MahaRERA Property Intelligence · Palghar
P99000008528 · naigaon · promoter Navkar Estate Home
| MahaRERA registration | P99000008528 |
| Registered on | 19 Aug 2017 |
| Promoter-declared completion | 31 Dec 2026 |
| Current status | Certificate Signed |
| Against today | 5 months to the declared date |
MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.
Across MahaRERA, Navkar Estate Home is the promoter of record on 87 projects, of which 11 carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.
Of 81 homes filed with MahaRERA, 81 are sold/booked and 0 remain available (~100% sold) — nearly sold out — little inventory left, so you're buying into an established buyer base. Buyers have committed ₹25.10 Cr in agreement value so far. Of that, ₹24.03 Cr (~96%) is already collected, ₹1.07 Cr receivable — a read on how far along these sales really are. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.
What buyers actually paid: across 81 registered agreements, the effective carpet rate is ₹7,685/sqft (typical range ₹4,861–₹9,894) — computed from the agreement values and carpet areas the promoter filed, not broker quotes. Compare your quote against this before negotiating.
No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.
The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+8 and 81 homes are registered across the project.
| Building | Wings | Floors | Homes | Declared completion |
|---|---|---|---|---|
| Type A-Wing A1 A2 A3 8 to 14 floor | 1 | G+8 | 81 | - |
Unit mix on the filing: 81 residential.
No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.
The promoter has had the MahaRERA completion deadline formally extended 2 times. Each extension is the regulator letting the finish line move — the clearest evidence of delivery slippage, straight from the record.
| From (declared) | To (revised) | Stated reason |
|---|---|---|
| 29 Dec 2024 | 29 Dec 2024 | EXTENSION REQUIRED AS STATUTORY COMPLIANCE ARE PENDING |
| 30 Dec 2023 | 31 Dec 2026 | The delay in the issuance of the OC by the VVCMC has resulted in this request for an extension of the project completion date. • We would like to emphasize that all construction wo |
Located at naigaon, naigaon east, Vasai, Palghar, 401208. Per the filed land record, the plot is bounded to the north by Building C2, to the south by Building B Type, to the east by Internal Road and C2 Building and to the west by Survey No 335 Hissa No 2. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.
The nearest major job hub is ~26 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.
| Landmark | Straight-line |
|---|---|
| Andheri MIDC / SEEPZ | 26 km |
| Powai / Hiranandani business park | 27 km |
| Chhatrapati Shivaji Int'l Airport | 30 km |
| Bandra Kurla Complex (BKC) | 33 km |
| Lower Parel / Worli business district | 40 km |
| Nariman Point / Fort | 48 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
🔒 The verdict & buyer playbook · Compliance report
The paid report opens with the overall risk read on this MahaRERA filing, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the promoter before you commit.
🔒 Unit-by-unit guidance · Unit Guidance report
Which building/wing and unit to prefer and the sanctioned-plan read for this project — the ₹2,999 guidance layer.
🔒 Full financial records — escrow, funding & the document catalog · Compliance report
The RERA 70% designated-escrow account activity, the declared means-of-finance, the professionals of record, and every document filed with MahaRERA — the raw records the read above is built on.
Free · Watch this project
We'll email you when this project's RERA record changes.
Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.
Last checked against the RERA register: 27 Jul 2026