31 Mar 2024declared completionK-RERA registration · read 20 Sep 2026
67registered unitsK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Available record

No construction trend to plot.

The records used for this page do not supply a series of construction percentages. This does not establish whether possession has been given.

declared completion

31 Mar 2024

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

Villa
65

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

4.9registered acres

13.6registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/446/PR/200908/003599

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 March 2024
Land area19,930 sq m (4.9 acres)
Homes registered67
Tower/wing entries1
Unit mix65 × Villa

In context

Density13.6 homes per acre
Density in context5th percentile of 1119 Bengaluru East projects (median 75.5)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units67Total inventory registered with K-RERA.
Official carpet area11,793 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area19,930 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.55Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date25-08-2020

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Villa65100%11,793 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
RADIANCE BLOSSOM2670-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 67 official flat/unit rows, matching the 67 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
5BHK32190.5-200.9 sqm139.3-159.8 sqm0 (32 with 0)
4BHK31156.9-182.7 sqm109.7-135.0 sqm0 (31 with 0)
6 BHK1213.8 sqm162.9 sqm0 (1 with 0)
6BHK1255.7 sqm214.9 sqm0 (1 with 0)
COMMERCIAL10.0 sqm573.6 sqm0 (1 with 0)
ODD10.0 sqm1,404.6 sqm0 (1 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
RADIANCE BLOSSOM670.0-255.7 sqm109.7-1,404.6 sqm0 (67 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1RADIANCE BLOSSOM0COMMERCIAL0.0 sqm573.6 sqm0
2RADIANCE BLOSSOM0ODD0.0 sqm1,404.6 sqm0
3RADIANCE BLOSSOM06BHK255.7 sqm214.9 sqm0
4RADIANCE BLOSSOM05BHK200.9 sqm141.0 sqm0
5RADIANCE BLOSSOM05BHK200.9 sqm141.0 sqm0
6RADIANCE BLOSSOM05BHK200.9 sqm141.0 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 1 of 24 compliance document slots are filed as under process / not yet usable: Brochure of Current Project.

3 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Mar 2024 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectVignesh-2012KG Colony, Chennai
ContractorIN HOUSE (Radiance Realty Developers India Ltd.)-2007Nandanam, Chennai 600 035
Structural engineerBURO Engineers (I) Private Limited---

Builder track record

RERA filing

Radiance Realty has 6 other K-RERA-registered projects in our records (average reported construction progress 92%). 3 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹61.7 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: KOTAK MAHINDRA BANK MG ROAD (IFSC KKBK0008066, a/c …2275). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~12 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub12 km
Outer Ring Road / Manyata13 km
Kempegowda Int'l Airport14 km
Bellandur–Marathahalli belt17 km
MG Road / city centre18 km
Electronic City27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Radiance Realty. View Radiance Realty's full track record →
Radiance Realty has 7 projects registered in Bangalore, 2 completed.

Other projects by this builder in Bangalore

Radiance Blossom Phase- II
No filings
Radiance Floresta
On track · 99% built · 100% sold
Radiance Gardenia
On track · 99% built · 100% sold
Radiance Platinum
On track · 78% built · 97% sold

Other RERA-registered projects in Krishnarajapuram

Trifecta Verdeen Resplandor ROW House Phase-3

Major developers building in Krishnarajapuram

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Radiance Blossom?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 20 Sep 2026