RERA Property Intelligence Report · Preview

Parkwest - Maple - Tower 4

Relationship Properties · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/171015/000277

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
10
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

552
Registered units
₹303.3 Cr
Est. construction cost
Units profiled
42
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units552Total inventory registered with K-RERA.
Registered land area22,052 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI0.161Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed763 total (50 open) — 1.38 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date25-10-2016

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Refer Annexure - Specification00 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Maple31552763-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 552 official flat/unit rows, matching the 552 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK21681.0-84.9 sqm36.0-41.0 sqm298
3 BHK206105.4-122.3 sqm49.4-56.5 sqm286
1 BHK12437.7-39.0 sqm17.6-19.2 sqm173
4 BHK6188.5-193.1 sqm86.7-94.4 sqm6

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Maple55237.7-193.1 sqm17.6-94.4 sqm763
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A1Maple01 BHK39.0 sqm18.7 sqm2
A2Maple01 BHK37.7 sqm18.6 sqm2
A3Maple02 BHK83.5 sqm38.5 sqm2
A4Maple03 BHK106.3 sqm51.7 sqm2
A5Maple03 BHK105.4 sqm50.6 sqm2
A6Maple02 BHK82.8 sqm38.5 sqm2

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~915 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 552 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 763 parking spaces for 552 homes (~1.4 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~40 sqm per home; across all 552 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

12 of 38 compliance document slots are filed as Not Applicable; the remaining 26 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2020, extended (Extension) to 31 Mar 2023 — both dates have passed with no OC on file. The extension on file was granted on 05 Oct 2021 (K-RERA extension no. EX/PRM/KA/RERA/1251/310/PR/211005/000277) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

