RERA Property Intelligence Report · Preview
HI LIFE VENTURES · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/180504/001598
Report coverage
K-RERA registry & builder-record report
What this report covers
To confirm directly with the builder
🔒 The verdict & buyer playbook · Compliance report
The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 342 | Total inventory registered with K-RERA. |
| Registered land area | 16,390 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 6 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 342 total (35 open) — 1.00 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 19-01-2018 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| A | 10 | 60 | 60 | - |
| B | 10 | 60 | 60 | - |
| C | 10 | 60 | 60 | - |
| D | 9 | 54 | 54 | - |
| E | 9 | 54 | 54 | - |
| F | 9 | 54 | 54 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 57 official flat/unit rows vs 342 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2 BHK | 38 | 68.9-75.4 sqm | 43.4-46.2 sqm | 38 |
| 3 BHK | 19 | 84.7-89.8 sqm | 41.5-56.9 sqm | 19 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| A | 10 | 72.1-75.4 sqm | 43.4-46.2 sqm | 10 |
| B | 10 | 72.2-75.4 sqm | 43.4-46.2 sqm | 10 |
| C | 10 | 86.3-89.8 sqm | 41.5-56.9 sqm | 10 |
| D | 9 | 68.9 sqm | 44.2 sqm | 9 |
| E | 9 | 68.9 sqm | 44.2 sqm | 9 |
| F | 9 | 84.7 sqm | 50.6-53.9 sqm | 9 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 1 | A | 1 | 2 BHK | 72.1 sqm | 43.4 sqm | 1 |
| 1 | A | 2 | 2 BHK | 75.4 sqm | 46.2 sqm | 1 |
| 1 | A | 3 | 2 BHK | 75.4 sqm | 46.2 sqm | 1 |
| 1 | A | 4 | 2 BHK | 75.4 sqm | 46.2 sqm | 1 |
| 1 | A | 5 | 2 BHK | 75.4 sqm | 46.2 sqm | 1 |
| 1 | A | 6 | 2 BHK | 75.4 sqm | 46.2 sqm | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Unit-by-unit guidance · Unit Guidance report
Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.
🔒 Full records — land title, amenities paperwork & document catalog · Compliance report
The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.
No litigation declared on this project's K-RERA filing.
6 of 22 compliance document slots are filed as Not Applicable; the remaining 16 slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Dec 2021, extended (Covid Extension) to 30 Sep 2022 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (114 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Lakshmikant reddy beniki vs HI LIFE VENTURES PVT LTD | Either refund the total amount paid along with the interest or please start the construction immediately and deliver the apartment as promised. Iam paying the EMI without any progress. | AUTHORITY | 29/10/2025 |
| Animesh Kumar vs HI LIFE VENTURES PVT LTD | Want all money return which I have given either manually or via bank to this project with the interest I have paid till now to the bank and proper compensation for all harrasment I have gone through | AUTHORITY | 29/10/2025 |
| Rahul Srivastava vs HI LIFE VENTURES PVT LTD | Return of amount paid to the builder with interest for the Flat no. A601 in HI LIFE GREENS | AUTHORITY | 29/10/2025 |
| Ashwini Kumari K C vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 29/10/2025 |
| Subhashis Dey vs HI LIFE VENTURES PVT LTD | Possession with all promised amenities / refund amount paid till date with interest | AUTHORITY | 29/10/2025 |
| subbarao pothineni vs HI LIFE VENTURES PVT LTD | Refund the amount | AUTHORITY | 29/10/2025 |
| Ranjane Govindaraj vs HI LIFE VENTURES PVT LTD | Resolution of this matter asap or money refund with full principle and interest paid by me and the bank | AUTHORITY | 27/10/2025 |
| Sanjay Kumar vs HI LIFE VENTURES PVT LTD | Builder is not communicating on Email and Phone | AUTHORITY | 27/10/2025 |
