K-RERA · the public record
ARYAN GOLDEN ARENA
Bengaluru South · Aryan Hometec
Know the project.
Then choose your home.
The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.
The record · free to read
Registration read 20 Sep 2026Progress & dates
The timeline on file.
Available record
No construction trend to plot.
The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.
declared completion
31 Mar 2021
The registered date and a construction update answer different questions. Neither is a confirmation of possession.
K-RERA registration · read 20 Sep 2026
Inventory & scale
What this registration contains.
Filed categories, unchanged · K-RERA registration · read 20 Sep 2026
The whole registration
0.6registered acres
130.3registered units per acre
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.
From another project · Prestige Park Grove
A larger advertised area. Almost the same carpet area.
In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.
This illustrates the report format. These findings concern the named sample, not this project.
Read the sample report ↗
The source record
The details behind the headline.
K-RERA · PRM/KA/RERA/1251/310/PR/171031/001288
This project, on the record
The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
Official Registry Facts
Official project scale
RERA filingRegistration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 72 | Total inventory registered with K-RERA. |
| Official carpet area | 3,754 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 2,236 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.74 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered tower/wing entries | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking total (reconciled) | 80 | Separate filed counts; these categories may overlap and are not added together. |
| Open-parking field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Project start date | 20-07-2017 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| 2 BHK & 3 BHK | 65 | 100% | 3,754 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| Aryan Golden Arena -J | 9 | 72 | 80 | - |
Official unit register
RERA filingK-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 72 official flat/unit rows, matching the 72 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 3BHK | 54 | 654.0-680.0 sqft | 270.2-288.1 sqft | 54 |
| 2BHK | 18 | 424.0-554.0 sqft | 176.5-231.2 sqft | 18 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| Aryan Golden Arena -J | 72 | 424.0-680.0 sqft | 176.5-288.1 sqft | 72 |
Show sample official unit rows
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| J-101 | Aryan Golden Arena -J | 1 | 2BHK | 424.0 sqft | 176.5 sqft | 1 |
| J-102 | Aryan Golden Arena -J | 1 | 3BHK | 678.0 sqft | 285.3 sqft | 1 |
| J-103 | Aryan Golden Arena -J | 1 | 3BHK | 680.0 sqft | 288.1 sqft | 1 |
| J-104 | Aryan Golden Arena -J | 1 | 3BHK | 670.0 sqft | 285.3 sqft | 1 |
| J-105 | Aryan Golden Arena -J | 1 | 3BHK | 654.0 sqft | 270.2 sqft | 1 |
| J-106 | Aryan Golden Arena -J | 1 | 2BHK | 554.0 sqft | 231.2 sqft | 1 |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingNo litigation declared on this project's K-RERA filing.
All 19 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Mar 2021, extended (Covid Extension) to 31 Dec 2021 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (12 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Paudan Kumar vs Aryan Hometec Pvt Ltd | Refund of booking amount along with the interest. Stop the EMIs for the disbursed loan amount. Closure of the loan by builder. Refund of EMIs already paid. | AUTHORITY | 29/12/2025 |
| Sangeeth C vs ARYAN HOMETEC PVT LTD | Need RERA intervention to get the refund , Need a refund of complete amount paid , including the advance paid from my pocket - 1.5 lacs and 6.5 lacs home loan, also 2 lacs pre EMI paid | AUTHORITY | 19/10/2022 |
| Ershad Ali vs ARYAN HOMETEC PRIVATE LIMITED | Refund of the total amount paid to Builder and Financer. | AUTHORITY | 19/10/2022 |
| Pendurthi Sivaraj vs BHARAT REDDY, M/s ARYAN HOMETEC PVT LTD | WE WANT TO CANCEL BOOKING . LET THE BUILDER CLEAR LOAN Amount ALONG WITH INTEREST PENALTY ALONG EMIS PAID TILL DATE BY US & REPAY THE AMOUNT TO FINANCIER DHFL LOAN OUTSTANDING. | AUTHORITY | 17/09/2022 |