2 K-RERA orders on this project (PROJECT EXTENSION) — read the order copies on the K-RERA portal.

K-RERA complaint orders (264 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
YOGESH MANOHAR KULKARNI & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED , ETA STAR INFOPARK , ETA KARNATAKA ESTATES LIMITED , ETA CONSTRUCTIONS (INDIA) LIMITEDCompensation for the duration between promised date and actual date for additional home loan EMIs I am forced to pay.AUTHORITY30/12/2023
PRADEEP SINGHVI & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCOMPENSATION FOR DELAY IN POSSESSIONAUTHORITY30/12/2023
DEBOMITRA SINHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITED, MR. ANAND RAOCompensation for delay till delivery and mis-selling. Because I would not have booked had I known that deliver date was Dec 2020. Faster delivery. As I am having to pay both Rent as well as EMI.AUTHORITY30/10/2023
SENTHIL KUMAR MK vs RELATIONSHIP PROPERTIES PRIVATE LIMITED., & OTHERS.Monthly compensation with 18% rate & monthly rental for further delayAUTHORITY30/10/2023
NILESH N CHAMBARIA & SAILESH N CHAMARIYA vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation for delay on positionAUTHORITY29/11/2024
KRISHNARAJ GOPALAPPA BONAGIRI vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSPossession and interest on delay periodAUTHORITY29/11/2024
DHANANJAYA AS, POORNIMA vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSAssistance in addressing the complaintAUTHORITY29/11/2023
AAKASH A CHAJJED vs Relationship PropertiesCompensation in form Interest and Penalty.AUTHORITY29/05/2026
K B CHANNAPPA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHence it is respectfully prays before the tribunal to direct the respondent to hand over the possession of the property as early as possible and further direct them to pay hectic compensation for theAUTHORITY28/09/2022
PRAVEEN KUMAR JAIN & DEEPIKA DEVI JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDcomponsation and interest requestAUTHORITY26/07/2023
KIRAN KUMAR PADALA, BHAMATHI H PAI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with 18% per annum interest until date. Monthly comp with 18% rate and monthly rental for further delay. No RERA extensions, and new tower registration should be stopped.AUTHORITY26/07/2023
PRITESH SEDANI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRequest the builder not to deliver the funds of Maple project to other projects. Since 70% cost has been paid to builder , the builder should compensate.AUTHORITY26/07/2023
ARUN SCARIA & DEEPA TREESA SABU vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRequest you to please direct the builder to compensate us for breach of agreement and the inordinate delay in delivery.AUTHORITY26/07/2023
AJITH BOHARA vs pARKWEST tOWER -41. DIRECT THE RESPONDENT TO REFUND THE ENTIRE SALE CONSIDERATION AMOUNTS PAID BY THE COMPLAINANT TO THE RESPONDENT TILL DATE; 2. DIRECT THE RESPONDENT TO PAY AN INTEREST OF 18% P.A ON THE TOTAL AMOUNTAUTHORITY25/08/2025
MANOHAR MN vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1. Mandate the builder to deliver by Dec 2020. 2. Not to divert the funds of Maple project to other projects. 3. Since 90% of apartment cost has been paid to builder, the builder should compensateAUTHORITY25/06/2022
SREENIVASULU GANDHAVALLA vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1. Mandate the builder to deliver by Dec 2020. 2. Not to divert the funds ofMaple project to other projects. 3. Since 90% of apartment cost has been paidto builder, the builder should compensateAUTHORITY25/06/2022
KANCHANA VASUDEVAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation from the Builder for the delayAUTHORITY25/06/2022
ANU ASHOK vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay , as their agreement was one sided, they have said that they would charge us Interest @18 % if there would be a delay in making payments , this should apply to them also.AUTHORITY25/06/2022
ADARSH BARADI REDDY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay in completion and delivery of the apartmentAUTHORITY25/06/2022
HARIPRIYA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDBuilder has to give rebate on the last installment amount to buyers at the time of registration. Allow buyers to do interior works immediately after Regn w/o waiting for OC.AUTHORITY25/06/2022
MANJULA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31 Dec 2019.AUTHORITY25/06/2022
PRAVEEN KUMAR PENUMATSA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDWe request compensation due to delayed handover and also exert pressure in finishing the works at earliest possible as they had committed a new date June 2021AUTHORITY25/06/2022
KIRAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDwe need compensation & interest on delay of flat for 1.5 years.AUTHORITY25/06/2022
SUNIL SURENDRA PAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation calculated from 31st DEC 2019 till the time of receiving complete OC, as per RERA provisions.AUTHORITY25/06/2022
KARTHIK SHETTY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHandover of flat by June'21, No compromise in quality & amenities, compensation for the delay as per RERAAUTHORITY25/06/2022
GUNA THANTRY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay in handing over and expediting the handing over of the FlatAUTHORITY25/06/2022
ASHOK SALECHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDYESAUTHORITY25/06/2022
RASHMI SRINIVASAIAH vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay with delivery of all promised facilities or Refund of the entire amount with prevailing interest rateAUTHORITY25/06/2022
VENKATESH SAKA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation Amount for the delay and Exact handover date of our flat.AUTHORITY25/06/2022
MANOJ KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDcompensation & fast delivery of the flatAUTHORITY25/06/2022
KISHOREDUTH S BANAVAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDEarliest delivery and possession of the flat and compensation thereof for the delay in deliveryAUTHORITY25/06/2022
PANKAJ MEHTA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDcompensation for delayed period and delivery at the earliestAUTHORITY25/06/2022
SUBIR KUMAR PAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRefund of payment with interest OR delivery of apartment with full compensation for delayAUTHORITY25/06/2022
SNEHA SURESH KULKARNI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation from the builder for the delayed project and request RERA to stop giving the builder extensions. Request RERA to pressurise builder to handover the flat as soon as possibleAUTHORITY25/06/2022
KAILASH KUMAR B JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRequest RERA to support to inspect the progress of construction & push builder to commit for deliver due date of flat, no further extension of by RERA . Commitment of Compensation also needed.AUTHORITY25/06/2022
AVANI BAROT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDAgreement to Provide Compensation as per Sale Deed Signed with BuilderAUTHORITY25/06/2022
SUJITH CHENGALATH vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay and also quick delivery of the flatAUTHORITY25/06/2022
SANTHOSHA KUMAR BHANDARY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for delay and pocession of flatAUTHORITY25/06/2022
NEERAJA SRINIVAS vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREFUND with interest from the builderAUTHORITY25/06/2022
RAHUL SAHU vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY25/06/2022
IYYAPPA M P vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDrera should interfere and help in completion of the project at the earliest and get us the required compensation.AUTHORITY25/06/2022