| Harun Kondle vs HI LIFE VENTURES PVT LTD | Completion of Apartment and handover or Refund of the entire amount along with interest paid to banks till date. | AUTHORITY | 27/10/2025 |
| K SURESH KUMAR vs HI LIFE VENTURES PVT LTD | Refund the amount we paid to the Builder along with the Interest | AUTHORITY | 27/10/2025 |
| Ayush Agarwal vs HI LIFE VENTURES PVT LTD | I want to get my money back with loan interest | AUTHORITY | 27/10/2025 |
| RTESH KUMAR MISHRA vs HI LIFE VENTURES PVT LTD | Possession with all promised amenities/ Refund amount paid till date with interest | AUTHORITY | 27/10/2025 |
| Swachchatoya Banerjee vs HI LIFE VENTURES PVT LTD | Refund the Advance amount of Rs.38,60,748/- along with interest @ 24% + Compensation of Rs.5,00,000/- for harassment and Mental agony suffering + Rs.1,00,000/- cost of litigation, | AUTHORITY | 27/10/2025 |
| SriKrishnaPriya Burra vs HI LIFE VENTURES PVT LTD | Project Completion by providing agreed amenities and maintaining the quality of work or Refund of entire amount including interest paid till date | AUTHORITY | 27/10/2025 |
| SHRINIVAS LIMBADRI CHATLA vs HI LIFE VENTURES PVT LTD | I want RERA to intervene and want complete refund along with interest, penalty and compensation from builder. | AUTHORITY | 27/10/2025 |
| Ankur Sharma vs HI LIFE VENTURES PVT LTD | No clarity on project timeline. Builder is doing Fraud. I want all my money back with bank interest. | AUTHORITY | 27/10/2025 |
| VIJAYA JYOTHI MUKKU vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating. Hence, I WANT REFUND OF FULL AMOUNT WITH INTEREST | AUTHORITY | 27/10/2025 |
| S M Atir Hamidi vs HI LIFE VENTURES PVT LTD | Refund of Amount with Interest and compensation | AUTHORITY | 27/10/2025 |
| Venu Babu Gudipudi vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution not clarity on possession date. i want my money back with bank interest. | AUTHORITY | 27/10/2025 |
| Gopalakrishnan Venkataraman vs HI LIFE VENTURES PVT LTD | Completion of Project or Refund of entire money to me from Builder with penalty and with interest. | AUTHORITY | 27/10/2025 |
| MANOHAR REDDY VATTEM vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. Looking for my money back with bank interest | AUTHORITY | 27/10/2025 |
| SHAILENDRA KUMAR & (2) RICHA YADAV vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clearity on possession date. We want our money back with bank interest. | AUTHORITY | 23/02/2023 |
| HRUDAYA RANJAN SAHOO vs HI LIFE VENTUES PVT.LTD. | - Request RERA to check on my mater and refund my money back from builder as I am not having any trust if the project will get delivered. | AUTHORITY | 18/10/2022 |
| Sujai Panicker vs HI LIFE VENTURES PVT LTD., | Requesting your action on the builder to provide a full refund with interest at the earliest. | AUTHORITY | 18/10/2022 |
| SATYANARAYANA CHITTELLAV vs HI LIFE VENTURES PVT LTD., | Builder has to return the Full Amount along with interest as the construction is not started as its been pending since long time due to double registeration issue of the flats . | AUTHORITY | 18/10/2022 |
| G M KAVITHA vs HI LIFE VENTURES PVT LTD | I want the builder to complete and deliver the flat without any litigations (without double-registrations) | AUTHORITY | 18/10/2022 |
| RAJEEV RANJAN vs HI LIFE VENTURES PVT LTD. | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| Amit Kumar vs HI LIFE VENTURES PVT LTD., | Either Construction should start and complete on time without any litigations or Refund me full amount with interest. | AUTHORITY | 18/10/2022 |
| Navaneeth Murali vs HI LIFE VENTURES PVT LTD., | Builder is not taking initiative to resolve the double registration issue and not communicating regarding possession date. I need my money back with the bank interest | AUTHORITY | 18/10/2022 |
