D C HI RISE · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/191220/003084
Report coverage
K-RERA registry & builder-record report
What this report covers
To confirm directly with the builder
🔒 The verdict & buyer playbook · Compliance report
The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 152 | Total inventory registered with K-RERA. |
| Official carpet area | 12,145 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 8,497 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | ~1.99 | Sanctioned floor-area ratio (≈16,948 sqm sanctioned FAR area ÷ 8,497 sqm land) — higher means a denser vertical build. |
| Registered towers/wings | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 156 total (15 open) — 1.03 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 30-09-2019 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| 2 AND 3 BHK RESIDENTIAL FLATS | 152 | 100% | 12,145 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| BLOCK A | 4 | 152 | 156 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 152 official flat/unit rows, matching the 152 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 92 | 68.0-78.0 sqm | 49.0-57.0 sqm | 92 |
| 3BHK | 60 | 82.0-103.0 sqm | 57.0-75.0 sqm | 60 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| BLOCK A | 152 | 68.0-103.0 sqm | 49.0-75.0 sqm | 152 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 001 | BLOCK A | 1 | 2BHK | 70.0 sqm | 51.0 sqm | 1 |
| 002 | BLOCK A | 1 | 2BHK | 70.0 sqm | 51.0 sqm | 1 |
| 003 | BLOCK A | 1 | 2BHK | 70.0 sqm | 52.0 sqm | 1 |
| 004 | BLOCK A | 1 | 2BHK | 74.0 sqm | 53.0 sqm | 1 |
| 005 | BLOCK A | 1 | 2BHK | 70.0 sqm | 52.0 sqm | 1 |
| 006 | BLOCK A | 1 | 2BHK | 78.0 sqm | 57.0 sqm | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Unit-by-unit guidance · Unit Guidance report
Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.
🔒 Full records — land title, amenities paperwork & document catalog · Compliance report
The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.
No litigation declared on this project's K-RERA filing.
All 48 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Oct 2022, extended (Covid Extension) to 31 Jul 2023 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA complaint orders (51 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Nagendra Baddam vs D C HI RISE LLP | 1. need our compound wall on south side as per original approved plan & Swimming pool 2. dont want to share our UDS & Driveway to anyother phases 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| SREENATH VEMPALLI vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Ravikumar Tanneru vs D C HI RISE LLP | 1. need our compound wall on Westside as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Muralikrishna Maddu vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Sumanth Kumar Vanga vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Anindra Nallapati vs D C HI RISE LLP | Relief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing ov | AUTHORITY | 23/06/2025 |
| Karthik N vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Hanumantharao vs D C HI RISE LLP | 1. need our compound wall on south side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| M V M Murali Krishna vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| SATYA GOPI KRISHNA KANTH MYNENI vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol and3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Nayab Rasool Nandavarapu vs D C HI RISE LLP | 1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Menta Manikanta vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Prasanta Kumar Jena vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Thejaswini vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Praveen Kumar Palli vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Yedugur Susmitha vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Sandeep Kumar Vemulapalli vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| yagnyashri shrikanth Baba vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| BhanuKiran Botta vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| SRINIVASARAO VAKKALAGADDA vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Kona Balachandra vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Sumana vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| GIRISHA N vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs Doc | AUTHORITY | 23/06/2025 |
| K Suneel vs D C HI RISE LLP | 1.Need our compound wall on south side to be contructed as per original plan 2. Dont want to share the driveway to further phases formation | AUTHORITY | 23/06/2025 |
| VEERA PRASAD CHATLA vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Dadi S K K Santosh Venkat vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Sreekanth Badida vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Seshananda Reddy Tippaluri vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Sreerama Abhinay vs D C HI RISE LLP | We require the compound wall on the west side to be constructed as per the originally approved plan." "We do not wish to share our Undivided Share (UDS) and driveway with any other phases of the DC Ca | AUTHORITY | 23/06/2025 |
| Bhargav R vs D C HI RISE LLP | We require the compound wall on the west side to be constructed as per the originally approved plan." "We do not wish to share our Undivided Share (UDS) and driveway with any other phases of the DC Ca | AUTHORITY | 23/06/2025 |
