RERA Property Intelligence Report · Preview

JRC SANZIO

JRC Projects · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/200923/006277

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
7
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

39
Registered units
₹29.9 Cr
Est. construction cost
Units profiled
38
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units39Total inventory registered with K-RERA.
Official carpet area5,110 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area6,026 sqmUseful scale context when comparing density and project cost.
Registered land area8,723 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI0.652Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed47 total (0 covered, 47 open) — 1.21 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberLAO/90/2022-23Use this to match the sanctioned drawing set shown by the builder.
Plan approval date10-03-2023
Project start date01-08-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK39100%5,110 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
JRC Sanzio139476.85 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 39 official flat/unit rows, matching the 39 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK39120.5-144.0 sqm182.4-234.4 sqm39

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
JRC Sanzio39120.5-144.0 sqm182.4-234.4 sqm39
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1JRC Sanzio13 BHK127.0 sqm221.7 sqm1
2JRC Sanzio13 BHK127.0 sqm221.7 sqm1
3JRC Sanzio13 BHK127.0 sqm221.7 sqm1
4JRC Sanzio13 BHK127.0 sqm221.7 sqm1
5JRC Sanzio13 BHK127.0 sqm221.7 sqm1
6JRC Sanzio13 BHK127.0 sqm221.7 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,410 sqft — large-format homes (3BHK-and-up territory), not compact stock. This is a boutique, low-density project — 39 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 47 parking spaces for 39 homes (~1.2 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~213 sqm per home; across all 39 homes that is ~95% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

11 of 31 compliance document slots are filed as Not Applicable; the remaining 20 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

10 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantVinnakota Ramakrishna2133712012Hyderabad, Telangana - 500073
EngineerK.Venkatesh Babu ReddyBCC/BL-3.6 /SE-355/2019-202019Bengaluru Urban, Karnataka - 560102
ArchitectSYED TALAL MOHIUDDINCA/2006/378612006Hyderabad, Telangana - 500008
ContractorBOBBALA CHINNDLA MANOHAR REDDY-2022Kurnool, Andhra Pradesh - 518124

Builder track record

RERA filing

Jrc Projects has 7 other K-RERA-registered projects in our records (average reported construction progress 82%). 3 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹47.26 Cr collected from buyers, ₹36.30 Cr withdrawn from the project's escrow account.

Construction progress100% → 100% (+0 pts)
Units sold/booked as registered36/39 (92%)
Buyer collections in available QPRs₹47.26 Cr
Escrow withdrawals in available QPRs₹36.30 Cr (0.77x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹76.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Sarjapur Road 2 IFSC Code : HDFC0003980 Pin Code : 560035. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~13 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Electronic City13 km
Bellandur–Marathahalli belt15 km
Whitefield IT hub16 km
MG Road / city centre25 km
Outer Ring Road / Manyata29 km
Kempegowda Int'l Airport42 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Jrc Projects. View Jrc Projects's full track record →
Jrc Projects has 8 projects registered in Bangalore, 2 completed.

Other projects by this builder in Bangalore

JRC Palladio
Filing overdue · 100% built · 63% sold
JRC Wild Woods Phase III
Filing overdue · 65% built · 6% sold
JRC Wild Woods Building 2
No filings

Other RERA-registered projects in Sarjapura

Major developers building in Sarjapura

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in JRC Sanzio?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026