RERA Property Intelligence Report · Preview

GRASSLANDS - LAKESIDE

GRAZLANZ PROPERTIES · · K-RERA PRM/KA/RERA/1273/318/PR/210825/008020

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

846
Registered units
₹610.6 Cr
Est. construction cost
Units profiled
27
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units846Total inventory registered with K-RERA.
Official carpet area97,945 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area211,580 sqmUseful scale context when comparing density and project cost.
Registered land area43,859 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.45Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings5Official tower/wing count in the K-RERA detail page.
Parking disclosed846 total (1,308 covered, 269 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberUDP-LBPAS-21100/25-26/BPUse this to match the sanctioned drawing set shown by the builder.
Plan approval date10-06-2025
Project start date20-07-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK39046%35,299 sqm
4BHK516%9,259 sqm
3BHK35742%49,570 sqm
SHOP486%3,817 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Block A36266266116.28 m
Block B36266266116.28 m
Block C36266266116.28 m
Block D1333310.87 m
Block E2151514.54 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 846 official flat/unit rows, matching the 846 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK39090.5 sqm40.8 sqm390
3 BHK357109.7-139.3 sqm50.9-76.8 sqm357
4 BHK51181.6 sqm81.1-96.5 sqm51
SHOP4828.8-123.6 sqm12.7-89.5 sqm48

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Block A26690.5-181.6 sqm40.8-96.5 sqm266
Block B26690.5-181.6 sqm40.8-96.5 sqm266
Block C26690.5-181.6 sqm40.8-96.5 sqm266
Block D3369.7-81.8 sqm31.6-89.5 sqm33
Block E1528.8-123.6 sqm12.7-55.7 sqm15
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-301Block A32 BHK90.5 sqm40.8 sqm1
A-302Block A33 BHK139.3 sqm61.4 sqm1
A-303Block A33 BHK139.3 sqm61.4 sqm1
A-304Block A32 BHK90.5 sqm40.8 sqm1
A-305Block A33 BHK109.7 sqm50.9 sqm1
A-306Block A33 BHK109.7 sqm50.9 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,246 sqft — large-format homes (3BHK-and-up territory), not compact stock. This is a large, multi-tower township — 846 homes across 5 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 846 parking spaces for 846 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~52 sqm per home; across all 846 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

1 of 25 compliance document slots are filed as Not Applicable; the remaining 24 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

3 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved03-08-2024Water NOC 03-08-2024.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved09-07-2025KSPCB CFE NOC 09-07-2025.pdf
KSPCB- MOEF (Above 50 Acres)Approved24-01-2025Environment Clearance NOC 24-01-2025.pdf
KPTCL- BESCOMApproved04-07-2024MESCOM NOC 04-07-2024.pdf
Fire and SafetyApproved10-12-2024FIRE NOC 10-12-2024.pdf
Airport Authority of IndiaApproved20-11-2024Airport NOC 20-11-2024.pdf
BSNL/Telecommunication DepartmentApproved05-07-2024BSNL - NOC 05-07-2024.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantH Gurudas Shenoy292041989Udupi, Karnataka - 576102
EngineerMaiya Rajendra UdyavaraUDP/BL/12112/25-261998Udupi, Karnataka - 574118
ArchitectRamani Hande P.SCA/2006/391342006Udupi, Karnataka - 576101
ContractorVinit S Amin-2015Udupi, Karnataka - 576101

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹13.59 Cr collected from buyers, ₹13.43 Cr withdrawn from the project's escrow account.

Construction progress8% → 8% (+0 pts)
Units sold/booked as registered98/846 (12%)
Buyer collections in available QPRs₹13.59 Cr
Escrow withdrawals in available QPRs₹13.43 Cr (0.99x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹72.2 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: STATE BANK OF INDIA Udupi IFSC Code : SBIN0000945 Pin Code : 576101. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~308 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
MG Road / city centre308 km
Outer Ring Road / Manyata308 km
Electronic City316 km
Kempegowda Int'l Airport316 km
Bellandur–Marathahalli belt317 km
Whitefield IT hub323 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Grazlanz Properties.

Other RERA-registered projects in Whitefield

Major developers building in Whitefield

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.