| Subrat Mohanty vs HI LIFE VENTURES PVT LTD., | I need my money back with interest. | AUTHORITY | 18/10/2022 |
| Aseem Tiwari vs HI LIFE VENTURES PVT LTD., | As Builder is unresponsive on resuming construction and possession date. I am seeking the full return of amount with Bank interest. | AUTHORITY | 18/10/2022 |
| Vikash Singh vs HI LIFE VENTURES PVT LTD., | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest and compensation | AUTHORITY | 18/10/2022 |
| Rejulal Sarada Narayanan vs HI LIFE VENTURES PVT LTD | Seeking RERA help to start the construction at the earliest in full fledge and no stoppage in between until completion with all amenities as per agreement. Or I need my money back with bank interest. | AUTHORITY | 18/10/2022 |
| Satyam Das vs HI LIFE VENTURES PVT LTD., | Resolve dual agreement issue of my flat A-801 | AUTHORITY | 18/10/2022 |
| ABHINANDAN SRIVASTAVA vs HI LIFE VENTURES PVT LTD | Compensation and Delivery of my Flat. | AUTHORITY | 18/10/2022 |
| SRIVIJAY MAVURI vs HI LIFE VENTURES PVT LTD., | I need a full refund along with interest. | AUTHORITY | 18/10/2022 |
| Chaitanya Kumar vutla vs HI LIFE VENTURES PVT LTD., | Timely delivery of project, if further delayed REFUND OF INVESTMENT with INTEREST | AUTHORITY | 18/10/2022 |
| B N SARAN KUMAR vs HI LIFE VENTURES PVT LTD. | Completion of Flat and providing compensation for the loss | AUTHORITY | 18/10/2022 |
| ANIL KUMAR REBBA vs HI LIFE VENTURES PVT LTD | Construction should start and complete on time without any litigations | AUTHORITY | 18/10/2022 |
| Prakash Kumar vs HI LIFE VENTURES PVT LTD., | We request the RERA authority to intervene and help us in resolving the double sale and stopped construction issues. Please also monitor the builder for malpractices. | AUTHORITY | 18/10/2022 |
| Bhargavi Sharma M vs HI LIFE VENTURES PVT LTD., | The builder is mentally and financially harassing us. He has not developed a transparent communication with me as a buyer. No clarity on possession date . I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| RAJKUMAR BISWAL vs HI LIFE VENTURES PVT.LTD | Please look into the matter quickly and refund my amount paid to builder with interest (amount given by me and bank) | AUTHORITY | 18/10/2022 |
| ANURAG PRIYADARSHI vs HI LIFE VENTURES PVT LTD., | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| ALAVALA VIDYASAGARAREDDY vs HI LIFE VENTURES PVT LTD | Return of amount and compensation | AUTHORITY | 18/10/2022 |
| R V SATISH BABU vs HI LIFE VENTURES PVT LTD., | Refund of amount and compensation | AUTHORITY | 18/10/2022 |
| Muthukumar vs HI LIFE VENTURES PVT LTD., | builder is mentally harassing by not communicating any resolution not clarity on possession date. I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| Jeyakumar Solaiappan vs HI LIFE VENTURES PVT LTD., | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest. | AUTHORITY | 18/10/2022 |
| Hansika Singh vs HI LIFE VENTURES PVT LTD., | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| SAMBIT SAHOO vs HI LIFE VENTUES PVT.LTD. | refund the paid amount with interest. | AUTHORITY | 18/10/2022 |
| Raja Nepolion Nandy vs HI LIFE VENTURES PVT LTD., | Return of money with bank interest. | AUTHORITY | 18/10/2022 |
| Bezawada Vinod vs HI LIFE VENTURES PVT LTD., | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 18/10/2022 |
| VISWANATHA REDDY K vs HI LIFE VENTURES PVT LTD | Refund of the entire amount alongwith interest paid to banks till date | AUTHORITY | 18/10/2022 |
| NIRAN N S vs M/S HI LIFE VENTURES PRIVATE LIMITED & OTHERS | Refund of entire contribution of Rs. 10,71,600/- along with RERA prescribed rate of interest. Refund of loan disbursed amount of Rs. 34,82,000, along with RERA prescribed rate of interest. | AUTHORITY | 18/01/2024 |