NEERAJA SRINIVAS vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREFUND WITH INTEREST / COMPENSATE FOR DELAYAUTHORITY25/06/2022
SUBBA RAO SUMANAM vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDFAIR COMPENSATION FOR DELAY AND EARLY HANDOVER OF FLAT.DEVELOPER IS OBTAINING REPEATED RERA EXTENTIONS AND CHEATING BUYERSAUTHORITY25/06/2022
SUBHASHINI DEVI KUNKA RAMPRASAD vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation of Interest payment for the delay as per Guidelines.AUTHORITY25/06/2022
ANUKOOL JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHuge delay in Construction completion so reqire compensationAUTHORITY25/06/2022
ABHISHEK BANTHIA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & House rent with 18% per anum interest till date.Monthly compensation with 18% rate & monthly rental for further delay.No RERA extension & new Tower register withot complainant consentAUTHORITY25/06/2022
OM PRAKASH BANTHIA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & House rent with 18% per anum interest till date.Monthly compensation with 18% rate & monthly rental for further delay.No RERA extension & new Tower register without complainant consentAUTHORITY25/06/2022
NITESH JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consentAUTHORITY25/06/2022
DEEPAK CHAUDHARY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRefund of amount with interestAUTHORITY25/06/2022
K SUBASH RAO vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREFUND WITH INTEREST/COMPENSATE FOR DELAYAUTHORITY25/06/2022
PANKAJ MEHTA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDTo instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fitAUTHORITY25/06/2022
HIMANSHU PURI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation of my entire interest on home loan paid from December, 2019 along with rent. Refund of extra amount taken considering preferential location charges. Timely delivery of the project.AUTHORITY25/06/2022
DEEPAK KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY25/06/2022
DR SHYLESH KUMAR B S vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDI REQUEST YOUR GOOD OFFICE TO DIRECT DEVELOPER TO EARLY HANDOVER OF POSESSION OF DULY COMPLETED FLAT IN MY NAME AND PAY INTEREST OF 18% PA FROM THE DATE OF PROMISE TO TILL THE DATE OF ACTUAL HANDOVERAUTHORITY25/06/2022
SANGEETH KUMAR PARVATAM vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDI want to exit the project owing to severe delays and mounting debt. I want full refund of my money with interest.AUTHORITY25/06/2022
DEEPA MEHARWADE vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for delay and hardship caused due to delay in completion of projectAUTHORITY25/06/2022
VIKAS MAHNOT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDwe need compensation for not giving possession till date and paying rent from 2 years of rs 25000 per monthAUTHORITY25/06/2022
SURESH CHANDRA MAHNOT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDwe need compensation for not giving possession till date and paying rent from 2 years of rs 40000 per monthAUTHORITY25/06/2022
MOHIT MAHNOT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDwe need compensation for not giving possession till date and paying rent from 2 years of rs 45000 per monthAUTHORITY25/06/2022
NALINI D C vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1. Possession of Unit immediately. 2. Compensation for the delay in handing over and Mental agony .AUTHORITY25/06/2022
HITESH PALRECHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation on Interest amount and Penalties as per the normsAUTHORITY25/06/2022
DEEPAK MAHESHWARI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation shall be paid on the amount paid & nominal rent with 18% per anum till date. Also this shall be paid beyond 30th Dec on the said amount monthly to me as I am paying EMI.AUTHORITY25/06/2022
SANMATHI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDto grant compensation as stated aboveAUTHORITY25/06/2022
RAGHAVENDRA KAPU vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDFAIR COMPENSATION FOR DELAY AND EARLY HANDOVER OF FLAT.DEVELOPER IS OBTAINING REPEATED RERA EXTENTIONS AND CHEATING BUYERSAUTHORITY25/06/2022
NARAYANA RAJU SESHAPPA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDplease help in getting Compensation for delay in handing over i.e., interest + rent lost due to delay. Please help me in getting the possession of the Flat by Apr2022/May2022.AUTHORITY25/06/2022
RAJAT NAHATA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDQuick Completion and handover , Compensation and Interest for collecting money through fast payment schemeAUTHORITY25/06/2022
ASHWIN KUMAR YATHIRAJ vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation as per the current RERA rules and commitment to deliver within next 6 months.AUTHORITY25/06/2022
SOMA VIDYA SAGAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for furtherdelay. No RERA extensions & new tower register without complainants consent.AUTHORITY25/06/2022
STEPHEN.D vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDQuick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the ProjectAUTHORITY25/06/2022
N DURGARAO vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation @18% per annum from December 2019 to actual possession date. If the delay beyond September 2022, refund with 18% interest from the date of payment to actual refund date.AUTHORITY25/06/2022
SAURABH DESHPANDE vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and rent with 18% interest per annum till date. No further rera extension without complainant's consentAUTHORITY25/06/2022
RITA MUNJANI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCOMPENSASTION & HOUSE RENT WITH 18% PER ANNUM INTERST TILL DATE MONTHLY COMPENSATION WITH 18% RATE & MONTHLY RENTAL FOR FURTHER DELAY NO RERA EXTENSON & NEW TOWER SHOULD NOT LAUNCHEDAUTHORITY25/06/2022
SUMIT KUMAR JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly Comp. with 18% rate & monthly rental for further delay. No RERA Extension & new tower register without complainants consent.AUTHORITY25/06/2022
ASHWIN ANCHALIYA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with 18% per annum interest till date. Monthly comp. With 18% rate and monthly rental for further delay.. no RERA extensions and new tower register without complainants conAUTHORITY25/06/2022
NARENDRA KUMAR RUSTOGI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDQuick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the project so that we can get our homeAUTHORITY25/06/2022
VINAY KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly compensation with 18% rate & monthly rental for further delay. No RERA extensions & new tower to be registered till completionAUTHORITY25/06/2022
LAKSHMI PJ vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY25/06/2022
PARIVAKKAM SUBRAMANIAM RAVICHANDRAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDTo expedite the project completion and commit the compensation for the delayed periodAUTHORITY25/06/2022
NAINA SUHAS KAMAT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPLEASE ENFORCE DELAY COMPENSATION AT 18% INETEST FROM JANUARY 2020 TILL DATE OF POSSESSION TO BE PAID BY RPPL TO WE BUYERS.AUTHORITY25/06/2022
N T SRINIVASAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHandover of flat and payment of compensation for delaysAUTHORITY25/06/2022
JITENDER RAKECHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDReturn of invested amount and compensationAUTHORITY25/06/2022
KAPIL KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY25/06/2022
MAHAVEER MOHANLAL JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay in possessionAUTHORITY25/06/2022
NIRMALA BHANDARI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPlease help me with good compensationAUTHORITY25/06/2022
DEEPAK JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDEXTENTION TO BUILDER BUT DELAYED MORE THEN THATAUTHORITY25/06/2022
