RERA Property Intelligence Report · Preview
Vaishnavi Infrastructure and Properties · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/200310/003332
Report coverage
K-RERA registry & builder-record report
What this report covers
To confirm directly with the builder
🔒 The verdict & buyer playbook · Compliance report
The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 4 | Total inventory registered with K-RERA. |
| Official carpet area | 8,552 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 3,959 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.19 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 1 | Official tower/wing count in the K-RERA detail page. |
| Project start date | 10-12-2019 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| Commercial Office Space | 4 | 100% | 8,552 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| Vaishnavi Sovereign | 4 | 4 | 0 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 4 official flat/unit rows, matching the 4 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| COMMERCIAL | 4 | 1,939.0-2,331.0 sqft | 0.0 sqft | 0 (4 with 0) |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| Vaishnavi Sovereign | 4 | 1,939.0-2,331.0 sqft | 0.0 sqft | 0 (4 with 0) |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| Unit GF | Vaishnavi Sovereign | 1 | COMMERCIAL | 1,939.0 sqft | 0.0 sqft | 0 |
| Unit FF | Vaishnavi Sovereign | 2 | COMMERCIAL | 1,948.0 sqft | 0.0 sqft | 0 |
| Unit SF | Vaishnavi Sovereign | 3 | COMMERCIAL | 2,331.0 sqft | 0.0 sqft | 0 |
| Unit TF | Vaishnavi Sovereign | 4 | COMMERCIAL | 2,331.0 sqft | 0.0 sqft | 0 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Unit-by-unit guidance · Unit Guidance report
Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.
🔒 Full records — land title, amenities paperwork & document catalog · Compliance report
The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.
No litigation declared on this project's K-RERA filing.
1 of 17 compliance document slots are filed as Not Applicable; the remaining 16 slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 30 Jun 2023, extended (Covid Extension) to 30 Mar 2024 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | Balan and Nambisan Architects | - | 2000 | 18th Main, HAL 2nd Stage |
| Contractor | ARVIND AND RAJAN CONSTRUCTIONS | - | 2012 | 40TH CROSS, JAYANAGAR 8TH BLOCK |
| Structural engineer | DINESH BELLAD | - | - | - |
Vaishnavi has 27 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Vaishnavi Infrastructure”) (average reported construction progress 78%). 16 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹1032.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: ICICI Bank Commissariat Road (IFSC ICIC0000002, a/c …8788). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.
The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 2 km |
| MG Road / city centre | 9 km |
| Electronic City | 9 km |
| Whitefield IT hub | 10 km |
| Outer Ring Road / Manyata | 14 km |
| Kempegowda Int'l Airport | 30 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
Free · Watch this project
We'll email you when this project's RERA record changes.
Built by Vaishnavi Infrastructure. View Vaishnavi Infrastructure's full track record →
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.
Own a unit in Vaishnavi Sovereign?
Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.
Last checked against the RERA register: 27 Jul 2026