Bangalore/Project record

K-RERA · the public record

Soul@Godrej Ananda

Bengaluru North · Universal Metro Properties

Know the project.
Then choose your home.

The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.

46%construction reportedQ1 2026 filing
62units not bookedof 2,210 · Q1 2026 filing
30 Aug 2028declared completionK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q1 2026

declared completion

30 Aug 2028

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

3BHK TYPE-01
46
1BHK TYPE-04
621
2BHK-TYPE-04
245
1BHK TYPE-05
245
2BHK-TYPE-5B
2
2BHK TYPE-03
48
3BHK TYPE-02
87
2BHK-TYPE-5A
3
1BHK TYPE-02
46
2BHK TYPE-02
95
1BHK TYPE-6C
2
2BHK TYPE-01
89
1BHK TYPE0-6
3
1BHK TYPE-6B
1
1 BHK TYPE-01
46
1BHK TYPE-03
621
1BHK TYPE-6A
5
2BHK-TYPE-05
5

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

8.5registered acres

259.9registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/309/PR/161023/006323

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion30 August 2028
Land area34,407 sq m (8.5 acres)
Homes registered2,210
Tower/wing entries7
Unit mix46 × 3BHK TYPE-01, 621 × 1BHK TYPE-04, 245 × 2BHK-TYPE-04, 245 × 1BHK TYPE-05, 2 × 2BHK-TYPE-5B, 48 × 2BHK TYPE-03, 87 × 3BHK TYPE-02, 3 × 2BHK-TYPE-5A, 46 × 1B

In context

Density259.9 homes per acre
Density in context99th percentile of 525 Bengaluru North projects (median 75.4)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units2,210Total inventory registered with K-RERA.
Official carpet area85,670 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area184,072 sqmUseful scale context when comparing density and project cost.
Registered land area34,407 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.579Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries7Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)620Separate filed counts; these categories may overlap and are not added together.
Covered-parking field1,467Separate filed counts; these categories may overlap and are not added together.
Open-parking field150Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberKIADB/DO & EE-3/Plot No.R10/HardwareUse this to match the sanctioned drawing set shown by the builder.
Plan approval date24-05-2023
Project start date01-09-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3BHK TYPE-01462%3,830 sqm
1BHK TYPE-0462128%11,010 sqm
2BHK-TYPE-0424511%16,613 sqm
1BHK TYPE-0524511%4,363 sqm
2BHK-TYPE-5B20%136 sqm
2BHK TYPE-03482%2,692 sqm
3BHK TYPE-02874%7,244 sqm
2BHK-TYPE-5A30%203 sqm
1BHK TYPE-02462%1,774 sqm
2BHK TYPE-02954%5,149 sqm
1BHK TYPE-6C20%81 sqm
2BHK TYPE-01894%4,824 sqm
1BHK TYPE0-630%122 sqm
1BHK TYPE-6B10%40 sqm
1 BHK TYPE-01462%1,774 sqm
1BHK TYPE-0362128%25,262 sqm
1BHK TYPE-6A50%204 sqm
2BHK-TYPE-0550%340 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower 8222644569.7 m
Tower 9222769169.7 m
Tower 10222999169.7 m
Tower 11243499975.6 m
Tower 12243499875.6 m
Tower 13243247375.6 m
Tower 142434912375.6 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 2,210 official flat/unit rows, matching the 2,210 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
1 BHK1,59017.7-83.3 sqm6.4-16.8 sqm0 (1590 with 0)
2 BHK48717.7-68.0 sqm21.1-28.1 sqm487
3 BHK13217.7-83.3 sqm33.6 sqm132
2.5 BHK117.7 sqm33.6 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower 1134917.7-83.3 sqm6.4-33.6 sqm99 (250 with 0)
Tower 1234917.7-67.9 sqm6.4-28.1 sqm98 (251 with 0)
Tower 1434917.7-67.8 sqm6.4-28.1 sqm123 (226 with 0)
Tower 1332417.7-67.9 sqm6.4-28.1 sqm73 (251 with 0)
Tower 1029917.7-83.3 sqm6.4-33.6 sqm91 (208 with 0)
Tower 927617.7-83.3 sqm6.4-33.6 sqm91 (185 with 0)
Tower 826417.7-83.3 sqm6.4-33.6 sqm45 (219 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
H00-01Tower 802 BHK68.0 sqm28.1 sqm1
H00-02Tower 801 BHK40.9 sqm16.3 sqm0
H00-03Tower 801 BHK17.7 sqm6.4 sqm0
H00-04Tower 801 BHK40.7 sqm16.7 sqm0
H00-11Tower 801 BHK40.7 sqm16.7 sqm0
H00-12Tower 801 BHK17.7 sqm6.4 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 8 of 43 compliance document slots are filed as under process / not yet usable: Address Proof, Board Resolution for Authorized Signatory/Certificate of Authorization, Commencement Certificate, Project Specifications, Certificate from Registered Engineer indicating the structural safety of the building and more.