UMA WARRIER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1. Compensation/Settlement for the inordinate delay and RERA to ensure no more delay. In the event of further delays, penalty should be increased in terms of compensationAUTHORITY25/06/2022
GEETHA N CHHABRIA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREQUIRE A WRITTEN COMMITMENT REGARDING DELIVERY OF APPARTMENT AND APPROPRIATE COMPENSATION FOR DELAY IN HANDING OVER POSSESSIONAUTHORITY25/06/2022
JITESH SEDANI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelay compensation from the date of actual promised delivery.AUTHORITY25/06/2022
SRINIVASAN SHANKAR RAO vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1) need possession by Sep'22 with all amenities as per agreement 2) compensation for interest payment for the delay. 3) compensation for lost rental opportunityAUTHORITY25/06/2022
H C MALLESHA SWAMY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp, with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complaints consent.AUTHORITY25/06/2022
NAVEEN KUMAR DODEJA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRequesting RERA intervention to seek compensation for the project delay and receive a firm delivery dateAUTHORITY25/06/2022
H D MADAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDExit with full and final settlement with interest of 12 % Pa from first payment made till nowAUTHORITY25/06/2022
VISHWANATH KOLHAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and plus 18% interest on the amount paid by me till the date of possession of the flat. Reimbursement of the rent paid of actual rent paid by me for this period.AUTHORITY25/06/2022
MUKESH KUMAR SOLANKI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delayed apartment delivery and earliest handover of the apartment.AUTHORITY25/06/2022
BHARATH KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with 18 % interest per annum till date. monthly compensation with 185 rate and monthly rental for furtherdelay. No RERA extension and New tower registration without complabAUTHORITY25/06/2022
PRAKASH RAMANATHAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rental seeked with 18% interest per annum till date. Monthly compensation with 18% interest and monthly rental for further delay. No further RERA extensions and no new towersAUTHORITY25/06/2022
ANITHA G S vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay and if further delay then refund with interestAUTHORITY25/06/2022
CHETHANA BV vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDFull refund and compensationAUTHORITY25/06/2022
M JAYARAM SHETTY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDirect the developer to hand over the apartment at the earliest and compensate me for the delay caused, recover interest from the promoter at the prescribed rate.AUTHORITY25/06/2022
MANISH KUMAR JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDQuick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the projectAUTHORITY25/06/2022
KISHORE KUMAR JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDQuick Completion and handover with Appropriate Compensation and Interest. RERA should monitor the projectAUTHORITY25/06/2022
ABDUL BARI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHanding over possession with delayed interestAUTHORITY25/06/2022
VIJAYKUMAR A PATIL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRefund and compensationAUTHORITY25/06/2022
CHAITRA K R vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for delay in delivery of apartmentm MA 1202AUTHORITY25/06/2022
M S BHARATHI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDirection to be given to the Promoter to complete project in all aspect and to pay the delayed interest as per section 18 of RERA Act, 2016AUTHORITY25/06/2022
DR S SUBRAMANYAM vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDirection to be given to the Promoter to complete project in all aspect and to pay the delayed interest as per section 18 of RERA Act, 2016AUTHORITY25/06/2022
GANESH GUPTA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHanding over possession with delayed interestAUTHORITY25/06/2022
CHANDRAKALA JAISWAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHanding over possession with delayed interestAUTHORITY25/06/2022
MANOJ JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDGIVE COMPENSATIONAUTHORITY25/06/2022
DEEPAK SALUNKHE vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with 18% per annum interest till date.AUTHORITY25/06/2022
KUSHAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCOMPENSATION & HOUSE RENT WITH 18% PER ANNUM INTEREST TILL DATE.MONTHLY COMP WITH 18% RATE & MONTHLY RENTAL FOR FURTHER DELAY.NO RERA EXTENTIONS & NEW TOWER REGISTER WITHOUT COMPLAINANTS CONSENT.AUTHORITY25/06/2022
PANKAJ KUMAR MEHTA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHanding over possession with delayed interestAUTHORITY25/06/2022
SHARAD SHYAM vs RELATIONSHIP PROPERTIES PRIV ATE LIMITED & OTHERSDirect Respondent to hand over possession of the Apartment and pay the amount sought for in the ComplaintAUTHORITY24/09/2024
RAJENDRA KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDELAY COMPENSATIONAUTHORITY22/08/2023
PRAVEEN RAJ GOWDA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDa) INR 25,00,000/- as delay compensation with interest @10.5% p.a. from 30.06.2020 till the date of actual handover. b) costs of filing this Complaint.AUTHORITY22/08/2023
Sunil Mehta vs Parkwest - Maple-Tower-4refund of Rs 18,33,193 along with interest at 18 percent per annum till realisationAUTHORITY21/11/2025
ABDUL JABBAR SHAIK vs Parkwest - Maple Tower 4I request this Hon’ble Authority to direct the respondent to pay delay period interest, handing over possession and to obtain occupancy certificate.AUTHORITY21/01/2025
DEEPAK CHAUDHARY, NIDHI CHAUDHARY vs RELATIONSHIP PROPERTIES PVT. LTD.,Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY20/09/2023
PRAKASH KRISHNAN vs RELATIONSHIP PROPERTIES PVT. LTD.,COMPENSATION FOR DELAY FROM jAN-01-2020 AND EARLY COMPLETION AND POSSESSIONAUTHORITY20/09/2023
Abhinav Chawla vs Relationship Properties Private LimitedRefund all payments (including interest & Tax)AUTHORITY20/07/2023
Venkat Parasuraman vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDExit from the agreementAUTHORITY20/07/2023
ARJUN SHETTY & NIVEDITHA SHETTY vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation for Delay or Refund with InterestAUTHORITY20/05/2024
ANBUKKARASU ANNAMALAI vs Parkwest Mapole tower-4Compensation for the loss incurred so far due to this delay.AUTHORITY19/08/2025
SONIA SURESH SRIVASTAVA & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for furthur delay. No RERA extensions & new tower registrations without complaints consentAUTHORITY19/04/2024
RAMESH TEUNRAM PARSANI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date . Monthly comp. with 18% rate & monthly rent for further delay. NO RERA extensions &new tower register without complaints consent.AUTHORITY17/10/2022
Muralidhar Venkataramaniah vs Relationship Properties Pvt Ltd.The “force majeure” impacts me, the owner, a lot more in terms of my financials and mental and physical health. Hence interest on the 90% amount prepaid should be compensated to the owner.AUTHORITY17/04/2025
Jagdish Gujaran vs Relationship PropertiesCompensation with interest on our expenses being incurred for the last 2 years on House Rent and Loan EMI and possession of our property as early as possible.AUTHORITY17/04/2025
Girish Doddaballapur Srinivas vs Relationship PropertiesPayment of compensation at Market rate of 12% and speeding up of construction activities to hand over possession by June 2022AUTHORITY17/04/2025
