RERA Property Intelligence Report · Preview

YAMUNA SKY CITY

YAMUNA HOMES AND DESIGN · · K-RERA PRM/KA/RERA/1257/334/PR/171023/006331

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
2
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

299
Registered units
₹433.0 Cr
Est. construction cost
Units profiled
39
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units299Total inventory registered with K-RERA.
Official carpet area41,443 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area92,024 sqmUseful scale context when comparing density and project cost.
Registered land area14,596 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.757Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed403 total (403 covered, 0 open) — 1.35 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberA4/BA-50/2022-23 (160614)Use this to match the sanctioned drawing set shown by the builder.
Plan approval date05-05-2023
Project start date01-08-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
CLUB HOUSE10%634 sqm
3 BHK6221%7,650 sqm
5 BHK72%3,794 sqm
4 BHK4816%13,151 sqm
BANQUET HALL10%565 sqm
2 BHK18060%15,649 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
YAMUNA SKY CITY60299403197.57 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 299 official flat/unit rows, matching the 299 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK18070.5-95.5 sqft0.2-0.2 sqft180
3 BHK62121.4-125.5 sqft0.3-0.3 sqft62
4 BHK48166.4-374.0 sqft0.4-1.0 sqft96
5 BHK7542.0 sqft1.3-1.5 sqft21
COMMERCIAL2565.0-634.0 sqft0.0 sqft0 (2 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
YAMUNA SKY CITY29970.5-634.0 sqft0.0-1.5 sqft359 (2 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
FLAT No. - 1YAMUNA SKY CITY32 BHK70.5 sqft0.2 sqft1
FLAT No. - 2YAMUNA SKY CITY32 BHK85.0 sqft0.2 sqft1
FLAT No. - 3YAMUNA SKY CITY32 BHK95.5 sqft0.2 sqft1
FLAT No. - 4YAMUNA SKY CITY33 BHK121.4 sqft0.3 sqft1
FLAT No. - 5YAMUNA SKY CITY33 BHK125.4 sqft0.3 sqft1
FLAT No. - 6YAMUNA SKY CITY32 BHK91.8 sqft0.2 sqft1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~139 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a mid-scale project — 299 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 403 parking spaces for 299 homes (~1.3 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~0 sqft per home; across all 299 homes that is ~0% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

8 of 32 compliance document slots are filed as Not Applicable; the remaining 24 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

10 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantKESHAVA N BALLAKURAYA0290602013Dakshina Kannada, Karnataka - 575003
EngineerSANTHOSH KUMAR SHETTYMNG-BL-10986/23-242002Dakshina Kannada, Karnataka - 575004
ArchitectPETER MASCARENHASMNG/BL/11272/23-242018Dakshina Kannada, Karnataka - 575001
ContractorYAMUNA HOMES AND DESIGN PVT LTD-2016Dakshina Kannada, Karnataka - 575002

Builder track record

RERA filing

Yamuna Homes has 2 other K-RERA-registered projects in our records. 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹18.30 Cr collected from buyers, ₹69.25 Cr withdrawn from the project's escrow account. This quarter the escrow withdrawal (₹69.25 Cr) exceeded buyer collections (₹18.30 Cr) — worth asking the builder to reconcile against certified construction milestones, which is what RERA requires escrow draws to track.

Construction progress14% → 19% (+5 pts)
Units sold/booked as registered27/299 (9%)
Buyer collections in available QPRs₹26.31 Cr
Escrow withdrawals in available QPRs₹120.82 Cr (4.59x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹144.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: STATE BANK OF INDIA SME Branch, Mangalore IFSC Code : SBIN0004118 Pin Code : 575003. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~4 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Outer Ring Road / Manyata4 km
MG Road / city centre12 km
Kempegowda Int'l Airport15 km
Bellandur–Marathahalli belt17 km
Whitefield IT hub18 km
Electronic City26 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Yamuna Homes.
Yamuna Homes has 3 projects registered in Bangalore.

Other projects by this builder in Bangalore

Other RERA-registered projects in Yelahanka

Major developers building in Yelahanka

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.