18 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA complaint orders (1 complaint against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
MR.MAHESHA KWARADI vs M/S.UNIVERSAL METRO PROPERTIES LLPRefund of booking amount in the absence of no information from BuilderAUTHORITY09/10/2024

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Statutory approval status

RERA filing

10 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantBHAVESH D. SHAH1216032009Bengaluru Urban, Karnataka - 400602
EngineerRENUKA PRASAD H NSE-276/2018-191990Bengaluru Urban, Karnataka - 560001
ArchitectChriz ThomasCA/2011/536362011Bengaluru Urban, Karnataka - 560103
ContractorGanesh Earth Movers-2006Bengaluru Urban, Karnataka - 560001

Builder track record

RERA filing

Universal Metro has 2 other K-RERA-registered projects in our records (average reported construction progress 98%). 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹15.63 Cr collected from buyers, ₹87.20 Cr withdrawn from the project's escrow account. This quarter the escrow withdrawal (₹87.20 Cr) exceeded buyer collections (₹15.63 Cr) — worth asking the builder to reconcile against certified construction milestones, which is what RERA requires escrow draws to track.

Construction progress28% → 46% (+18 pts)
Units sold/booked as registered2148/2210 (97%)
Buyer collections in available QPRs₹364.93 Cr
Escrow withdrawals in available QPRs₹261.77 Cr (0.72x collections)
  • 97% of registered units are shown as sold/booked, but no completion certificate is on file yet.
  • Construction progress moved from 28% to 46% across the filed QPR window.
  • The filed unit sales count did not move across the available QPR window because the project was already effectively sold out.
  • The builder has drawn 0.72x of buyer collections from escrow (about 72% of the ₹365 Cr collected) — money is largely staying in the regulated escrow account rather than being pulled out ahead of spend, which is the safer direction. A ratio near or above 1.0 would be the one to scrutinise.
  • In the latest QPR, escrow withdrawal exceeds buyer collections for that quarter. This can be normal if prior balance existed, but it needs a clean explanation.

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹21.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank M G Road IFSC Code : UTIB0000009 Pin Code : 560001. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~13 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Kempegowda Int'l Airport6 km
Outer Ring Road / Manyata13 km
MG Road / city centre21 km
Whitefield IT hub21 km
Bellandur–Marathahalli belt24 km
Electronic City34 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Universal Metro.
Universal Metro has 3 projects registered in Bangalore, 2 completed.

Other projects by this builder in Bangalore

Godrej Ananda
Filing overdue · 100% built · 99% sold
Godrej Ananda Phase 2
On track · 97% built · 99% sold

Other RERA-registered projects in Gummanahalli

Emerald & Luminaire Block At Brigade El Dorado
Dioro & Beryl At Brigade El Dorado

Major developers building in Gummanahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.