Ajad hussain S vs Relatioship PropertiesCompensation and house rent with 18% per annum interest till date. Monthly Comp with 18 % rate and monthly rental for further delay. No RERA Extensions and new tower register without complainants coAUTHORITY17/04/2025
SANJAY MEHTA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDTo instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fitAUTHORITY16/03/2024
ABHISHEK DUGAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation at 18% per annum interest till date. Monthly comp. with 18% rate for the amount paid till now for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY16/03/2024
RAJENDRASINH ANIRUDHASINH JADAV vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consentAUTHORITY16/03/2024
Pritesh Sedani vs Relationship Properties Private LimitedRequest the builder to hand over the possession with interest and delay paid.AUTHORITY16/03/2024
B R NAGARAJ vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDOur request is the interest for delay period to be paid with interest at MLCR +2 % till the final disbursement of penalties and expedite Property registrationAUTHORITY16/03/2024
ANAND KUMAR BHANSALI & ANOTHER vs M/S RELATIONSHIP PROPERTIES PRIVATE LIMITEDI REQUEST YOUR GOOD OFFICE TO DIRECT DEVLOPER TO THE EARLY HANDOVER OF POSSESSION OF APARTMENT IN MY NAME AND PAY 24% PA FROM THE DATE OF PROMISE TO ACTUAL HANDOVERAUTHORITY15/12/2023
ABHAY KUMAR & ANOTHER vs M/S RELATIONSHIP PROPERTIES PRIVATE LIMITEDI request your good office to direct developer to early handover of possession of duly Completed Apartment in my name and pay interest of 24% pa from the date of promise to till the date of actual hanAUTHORITY15/12/2023
SURENDRA KUMAR CHORARIA & ANOTHER vs M/S RELATIONSHIP PROPERTIES PRIVATE LIMITEDI request your good office to direct developer to early handover of possession of duly Completed FLAT in my name and pay interest of 18% pa from the date of promise to till the date of actual handoverAUTHORITY15/12/2023
BHAWAR SINGH RAJPUROHIT & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSI request RERA to please help me and get compensation as per RERA guidelines.AUTHORITY15/12/2023
ROHAN J.K. & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31st dec 2019.AUTHORITY15/11/2023
VINAY NAGARAJAN & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSRERA to approve complainants request for compensation according to RERA guidelinesAUTHORITY15/11/2023
BABULAL BHANSALI & OTHERS vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation for delay in delivery of the property as the same was to be delivered by 31stdec 2019.AUTHORITY15/11/2023
BABULAL BHANSALI & OTHERS vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation for the delayed delivery, NO RERA extension & new tower registration without complaints consent.AUTHORITY15/11/2023
VIKRAM LAMBHATE & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSWe need compensation from the builder at the due interest rate along with timely delivery of the flat.AUTHORITY15/11/2023
HEMAMALINI RAGHAVENDRA & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation as per RERA standards for the 3years delay in delivery of the propertyAUTHORITY15/11/2023
K MAHENDRA KUMAR & ANOTHER vs RELATIONSHIP PROPERTIES PVT LTD. & OTHERSCompensation for delay in delivery date of the project as the initial delivery date is date as per agreement is 31st dec 2019.AUTHORITY15/06/2024
ARIHANT DUGAR & OTHERS vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDRefund of money + interest at 10.65% till date of refund + other compensation - refer details attached as wellAUTHORITY15/05/2024
VEENA RAVISHANKAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annual interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY14/11/2024
Kailash Kumar B Jain & others vs Relationship Properties Private LimitedCompletion of development works + formation of association + refrain from seeking subsequent extensions without informing AllotteesAUTHORITY14/05/2024
RAMESH KUMAR J vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDIMMEDIATE RESTART OF WORK ON THE PROJECT[ THEY HAVE TAKEN 90% AMOUNT] AND INTEREST FOR THE DELAYED PERIOD.AUTHORITY13/08/2022
Nilkanth Iyer vs Relationship Properties Private LimitedRefund of entire payment amount + interest to be paid for the 90% payment takenAUTHORITY13/08/2022
ABHINANDAN H N vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1. There should not be any further extension provided towards this project 2. request rera to do an on spot inspection and verify the facts 3. instruct the builder for suitable reliefAUTHORITY13/08/2022
OMPRAKASH JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and delivery of flatAUTHORITY13/08/2022
VINEET NIDHI DUGAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDcompensation and house rent with 18% per annum interest till date.Monthly compensation with 18% rate and monthly rental for further delay .No rera extensionAUTHORITY13/08/2022
VASANTH KUMAR J vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDI request your good office to direct developer to early handover of possession of duly Completed Plot in my name and pay interest of 18% pa from the date of promise to till the date of actual handoverAUTHORITY13/08/2022
LOHITH JAGADISH SALIGRAM vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation at 18% per annum interest till date. No RERA extensions & new tower register without complainants consent.AUTHORITY13/08/2022
Chaitra Ramachandra vs Relationship Properties Private LimitedOrder for immediate completion of the project early and compensation for severe delay caused & if builder is unable to do so option to exit the project with full repayment with interest & compensationAUTHORITY13/08/2022
Govardhan H B vs Relationship Properties Private Limitedwe need early completion along with compensation towards delay with interestAUTHORITY13/08/2022
CHANDRAKANTH K vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPOSSESSION AND COMPENSATION AT 18% PA UPTILL POSSESSION DATE BY PROMOTORAUTHORITY13/08/2022
RUDHRA PRASAD M S vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation from Respondents(ParkWest)AUTHORITY13/08/2022
RAMESH MEHAR G vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHand-over the flat and Delay hand over Composition with InterestAUTHORITY13/08/2022
ASHUJI DISTRIBUTORS vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDHandover the flat with Possession and composition with interestAUTHORITY13/08/2022
SUKRUTA S vs RELATIONSHIP PROPERTIES PRIVATE LIMITED1) Compensation and house rent @ 18% p.a till date 2) monthly compensation @ 18% and monthly rental for future delayAUTHORITY13/08/2022
GURUSIMHA C vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation by way of interest on money paid & also penalty for delayed due to hardship until the date of delivery of the flatAUTHORITY13/08/2022
C N GIRIDHAR MURTHY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCOMPENSATION BY WAY OF INTEREST ON THE MONEY PAID AND ALSO PENALITY FOR DELAY DUE TO HARDSHIP UNTIL THE DATE OF DELIVERYAUTHORITY13/08/2022
BASAVALINGAPPA ROUDKUNDHI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delayed periodAUTHORITY13/08/2022
Sangameshkumar Bandi vs Relationship Properties Private LimitedDirect the builder to give possession ASAP and provide the appropriate CompensationAUTHORITY13/08/2022
LALITHA SHIVAKUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompletion and compensationAUTHORITY13/08/2022
SREENIVASA KUMAR AKSHINTHALA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDAs per the agreed terms with RPPL , seeking help from RERA to help us for eligible compensation at the earliestAUTHORITY13/08/2022
Tushar Singh vs Relationship Properties Private LimitedCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY13/08/2022
RAMANATH B G vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDInterest compensation for delay.AUTHORITY13/08/2022
