/949701989Dakshina Kannada, Karnataka - 575003
ContractorAllegro Mahabaleshwara Ventures LLP-2019Dakshina Kannada, Karnataka - 560038

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹2.86 Cr collected from buyers, ₹3.77 Cr withdrawn from the project's escrow account. This quarter the escrow withdrawal (₹3.77 Cr) exceeded buyer collections (₹2.86 Cr) — worth asking the builder to reconcile against certified construction milestones, which is what RERA requires escrow draws to track.

Construction progress90% → 98% (+8 pts)
Units sold/booked as registered49/78 (63%)
Buyer collections in available QPRs₹6.57 Cr
Escrow withdrawals in available QPRs₹7.27 Cr (1.11x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹25.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: STATE BANK OF INDIA SME Branch, Mangalore IFSC Code : SBIN0004118 Pin Code : 575003. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~3 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Bellandur–Marathahalli belt3 km
Whitefield IT hub5 km
MG Road / city centre11 km
Outer Ring Road / Manyata13 km
Electronic City14 km
Kempegowda Int'l Airport27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Allegro Builders.
Allegro Builders has 2 projects registered in Bangalore, 1 completed.

Other projects by this builder in Bangalore

Other RERA-registered projects in Marathahalli

Major developers building in Marathahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Allegro Aventus?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026