| SAMPATH KARRI vs M/S HI LIFE VENTURES PRIVATE LIMITED & OTHERS | Refund of entire contribution of Rs. 11,00,000/- along with RERA prescribed rate of interest. Refund of loan disbursed amount of Rs. 34,96,400 along with RERA prescribed rate of interest. | AUTHORITY | 18/01/2024 |
| Ashok Kumar N vs M/S HI LIFE VENTURES PRIVATE LIMITED & OTHERS | Refund of entire contribution of Rs. 3,50,000/- along with RERA prescribed rate of interest. Refund of loan disbursed amount of Rs. 28,44,458/- along with RERA prescribed rate of interest. | AUTHORITY | 18/01/2024 |
| BAKKAIAH MADIPALLI vs M/S HI LIFE VENTURES PRIVATE LIMITED & OTHERS | Refund of entire contribution of Rs. 12,00,000/- along with RERA prescribed rate of interest. Refund of loan disbursed amount of Rs. 22,02,176/- along with RERA prescribed rate of interest. | AUTHORITY | 18/01/2024 |
| GANESH MALLA vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 17/10/2025 |
| MADHAV MOGER vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date, i want my money back with bank interest | AUTHORITY | 17/10/2025 |
| Ashish Kumar Jha vs HI LIFE VENTURES PVT LTD | Since I booked in Feb 2018, I mentally hrassed and builder is not communicating anything. I want moneyback with interest. | AUTHORITY | 17/10/2025 |
| Karunesh Kumar vs HI LIFE VENTURES PVT LTD | the builder is mentally harassing by not communicating any resolution nor clarity on possession date,we want our money back with bank interest, | AUTHORITY | 17/10/2025 |
| PAVAN KUMAR GORTHI vs HI LIFE VENTURES PVT LTD | Cancellation of Dual sale agreement or Refund of the entire amount along with interest paid to banks till date | AUTHORITY | 17/03/2025 |
| DURI GOPALAKRISHNA vs HI LIFE VENTURES PVT LTD | Cancellation of Dual sale agreement or Refund of the entire amount along with interest | AUTHORITY | 17/03/2025 |
| AKELLA VENKATESWAR RAO vs HI LIFE VENTURES PVT LTD | Resume the work immediately and deliver the posession at the earliest or refund the entire amount paid till date along with interest. | AUTHORITY | 17/03/2025 |
| K V RAGHAVA vs HI LIFE VENTURES PVT LTD | Cancellation of dual sale agreement (or) refund of the entire amount along with interest | AUTHORITY | 16/10/2025 |
| sridhar sammeta vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 16/10/2025 |
| B N B K MAHANKUD vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution, no clarity on the project completion. I want my money back with bank intrest | AUTHORITY | 16/10/2025 |
| YALALA RAVI KUMAR vs HI LIFE VENTURES PVT LTD | As there is no communication from M/s Hi LIfe Ventures Pvt Ltd in spite of several phone calls & Emails (which were not replied) I seek relief from RERA by REFUND OF FULL AMOUNT WITH INTEREST | AUTHORITY | 16/10/2025 |
| HILIFE GREENS APARTMENT COOPERATIVE SOCIETY LIMIITED vs HI LIFE VENTURES PVT LTD | Allow the allottees to complete the project by taking over the project and allow to recover the funds misappropriated / swindled by the Respondents from the project | AUTHORITY | 16/01/2025 |
| Mayank Srivastava vs HI LIFE VENTURES PVT LTD | As i do not intend to withdraw from this project, hence i must be paid an interest for every month of delay for use of money till possession is given according to provision given in Sec 18 Rera Act | AUTHORITY | 15/10/2025 |
| Naveen Gajula vs HI LIFE VENTURES PVT LTD | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest. | AUTHORITY | 15/10/2025 |
| Srikant Madhavan vs HI LIFE VENTURES PVT LTD | Refund of amount including interest or to direct the builder to construct the flats without any further delay under supervision of a learned committee including buyers as per earlier promised plan. | AUTHORITY | 15/10/2025 |