Tushar Singh vs Relationship Properties Private LimitedCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY13/08/2022
RAJKUMAR SHAH vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPossession of the property along with interest on delay.AUTHORITY13/08/2022
VIMAL KUMAR PUROHIT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDNEED COMPENSATION AS PER RERA GUIDELINESAUTHORITY13/08/2022
BHABUTMAL PUROHIT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREQUEST FOR COMPENSATION AS PER RERA GUIDELINESAUTHORITY13/08/2022
MADANLAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum intrest till date.monthly comp. With 18% rate & monthly rental for further delay. No RERA extension & new tower register without complaints consentAUTHORITY13/08/2022
BHARAT KUMAR MALI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum intrest till date. Monthly comp with 18%, rate & monthly rental for further delay No RERA extension & new tower register without complaints consentAUTHORITY13/08/2022
ASHOK KUMAR MALI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum intrest till date. Monthly comp. With 18% rate & monthly rental for further delay. No RERA extension & new tower register without complaints consentAUTHORITY13/08/2022
GOWTHAM KUMAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for Delay in Consturciton as per AgreementAUTHORITY13/08/2022
BHAGWAN RAJ PUROHIT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPossession of the property and interest on delay.AUTHORITY13/08/2022
ABDUL JABBAR SHAIK vs Relationship Properties Private LimitedI request this Hon’ble Authority to direct the respondent to pay delay period interest, handing over possession and to obtain occupancy certificate.AUTHORITY13/07/2024
ABDUL JABBAR SHAIK vs Relationship Properties Private LimitedI request this Hon’ble Authority to direct the respondent to pay delay period interest, handing over possession and to obtain occupancy certificate.AUTHORITY13/07/2024
LEENA AJAY & ANOTHER vs M/S RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY13/03/2024
sumit jain vs Relationship Properties Private LimitedMonthly compensation with 10% of interest or as per agreement to manager our house rent expensesAUTHORITY12/11/2022
BINDU S JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation on the full amount paid, by way of interest, penalty.AUTHORITY12/11/2022
Dr PREMALATHA V vs Relationship Properties Private Limitedcompensation and interest. (Memo of calculation : 40000 * 12 Months * 4 Year = Rs : 19,20,000 )AUTHORITY12/11/2022
Radhakrishna Nayak vs Relationship Properties Private LimitedCompensation for delay in delivery of possessionAUTHORITY12/11/2022
Mannath kushlani vs Relationship Properties Private LimitedComplete refund of the amount paid with delay compensation from the dates of payments made at 18% per annum.AUTHORITY12/11/2022
KALPESH JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDcompensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31st dec 2019.AUTHORITY12/11/2022
ASHIWN KUMAR SAGARMAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCOMPENSATION FOR DELAY OF DELIVERY DATE OF THE PROJECT AS THE INITIAL DELIVERY DATE AS PER THE AGREEMENT IS 32ST DEC 2019.AUTHORITY12/11/2022
AKBAR BAIG vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDREFUND OF FULL AMOUNT WITH INTERESTAUTHORITY12/11/2022
CHANDRAMALLEGOWDA C vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with interest at 18% till handing over possession of the flat.AUTHORITY12/11/2022
DHARMESH KUMAR KOTARI vs Relationship Properties Private LimitedMonthly delayed compensation with 10% of interest or as per agreement to manager our house rent expensesAUTHORITY12/11/2022
GOPAL SINGH vs Relationship Properties Private LimitedInterest for the delayed period and also early completion of the flatAUTHORITY12/11/2022
PRAKASH KUMAR PUROHIT vs Relationship Properties Private LimitedInterest for the delayed period and also early completion of the flatAUTHORITY12/11/2022
Sapthagirish Bharatwaj S vs Relationship Properties Private LimitedCompensation of delayed interest due to delay in handover of possesion at 9.5% pa till 30th sept 2022 and 11.5% pa from 1st oct 2022 till date of possesion handover.AUTHORITY12/11/2022
SYED NAAJ PARVEEN vs RELATIONSHIP PROPERTIES PVT. LTD.,Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY12/09/2023
POORNIMA RANGANATH, SATISH CHANDRA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelay compensation from Developers from 01-01-2020 till date of possession of apartment and faster possession of ApartmentAUTHORITY12/09/2023
JAWAHAR S NAGPAL, EKTA NAGPAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation and Interest for Delay in handing over posessionAUTHORITY12/09/2023
Sujith Kumar M vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation as per the present rules of RERA & AgreementAUTHORITY12/03/2025
VINAY ATHREYA vs PARKWEST - MAPLE - TOWER 4Compensation and fast tracking of deliveryAUTHORITY12/03/2022
GANESH M SHOLAPUR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for furtherdelay. No RERA extensions & new tower register without complainants consent.AUTHORITY12/03/2022
PADMA REKHA S vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consentAUTHORITY12/03/2022
Lokesh Ahuja vs Relationship Properties Private Limited1. Rs.75,85,000/- per month from 1.01.2020 to 31.01.2023 as compensation for delay in handover. 2.Rs.2,05,000/- per month from01.02.2023 till completion 3. Costs 4. Interim ReliefsAUTHORITY11/12/2025
Girish Kenkere Ranganath vs Relationship Properties Private LimitedEven if the Builder cites Covid as a reason, he should deliver the project by Dec 2020 as he had already collected 90% of the amount by mid 2019 it self. or compensate the buyer suitablyAUTHORITY11/03/2024
SIDDALINGA SWAMY M vs PARKWEST - MAPLE - TOWER 4Compensation with 18% annum interest rate till date. Monthly compensation with 18% interest for further delay.No rera extension and no new tower registration.AUTHORITY11/02/2023
SINGAL JITESH vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDSought Compensation for this extensive delay in completion of projectAUTHORITY11/02/2023
BABITHA P vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelay in completion and handover of flat, Flat hand over and registration ImmediatelyAUTHORITY11/02/2023
KAMLESH MUNOT vs PARKWEST - MAPLE - TOWER 4To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover . Also any other relief which authority deems fit.AUTHORITY11/02/2023
BHARAT KUMAR JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDSEEKING COMPOUND INTEREST @ 24% TILL THE POSSESIONAUTHORITY11/02/2023
SUNIL KUMAR JAIN vs PARKWEST - MAPLE - TOWER 4To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fitAUTHORITY11/02/2023
SAMATHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation and house rent with 18% per annum interest till date monthly compensation with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants cAUTHORITY11/02/2023
OM BHAVESH PAREKH vs PARKWEST - MAPLE - TOWER 4Compensation and Interest of 18% Per annum till date . Monthly compensation with 18% rate & monthly rent for further delay. No RERA extension & new tower launch register without complainants contentAUTHORITY11/02/2023
HIRALAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDKindly help us getting compensation as per RERA guildelines , already we are paying EMIAUTHORITY11/02/2023
DR SUREKHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDdelay compensationAUTHORITY11/02/2023
SUNITHA KOTRESH vs PARKWEST - MAPLE - TOWER 4RETURN OF AMOUNT AND COMPENSATIONAUTHORITY11/02/2023
KAILASH KUMAR PARASMAL JAIN vs PARKWEST - MAPLE - TOWER 4Compensation for delay of Our Flat MAPLE MA2403AUTHORITY11/02/2023
ABID HUSSAIN SHA vs PARKWEST - MAPLE - TOWER 4compensation for delayAUTHORITY11/02/2023
