RERA Property Intelligence Report · Preview

BOLLINENI ASTRA

BEEKAY DREAMLANDS · Bengaluru North · K-RERA PRM/KA/RERA/1251/309/PR/190614/002619

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

199
Registered units
₹85.0 Cr
Est. construction cost
Units profiled
30
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units199Total inventory registered with K-RERA.
Official carpet area211,248 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area15,985 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~1.74Sanctioned floor-area ratio (≈27,827 sqm sanctioned FAR area ÷ 15,985 sqm land) — higher means a denser vertical build.
Registered towers/wings2Official tower/wing count in the K-RERA detail page.
Parking disclosed416 total (15 open) — 2.09 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date02-05-2019

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Residential Apartment199100%211,248 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
TOWER 112128216-
TOWER 21171200-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 199 official flat/unit rows, matching the 199 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK7676.4-79.3 sqm62.7-65.0 sqm76
3BHK59112.8-115.5 sqm90.1-92.7 sqm59
2.5 BHK5298.8 sqm79.6 sqm52
4BHK12161.9 sqm130.3 sqm12

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
TOWER 112876.4-98.8 sqm62.7-79.6 sqm128
TOWER 271112.8-161.9 sqm90.1-130.3 sqm71
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
2TOWER 102.5 BHK98.8 sqm79.6 sqm1
3TOWER 102.5 BHK98.8 sqm79.6 sqm1
4TOWER 102BHK76.4 sqm62.7 sqm1
5TOWER 102BHK76.4 sqm62.7 sqm1
6TOWER 102.5 BHK98.8 sqm79.6 sqm1
7TOWER 102.5 BHK98.8 sqm79.6 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,065 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 199 homes across 2 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 416 parking spaces for 199 homes (~2.1 per home) — comfortable headroom over the 1-per-home many projects offer.
Your land share (UDS)Undivided land share averages ~80 sqm per home; across all 199 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

3 of 24 compliance document slots are filed as Not Applicable; the remaining 21 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 01 Dec 2023, extended (Covid Extension) to 01 Sep 2024 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectMalathi-1969Venkat raman Associates, 10/2 oshaughnessy Raod langford garden
ContractorBEEKAY DREAMLANDS PVT LTD-2007Lower Palace Orchards, Sadashiva Nagar
Structural engineerPruthviraj---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹42.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank SADASHIVNAGAR (IFSC UTIB0001887, a/c …8411). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~6 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Outer Ring Road / Manyata6 km
MG Road / city centre14 km
Kempegowda Int'l Airport15 km
Bellandur–Marathahalli belt20 km
Whitefield IT hub21 km
Electronic City29 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Beekay Dreamlands.

Other RERA-registered projects in Yelahanka

Major developers building in Yelahanka

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Bollineni Astra?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026