| Gaurav Kumar R vs Aryan Hometec Pvt Ltd | return of money with interest and expenses clear the dues with yes bank & close the loan account. | AUTHORITY | 16/06/2026 |
| Manas Yeshwant Gorey vs ARYAN HOMETEC PVT LTD | In view of the facts mentioned in the above paragraph, the Applicant prays for the following compensations: i. Direct the Respondent Nos.1 and 2 to return and pay a sum of INR 25,44,057/- to the Appli | AUTHORITY | 16/06/2026 |
| MR.ABDUL JALEEL PEEDIKKANDY vs M/S.ARYAN HOMETEC PVT LTD | refund of an amount of Rs.8,71,122/- along with penalty and delayed interest @24% per annum from the date of booking of the Unit and compensation of Rs. 5,00,000/- and a sum of Rs.2,00,000/- as reimbu | AUTHORITY | 13/11/2023 |
| Aryan Golden Arena Buyers Welfare Association vs Aryan Hometec Pvt Ltd | Allow the allottees to complete the project by taking over the project and to allow to recover the funds misappropriated / swindled by the Respondents from the project | AUTHORITY | 12/12/2025 |
| MR BIRENDRA KUMAR & ANOTHER vs ARYAN HOMETEC PVT LTD | All dues to be cleared with bank interest and bookings of units to be cancelled. | AUTHORITY | 05/12/2024 |
| PAWAN KUMAR vs Aryan Hometec Pvt Ltd | a. Initiate forensic audit of accounts and transactions of the respondent No. 1 to 12 and initiate action under section 35 of the Act and other related provisions to investigate. | AUTHORITY | 05/08/2026 |
| Raghavendra Babu K R vs Aryan Hometec Pvt Ltd | Refund of sale consideration, Payment of Assured Sum of Money, Closure of Loan, Compensation for non delivery of Apartment | AUTHORITY | 02/09/2024 |
| Mohammed Nawaz vs Aryan Hometec Pvt Ltd | To help in Cancelling the Flat Unit & Refund of all PRE EMIS & Refund of Loan Disburse Amount of 6 Lakhs | AUTHORITY | 01/07/2026 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (62 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/190426/0002768 26-04-2019 | Booking Amount Refund | ARYAN GOLDEN ARENA - D (another project by this promoter) | DISPOSED AO |
| CMP/190613/0003277 13-06-2019 | Non hand over of flat | ARYAN GOLDEN ARENA - C (another project by this promoter) | DISPOSED AO |
| CMP/190715/0003529 15-07-2019 | Refund of money | ARYAN GOLDEN ARENA - E (another project by this promoter) | DISPOSED AO |
| CMP/191008/0004435 08-10-2019 | Non delivery of Flat and not able to meet promoter | ARYAN GOLDEN ARENA - C (another project by this promoter) | DISPOSED AO |
| CMP/191023/0004072 23-10-2019 | PRE EMI iSSUE | ARYAN GOLDEN ARENA - F (another project by this promoter) | DISPOSED AO |
| CMP/191028/0004569 28-10-2019 | Delay in Construction | ARYAN GOLDEN ARENA - F (another project by this promoter) | DISPOSED AO |
| CMP/191121/0004782 21-11-2019 | Refund of booking amount | ARYAN GOLDEN ARENA - G (another project by this promoter) | DISPOSED AO |
| CMP/191121/0004780 21-11-2019 | Refund of Booking Amount | ARYAN GOLDEN ARENA - F (another project by this promoter) | DISPOSED AO |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Project team & certifications
RERA filingK-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | Ramesha DB -Landmark Architects & Engineers | - | 2014 | 22nd Main, JP Nagar 2nd Phase |
| Structural engineer | G. Praveen Kumar -ECO Consultants | - | - | - |
Builder track record
RERA filingAryan Hometec has 8 other K-RERA-registered projects in our records. 8 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a higher delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹8.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: Indian Bank JP Nagar. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Construction photo filings
RERA filingK-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
Location & Connectivity
The nearest major job hub is ~14 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.
| Landmark | Straight-line |
|---|---|
| Electronic City | 14 km |
| Bellandur–Marathahalli belt | 18 km |
| Whitefield IT hub | 18 km |
| MG Road / city centre | 27 km |
| Outer Ring Road / Manyata | 32 km |
| Kempegowda Int'l Airport | 44 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.