ANIL GAUTAMCHAND KANKLIYA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDTo instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit.AUTHORITY11/02/2023
NEELAM KANKALIYA vs PARKWEST - MAPLE - TOWER 4To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit.AUTHORITY11/02/2023
SANGEETHA JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDI request your good office to direct developer to early handover of possession of duly Completed flat in my name and pay interest of 18% pa from the date of promise to till the date of actual handoverAUTHORITY11/02/2023
KUNAL M JAIN vs PARKWEST - MAPLE - TOWER 4Compensation in delay in delivery as the initial delivery was on 31st dec 2019.AUTHORITY11/02/2023
MADHU SINGH vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDSince it has been too long time and still they are extending the due date for handover, We request you to kindly get us the compensation as per RERA Guidelines.AUTHORITY11/02/2023
HARISH PREMJI GAMI vs PARKWEST - MAPLE - TOWER 4Compensation from builder.AUTHORITY11/02/2023
ANUSHA BEESETTI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation with Interest for the delayed period. Early possession of the flat. No RERA extensions &new tower registrations without complainants' consentAUTHORITY11/02/2023
K BABULAL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation For Delay in delivery as the initial delivery date was 31st dec 2019AUTHORITY11/02/2023
CHATNA H vs PARKWEST - MAPLE - TOWER 4Want compensation for delay or full payment back with interestAUTHORITY11/02/2023
SANTHOSH RAJAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDSeeking appropriate compensation for delays along with interest. I seek Rs. 80,000per month for every month of delay since 31-Dec-2019 + 9.5% interest per annum as compensation.AUTHORITY11/02/2023
KANCHAN GUPTA vs PARKWEST - MAPLE - TOWER 4Interest as per RERA rules for delayed periodAUTHORITY11/02/2023
PARNAVEE DHAPADE vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDLooking forward for the refund of rent paid for another flat throughout the year OR reducing the agreement amount. I need help of Rs. 4 Lacs (Rs. 4,00,000/-) for our sufferings.AUTHORITY11/02/2023
RAGU SUNDARARAJAN vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDI request RERA to kindly prevail upon the Developer to hand over the flat to me in completed condition and also get me the compensation for the delay periodAUTHORITY11/02/2023
PRAVEEN KUMAR KANNI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation with 18% per annum interest rate till date for the amount paid and for further delay. No RERA extensions & No new tower register without complainants consent.AUTHORITY11/02/2023
PANCHAKSHARI KANNI vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation at 18% per annum interest rate till date and for any further delay. No Rera extensions & No new tower to be registeredAUTHORITY11/02/2023
VINAY K M vs PARKWEST - MAPLE - TOWER 4Compensation for the delay with applicable interest till date. No RERA extensions/registrations without complaint consentAUTHORITY11/02/2023
ASHOK SATYAMURTHY vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for the delay in handing over our flat MC 002.AUTHORITY11/02/2023
KISHORE M JAIN vs PARKWEST - MAPLE - TOWER 4Compensation for delay in delivery of the property as the same was to be deilvered by 31st dec 2019.AUTHORITY11/02/2023
LALITH KUMAR vs PARKWEST - MAPLE - TOWER 4Delay CompensationAUTHORITY11/02/2023
MANSOOR CH vs PARKWEST - MAPLE - TOWER 4Compensation for the delay . No RERA extensions and new tower register without complainants consent.AUTHORITY11/02/2023
HITESH C FOFARIA vs PARKWEST - MAPLE - TOWER 4Compensation for delay of possession with 18%.p.a interest on the total amount paid for the flat from December 2019 till the date of possession of flat.AUTHORITY11/02/2023
RAFEEK A K vs PARKWEST - MAPLE - TOWER 4Compensation for delay. No RERA extensions & new tower register without complainants consent.AUTHORITY11/02/2023
SALAHUDDIN AYUBI S PUNEKAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelay CompensationAUTHORITY10/11/2022
Balasaheb B Pol vs Relationship Properties Private LimitedHanding over possession with interest on delay.AUTHORITY10/11/2022
Deepak Balasaheb Shinde vs Relationship Properties Private LimitedHanding over possession with interest on delay.AUTHORITY10/11/2022
Sivaramakrishna rao yogendra jupudi vs M/S RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelay compensation as per RERA from Dec 2019AUTHORITY10/01/2024
HEMANTH KUMAR C vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDPossession of the property and delay compensationAUTHORITY09/11/2022
PANKAJ vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation for delay.AUTHORITY09/11/2022
Ansuman Patro vs Parkwest Maple -Tower -4Requesting RERA authorities to instruct the builder to refund with proper interestAUTHORITY09/06/2025
S GURU PRASANNA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDTermination of Agreement for Sale and Construction Agreement, Refund and CompensationAUTHORITY08/07/2023
UMESH SS vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation with interestAUTHORITY08/07/2023
KUMAR DWARAKASINGH BAJAJ vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDDelayed compensation with intrest and penaltyAUTHORITY08/02/2024
RAGHAVENDRA NARASIMHA KAMAT & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED.Refund of amount paid with interest for the delay from December 2019 to till dateAUTHORITY07/11/2023
SUBIR KUMAR PAL & SHAMPA PAUL vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDAgreement be terminated and Full refund be made by Builder to us along with Interest at the Bank FD rate plus penalties deemed fit by RERAAUTHORITY06/09/2023
PRAJNA BHAT vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERScompensation and delivery of the project as soon as possibleAUTHORITY06/09/2023
Monika Baid vs Relationship Properties Pvt. Ltd.,Requesting RERA to interfere and help us getting refund along with applicable interest and penaltyAUTHORITY05/08/2024
E R NEMINATHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDCompensation of atleast Rs.40000 per month from January 2020 till the date of hand over of apartmentAUTHORITY04/11/2022
GAJENDRA KUMAR PUROHIT vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDdelay compensation.AUTHORITY04/11/2022
VINOD KUMAR C vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDdelay compensation and registration.AUTHORITY04/11/2022
Sowmya Manjunath vs Parkwest Maple -Tower 4Compensation & house rent with 18% per annum interest till date. Monthly comp. with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants consent.AUTHORITY04/06/2025
Jeevan Ananth vs Parkwest Maple Tower - 4Looking for compensation for the delay caused.AUTHORITY04/06/2025
Sathya Prasad Lakshminarasimhan vs Park West - Maple - Tower-4Requesting RERA to help us get the applicable compensation from the Builder / Promoter as per the Sale AgreementAUTHORITY04/06/2025
Surekha R R vs Parkwest -Maple -Tower-4Refund Rs.23,85,860/- with 18% interest along Compensation Rs.50,000/-AUTHORITY03/11/2025
G VASANT KUMAR JAIN vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSCompensation in delay in delivery as the initial delivery was on 31st dec 2019AUTHORITY03/01/2025
RAJIV B.C., & ANOTHER vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & ANOTHERPossession of said apartment with Occupancy Certificate by September 2022. No RERA extensions & new tower register without complainants consent.AUTHORITY02/12/2023
SHOBHA SHAMASUNDAR vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSDirect 1st Respondent to handover possession of the Apartment along with amenities and pay the amount sought for in the ComplaintAUTHORITY01/07/2024
CHANDA BORANA vs RELATIONSHIP PROPERTIES PRIVATE LIMITED & OTHERSInterest on delay periodAUTHORITY01/07/2024