| Dr Himagiri Gedela vs HI LIFE VENTURES PVT LTD | I Request RERA to intervene and arrange for Refund of full amount with interest | AUTHORITY | 15/10/2025 |
| PANKAJ GUPTA vs HI LIFE VENTURES PVT LTD | As there is no communication from builder in spite of several attempts, i seek relief from RERA by Full Refund of Amount with interest and refund of amount spent for various other follow ups. | AUTHORITY | 15/10/2025 |
| JANGAM BHASKARA RAO vs HI LIFE VENTURES PVT LTD | As there is no communication from M/S Hilife Ventures Pvt. Ltd., inspite of several phone calls and emails (which were not replied) I seek relief from RERA by REFUND OF FULL AMOUNT WITH INTEREST. | AUTHORITY | 15/10/2025 |
| RAMAKRISHNA CHALLAPALLI vs HI LIFE VENTURES PVT LTD | As there is no communication from M/S Hilife Ventures Pvt. Ltd., in spite of phone calls and emails by buyers (which were not replied) I seek relief from RERA by REFUND OF FULL AMOUNT WITH INTEREST. | AUTHORITY | 15/10/2025 |
| SATEESH KUMAR KOTLA vs HI LIFE VENTURES PVT LTD | FULL REFUND OF MY MONEY PAID TO BUILDER DIRECTLY AT THE TIME OF SALE AGREEMENT AND THROUGH BANK LOAN WITH INTREST | AUTHORITY | 14/10/2025 |
| SANTHOSHA RAO SURVE M vs HI LIFE VENTURES PVT LTD | The builder is mentally harrassing by not communicating any resolution nor clarity on possession date nad construction start. I want full amount refund with 2% interest | AUTHORITY | 14/10/2025 |
| Tirumalesh Palleri vs HI LIFE VENTURES PVT LTD | Resolve this Conflict of ownership of the Flat F-701 | AUTHORITY | 13/10/2025 |
| Narayan Jee vs HI LIFE VENTURES PVT LTD | We request the Rera Authority to intervene and help in resolving the double agreement done to my Flat F-504 and help me in getting the flat as soon as possible. | AUTHORITY | 13/10/2025 |
| PALLAB KAR vs HI LIFE VENTURES PVT LTD | Fully mentally and financially harassed.Need immediate action to complete the project without any deviation in original sanction plan or refund my money with interest and compensation. | AUTHORITY | 13/10/2025 |
| sridhar malla vs HI LIFE VENTURES PVT LTD | Complete refund of all my money at 12 percent interest and 10,00,000 rupees as compensation for my home loan and rent damages | AUTHORITY | 13/10/2025 |
| B S SANKARA RAO vs HI LIFE VENTURES PVT LTD | Builder is mentally harassing by not communicating any resolution nor clarity on possession date. I WANT MY MONEY BACK WITH BANK INTEREST. | AUTHORITY | 13/10/2025 |
| Sunil kumar Allu vs HI LIFE VENTURES PVT LTD | Compensation & completion of project | AUTHORITY | 13/10/2025 |
| CHIRANJEEVI REDDY CHUKKA vs HI LIFE HOMES | The builder is mentally harassing by not communicating any resolution nor clarity on possession date. I want my money back with bank interest | AUTHORITY | 12/09/2023 |
| SHEELA GUPTA vs HI LIFE VENTURES PVT. LTD. | Help fixing the double registration issue and make project back on track else please refund my money | AUTHORITY | 12/07/2023 |
| Rahul Rai vs HI LIFE VENTURES PVT LTD | we seek for refund and compensation for mental harassment | AUTHORITY | 11/11/2025 |
| Rakesh Kumar vs HI LIFE VENTURES PVT LTD | Cancellation of Dual sale agreement or Refund of the entire amount along with interest paid to banks till date | AUTHORITY | 11/11/2025 |
| Shrikant Ramesh Dudhe vs HI LIFE VENTURES PVT LTD | As there is no communication from M/s Hi LIfe Ventures Pvt Ltd in spite of several phone calls & Emails (which were not replied) I seek relief from RERA by REFUND OF FULL AMOUNT WITH INTEREST | AUTHORITY | 11/11/2025 |
| SIGINAM KALYANA CHAKRAVARTHY vs HI LIFE VENTURES PVT LTD | 1) Construct as per the approved plan in next one year. 2)Cancellation of sale agreement which builder made with other party. 3) Repay the loan taken from Reliance Home Finance. | AUTHORITY | 11/11/2025 |
