Bangalore/Project record

K-RERA · the public record

DC CAPITOL

Bengaluru East · D C HI RISE

Know the project.
Then choose your home.

The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.

31 Oct 2022declared completionK-RERA registration · read 20 Sep 2026
152registered unitsK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Available record

No construction trend to plot.

The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.

declared completion

31 Oct 2022

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

2 AND 3 BHK RESIDENTIAL FLATS
152

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

2.1registered acres

72.4registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/446/PR/191220/003084

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 October 2022
Land area8,497 sq m (2.1 acres)
Homes registered152
Tower/wing entries1
Unit mix152 × 2 AND 3 BHK RESIDENTIAL FLATS

In context

Density72.4 homes per acre
Density in context44th percentile of 1119 Bengaluru East projects (median 75.5)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units152Total inventory registered with K-RERA.
Official carpet area12,145 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area8,497 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~1.99Sanctioned floor-area ratio (≈16,948 sqm sanctioned FAR area ÷ 8,497 sqm land) — higher means a denser vertical build.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)156Separate filed counts; these categories may overlap and are not added together.
Open-parking field15Separate filed counts; these categories may overlap and are not added together.
Garage field155Separate filed counts; these categories may overlap and are not added together.
Project start date30-09-2019

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 AND 3 BHK RESIDENTIAL FLATS152100%12,145 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
BLOCK A4152156-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 152 official flat/unit rows, matching the 152 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK9268.0-78.0 sqm49.0-57.0 sqm92
3BHK6082.0-103.0 sqm57.0-75.0 sqm60

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
BLOCK A15268.0-103.0 sqm49.0-75.0 sqm152
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
001BLOCK A12BHK70.0 sqm51.0 sqm1
002BLOCK A12BHK70.0 sqm51.0 sqm1
003BLOCK A12BHK70.0 sqm52.0 sqm1
004BLOCK A12BHK74.0 sqm53.0 sqm1
005BLOCK A12BHK70.0 sqm52.0 sqm1
006BLOCK A12BHK78.0 sqm57.0 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 48 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Oct 2022, extended (Covid Extension) to 31 Jul 2023 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA complaint orders (51 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Nagendra Baddam vs D C HI RISE LLP1. need our compound wall on south side as per original approved plan & Swimming pool 2. dont want to share our UDS & Driveway to anyother phases 3. association formation , handing over original docsAUTHORITY23/06/2025
SREENATH VEMPALLI vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Ravikumar Tanneru vs D C HI RISE LLP1. need our compound wall on Westside as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Muralikrishna Maddu vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Sumanth Kumar Vanga vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Anindra Nallapati vs D C HI RISE LLPRelief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing ovAUTHORITY23/06/2025
Karthik N vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Hanumantharao vs D C HI RISE LLP1. need our compound wall on south side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
M V M Murali Krishna vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
SATYA GOPI KRISHNA KANTH MYNENI vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol and3. association formation , handing over original docsAUTHORITY23/06/2025
Nayab Rasool Nandavarapu vs D C HI RISE LLP1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
Menta Manikanta vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Prasanta Kumar Jena vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Thejaswini vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Praveen Kumar Palli vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Yedugur Susmitha vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Sandeep Kumar Vemulapalli vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
yagnyashri shrikanth Baba vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
BhanuKiran Botta vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
SRINIVASARAO VAKKALAGADDA vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Kona Balachandra vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Sumana vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
GIRISHA N vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs DocAUTHORITY23/06/2025
K Suneel vs D C HI RISE LLP1.Need our compound wall on south side to be contructed as per original plan 2. Dont want to share the driveway to further phases formationAUTHORITY23/06/2025
VEERA PRASAD CHATLA vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Dadi S K K Santosh Venkat vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Sreekanth Badida vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Seshananda Reddy Tippaluri vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Sreerama Abhinay vs D C HI RISE LLPWe require the compound wall on the west side to be constructed as per the originally approved plan." "We do not wish to share our Undivided Share (UDS) and driveway with any other phases of the DC CaAUTHORITY23/06/2025
Bhargav R vs D C HI RISE LLPWe require the compound wall on the west side to be constructed as per the originally approved plan." "We do not wish to share our Undivided Share (UDS) and driveway with any other phases of the DC CaAUTHORITY23/06/2025
Ramakrishna Kovuri vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Don't want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
Priyanshu Kumar Sinha vs D C HI RISE LLPRelief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. No sharing UDS & Driveway to other phases of DC Capitol 3. Need all original documents for AssociationAUTHORITY23/06/2025
S Ashish Prusty vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation & handing over original docsAUTHORITY23/06/2025
Kumari Nitu Kushwaha vs D C HI RISE LLP(Driveway & registered UDS) Relief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. associAUTHORITY23/06/2025
Gyana Ranjan Mahunta vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formationAUTHORITY23/06/2025
Sampath A vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. don't want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation, handing over original docsAUTHORITY23/06/2025
Arvind Kumar Tiwari vs D C HI RISE LLPNeed our compound wall on WEST side as per original approved plan . dont want to share our UDS & Driveway to any other phases of DC Capitol. Document pending for association formationAUTHORITY23/06/2025
PANKAJ AMBARTANI vs D C HI RISE LLP1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
Praveen Kumar SP vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formationAUTHORITY23/06/2025
Bhaskar Viswanathan vs D C HI RISE LLP1.Need our full compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
Arun Kumar vs D C HI RISE LLP1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original DocsAUTHORITY23/06/2025
Gopinath S vs D C HI RISE LLP1.need our compound wall on WEST side as per original approved plan 2.dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Tapan Kumar Mishra vs D C HI RISE LLP1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docsAUTHORITY23/06/2025
Radha Krishna Indupuri vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Jayita Saha vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs DocAUTHORITY23/06/2025
Mahesh Podapati vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs DocAUTHORITY23/06/2025
Ramkumar vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
Pruthvi V vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyotherphases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
chitiprolu mahesh vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs DocAUTHORITY23/06/2025
Gayathri V S vs D C HI RISE LLP1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docsAUTHORITY23/06/2025
YASH KUMAR vs D C CAPITALWe are interested in buying the flat. And would like rera authorities to intervene as the builder is not adhering to the sale agreement and refusing to give us the flat.AUTHORITY16/11/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (1 complaint listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/220107/0008772
07-01-2022
Refusing to sale flat (flat no 122) after agreement and giving it to someone elseDC CAPITOLDISPOSED AUTHORITY BENCH5

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectV SIVA KUMAR-200821ST MAIN, BSK II STAGE
ContractorBHAKTHAVACHALU NAIDU-2005SBM ROAD, CHIKKALASANDRA
Structural engineerSRINIVAS RAO BOLIMUNTA---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹31.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank PANATHUR BRANCH (IFSC UTIB0002928, a/c …7709). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Bellandur–Marathahalli belt2 km
Whitefield IT hub6 km
Electronic City11 km
MG Road / city centre11 km
Outer Ring Road / Manyata15 km
Kempegowda Int'l Airport29 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Hi Rise.

Other RERA-registered projects in Balagere

Major developers building in Balagere

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in DC Capitol?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 20 Sep 2026