| Ramakrishna Kovuri vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Don't want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Priyanshu Kumar Sinha vs D C HI RISE LLP | Relief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. No sharing UDS & Driveway to other phases of DC Capitol 3. Need all original documents for Association | AUTHORITY | 23/06/2025 |
| S Ashish Prusty vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation & handing over original docs | AUTHORITY | 23/06/2025 |
| Kumari Nitu Kushwaha vs D C HI RISE LLP | (Driveway & registered UDS) Relief Sought For : 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. associ | AUTHORITY | 23/06/2025 |
| Gyana Ranjan Mahunta vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation | AUTHORITY | 23/06/2025 |
| Sampath A vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. don't want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation, handing over original docs | AUTHORITY | 23/06/2025 |
| Arvind Kumar Tiwari vs D C HI RISE LLP | Need our compound wall on WEST side as per original approved plan . dont want to share our UDS & Driveway to any other phases of DC Capitol. Document pending for association formation | AUTHORITY | 23/06/2025 |
| PANKAJ AMBARTANI vs D C HI RISE LLP | 1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Praveen Kumar SP vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation | AUTHORITY | 23/06/2025 |
| Bhaskar Viswanathan vs D C HI RISE LLP | 1.Need our full compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to another phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Arun Kumar vs D C HI RISE LLP | 1. Need our compound wall on WEST side as per original approved plan 2. Dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original Docs | AUTHORITY | 23/06/2025 |
| Gopinath S vs D C HI RISE LLP | 1.need our compound wall on WEST side as per original approved plan 2.dont want to share our UDS & Driveway to any other phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Tapan Kumar Mishra vs D C HI RISE LLP | 1. Need our Compound Wall on WEST side as per Original Approved Plan 2. Do not want to share our UDS & Driveway to any other Phases of DC Capitol 3. Association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Radha Krishna Indupuri vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Jayita Saha vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs Doc | AUTHORITY | 23/06/2025 |
| Mahesh Podapati vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs Doc | AUTHORITY | 23/06/2025 |
| Ramkumar vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| Pruthvi V vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyotherphases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| chitiprolu mahesh vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs Doc | AUTHORITY | 23/06/2025 |
| Gayathri V S vs D C HI RISE LLP | 1. need our compound wall on WEST side as per original approved plan 2. dont want to share our UDS & Driveway to anyother phases of DC Capitol 3. association formation , handing over original docs | AUTHORITY | 23/06/2025 |
| YASH KUMAR vs D C CAPITAL | We are interested in buying the flat. And would like rera authorities to intervene as the builder is not adhering to the sale agreement and refusing to give us the flat. | AUTHORITY | 16/11/2023 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (1 complaint listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/220107/0008772 07-01-2022 | Refusing to sale flat (flat no 122) after agreement and giving it to someone else | DC CAPITOL | DISPOSED AUTHORITY BENCH5 |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | V SIVA KUMAR | - | 2008 | 21ST MAIN, BSK II STAGE |
| Contractor | BHAKTHAVACHALU NAIDU | - | 2005 | SBM ROAD, CHIKKALASANDRA |
| Structural engineer | SRINIVAS RAO BOLIMUNTA | - | - | - |
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹31.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: Axis Bank PANATHUR BRANCH (IFSC UTIB0002928, a/c …7709). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.
The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 2 km |
| Whitefield IT hub | 6 km |
| Electronic City | 11 km |
| MG Road / city centre | 11 km |
| Outer Ring Road / Manyata | 15 km |
| Kempegowda Int'l Airport | 29 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
Should you buy in DC CAPITOL?
This page is the free K-RERA filing summary. The full RERA Property Intelligence Report gives you buyer-complaint history, regulatory flags, builder track record, the official unit register, land title, NOCs, and (where the sanctioned plans support it) room-by-room unit data and an annotated site plan. See a real one first:
Sample: Sobha Silicon Oasis → · browse all sample reports →
Compliance Report · ₹999
The regulator’s filing record, read · 1 working day
Scan with any UPI app to pay · quietlist@kotak
Unit Guidance Report · ₹2,999
Everything, down to which unit · 1 working day
Not useful to your decision? Full refund — no questions asked.
Scan with any UPI app to pay · quietlist@kotak
Paying from outside India? Pay $15 (Compliance) or $39 (Unit Guidance) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes.
Built by Hi Rise.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.