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (312 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/220309/0009098
09-03-2022
Return of amount andcompensation in fullParkwest - Maple - Tower 4DISPOSED AO
CMP/220310/0009104
10-03-2022
Unreasonable delay in the delivery of the projectParkwest - Maple - Tower 4DISPOSED AO
CMP/221107/0010187
07-11-2022
Delay in handing over of property and seeking compensation for delay in handover of PropertyParkwest - Maple - Tower 4DISPOSED AO
CMP/221125/0010401
25-11-2022
monthly rentalParkwest - Maple - Tower 4DISPOSED AO
CMP/190311/0002417
11-03-2019
Refund of Booking amount with GST along with interest and compensation, For revokation of RERA registration granted to the promoterParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY
CMP/190311/0002422
11-03-2019
Refund of booking amount and GST amount paid, along with interest and compensation, to revoke the registration granted by RERAParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY
CMP/201009/0006794
09-10-2020
Delay in Project Delivery as promised in Advertisement and AgrementParkwest - Maple - Tower 4DISPOSED AUTHORITY BENCH6
CMP/201010/0006804
10-10-2020
Delay in apartment unit and amenities handover as committed in the AgreemetnParkwest - Maple - Tower 4DISPOSED AUTHORITY BENCH4

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectLALIT NARULA-1978Ashok Nagar, Bengaluru
ContractorSIMPLEX INFRASTRUCTURE LIMITED-1924SC Road, Majestic
Structural engineerDesigntree Service Consultants Private Limited---

Builder track record

RERA filing

Relationship Properties has 10 other K-RERA-registered projects in our records (average reported construction progress 64%). 8 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹54.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC FORT BRANCH (IFSC HDFC0000006, a/c …7314). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~11 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
MG Road / city centre5 km
Outer Ring Road / Manyata11 km
Bellandur–Marathahalli belt14 km
Electronic City18 km
Whitefield IT hub21 km
Kempegowda Int'l Airport30 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Relationship Properties.
Relationship Properties has 11 projects registered in Bangalore, 2 past RERA deadline.

Other projects by this builder in Bangalore

Parkwest - Oak - Tower 10
Past deadline · 72% built · 100% sold
Parkwest - Pine - Tower 9
Past deadline · 86% built
Parkwest - Cedar - Tower 8
Filing overdue · 75% built · 100% sold
Parkwest - Sequoia - Tower 11
Filing overdue · 22% built · 95% sold
Parkwest - Emerald - Tower 2
No filings
Parkwest - Magnolia - Tower 6
No filings

Other RERA-registered projects in Binnipete

Major developers building in Binnipete

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Parkwest - Maple - Tower 4?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026