| Chittabathina Mourya Chandra vs HI LIFE VENTURES PVT LTD | Builder is mentally harassing by not communicating any resolution not clarity on possession date. I want my money back with bank interest | AUTHORITY | 11/11/2025 |
| Srirama Santosh Sreepada vs HI LIFE VENTURES PVT LTD | Work with the builder to resume work and complete the project without any deviation | AUTHORITY | 10/11/2025 |
| MADHURI K vs HI LIFE VENTURES PVT LTD | REQUEST TO CHECK FOR PROJECT DEADLINES AND DEVIATIONS. INCASE OF DISCREPENCIES I NEED COMPENSATION | AUTHORITY | 10/11/2025 |
| Shreyan Ghosh vs HI LIFE VENTURES PVT LTD | 1. Finish the project as per actual plan. 2. Full refund with penalty if any deviation from plan. 3. Compensation for the rent paid unnecessarily by tenant due to negligence in delivery of flat. | AUTHORITY | 10/11/2025 |
| Vaibhav Anilkumar Gupta and Anjali Raj Rana vs HI LIFE VENTURES PVT LTD | I need my flat for which i am paying EMI from SBI | AUTHORITY | 10/11/2025 |
| N ASWANTH KUMAR vs HI LIFE VENTURES PVT LTD | Interest on delayed period | AUTHORITY | 10/11/2025 |
| PURUSOTTAM KUMAR vs GREEN VIEW KORAMANGALA | resolution of this matter asap or money refund with full principle and interest paid by me and the bank | AUTHORITY | 09/11/2022 |
| RAJIV RANJAN vs HI LIFE GREENS | I request to you please have a look in this matter and resolve it as soon as possible as this give financial pain, or i request builder to refund the amount(Principle + interest) | AUTHORITY | 09/11/2022 |
| ASHISH KUMAR vs GREEN VIEW KORAMANGALA | Quick Action against builder : And refund my complete money given to the builder and interest paid to the bank | AUTHORITY | 09/11/2022 |
| PRAKHAR JAISWAL vs HI LIFE GREENS | Need my money refunded with bank interests | AUTHORITY | 09/11/2022 |
| K S S SRIHARI vs HI LIFE GREENS | 1. Timely Delivery of the Flat, 2. Furnishing of accurate project details | AUTHORITY | 09/11/2022 |
| VINIT KUMAR vs HI LIFE GREENS | Full refund including amount disbursed ,TDS, bank EMI interest paid till refund date | AUTHORITY | 09/11/2022 |
| SAMBIT CHAKRABORTY vs HI LIFE GREENS | 1. Push to start the construction 2. Compensation for delay | AUTHORITY | 09/11/2022 |
| DEV KANT KUMAR vs GREEN VIEW KORAMANGALA | We request the RERA authority to intervene and help us in resolving the double sale agreement and delivery issues. The builder has not been compliant to the signed agreement. Kindly help us. | AUTHORITY | 09/11/2022 |
| AJITH K P vs GREEN VIEW KORAMANGALA | Refund of money paid till now (Rs. 49,73,538) along with interest and penalty. | AUTHORITY | 09/11/2022 |
| IZAZAHMED vs GREEN VIEW KORAMANGALA | The cancellation of 2nd sale agreement with other person | AUTHORITY | 09/11/2022 |
| ANITH K.P. vs HI LIFE GREENS | Project to be completed as per agreement, clear Double registration and no deviation to be executed. | AUTHORITY | 09/11/2022 |
| HAMENT CHOUDHARY vs HI LIFE VENTURES PVT. LTD. | I want refund with interest as i have lost faith in the builder and don't expect him to deliver Flat in safe and livable quality. | AUTHORITY | 06/07/2023 |
| Naga Sudhakar Grandhe vs HI LIFE VENTURES PVT LTD | yes | AUTHORITY | 06/04/2026 |
| Venkata Subbarao Konakalla vs HI LIFE VENTURES PVT LTD | Progress of construction and get the details | AUTHORITY | 06/04/2026 |
| KRISHNA KIREETI KOMPELLA vs HI LIFE VENTURES PVT LTD | Therefore, your kind intervention is very much solicited to help all the customers/vendees, who are in need of your official support as such we come out from this mess of uncertainty and insecurity. | AUTHORITY | 06/04/2026 |
| Rajnish Kumar vs HI LIFE VENTURES PVT LTD | Please help to get the work started and help in getting update from builder | AUTHORITY | 06/04/2026 |
| Siginam Venkata Madhan Mohan vs HI LIFE VENTURES PVT LTD | Resume contruction and complete the project as soon as possible. Give commitment in writing to refund my money with interest if the project is not completed in the next 1 year. | AUTHORITY | 06/04/2026 |
| Mulaparthy Nirmal Kumar vs HI LIFE VENTURES PVT LTD | Refund of my total paid money with interest from M/s Hi Life Ventures Pvt. Ltd., since the project is stalled, possession delayed and the property sold to me is under auction due to builder fault. | AUTHORITY | 06/04/2026 |
| Swachchatoya Banerjee vs HI LIFE VENTURES PVT LTD | Double registration cancelled immediately with T.Rajkumari and hand over my Flat E705 to me with compensation as per agreement with builder in time. | AUTHORITY | 06/02/2026 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (107 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/200822/0006369 22-08-2020 | fraudulent : Registered flat c702 sold to some other person without my knowledge | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/200929/0006370 29-09-2020 | Fraud - The flat registered on my name (B-702) is sold to third party without my consent/knowledge. | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/200823/0006401 23-08-2020 | Fraud(420): Sold my flat B602 to other person without my knowledge. | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/201002/0006472 02-10-2020 | Promoter made dual sale agreement with third party | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/201001/0006718 01-10-2020 | Case of fraud and multiple issues with the builder | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/201015/0006864 15-10-2020 | Fraudulent : Registered flat C602 sold to some other person without my knowledge | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/UR/201110/0006883 10-11-2020 | My flat E705 sold to other agency. | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
| CMP/201116/0007065 16-11-2020 | Registered Sold Flats to another party. Construction Delays | HI LIFE GREENS | DISPOSED AUTHORITY FULLBENCH |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Hi Life has 3 other K-RERA-registered projects in our records. 3 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a higher delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹23.4 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: ICICI Bank Marathalli (IFSC ICIC0001417, a/c …2498). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 5 km |
| Whitefield IT hub | 5 km |
| Electronic City | 12 km |
| MG Road / city centre | 14 km |
| Outer Ring Road / Manyata | 17 km |
| Kempegowda Int'l Airport | 30 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
Should you buy in HI LIFE GREENS?
This page is the free K-RERA filing summary. The full RERA Property Intelligence Report gives you buyer-complaint history, regulatory flags, builder track record, the official unit register, land title, NOCs, and (where the sanctioned plans support it) room-by-room unit data and an annotated site plan. See a real one first:
Sample: Sobha Silicon Oasis → · browse all sample reports →
Compliance Report · ₹999
The regulator’s filing record, read · 1 working day
Scan with any UPI app to pay · quietlist@kotak
Unit Guidance Report · ₹2,999
Everything, down to which unit · 1 working day
Not useful to your decision? Full refund — no questions asked.
Scan with any UPI app to pay · quietlist@kotak
Paying from outside India? Pay $15 (Compliance) or $39 (Unit Guidance) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes.
Built by Hi Life.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.