RERA projects by locality

RERA-registered projects in Baner, Pune

725 registered projects on record · 259 under construction

Major developers building in Baner

Under construction in Baner — possession ahead (259)

7 Business BAY
Under construction · possession by Jul 2026
Maitreya
Under construction · possession by Jul 2026
Mercury
Under construction · possession by Aug 2026
Aarambh
Under construction · possession by Aug 2026
Nancy Hillview A-1
Under construction · possession by Aug 2026
Truspace Platina
Under construction · possession by Aug 2026
34 Western Pavillion
Under construction · possession by Sep 2026
1 NEW Castle
Under construction · possession by Sep 2026
17 East
Under construction · possession by Sep 2026
Downtown
Under construction · possession by Sep 2026
Grace Avenue
Under construction · possession by Sep 2026
Kavish Residency
Under construction · possession by Sep 2026
Satya Residency
Under construction · possession by Sep 2026
Rahul Altimus
Under construction · possession by Oct 2026
Swastik Milan
Under construction · possession by Oct 2026
Suman Kunj
Under construction · possession by Nov 2026
The Hillfront
Under construction · possession by Nov 2026
Aldea Annexo - C2
Under construction · possession by Dec 2026
Amar Infinity
Under construction · possession by Dec 2026
Espacio - A AND B
Under construction · possession by Dec 2026
ONE HQ
Under construction · possession by Dec 2026
Advait Avenue
Under construction · possession by Dec 2026
Amar Delta One
Under construction · possession by Dec 2026
Anand Vihar
Under construction · possession by Dec 2026
Aneesha
Under construction · possession by Dec 2026
ANP Nova
Under construction · possession by Dec 2026
ANP Universe
Under construction · possession by Dec 2026
Bellissima
Under construction · possession by Dec 2026
Bougain Studio
Under construction · possession by Dec 2026
Bramhacorp Townhouse B
Under construction · possession by Dec 2026
Cyprus OAK
Under construction · possession by Dec 2026
Elegance Vega
Under construction · possession by Dec 2026
Estrella 45
Under construction · possession by Dec 2026
Gen1
Under construction · possession by Dec 2026
Godrej Hill Retreat
Under construction · possession by Dec 2026
Godrej Meadows
Under construction · possession by Dec 2026
Godrej Meadows- Phase 2
Under construction · possession by Dec 2026
Heramb
Under construction · possession by Dec 2026
Heritage Gold
Under construction · possession by Dec 2026
Infinity Heights
Under construction · possession by Dec 2026
Kalpataru Jade Skyline
Under construction · possession by Dec 2026
La Moda
Under construction · possession by Dec 2026
Majestique Signature Towers B1
Under construction · possession by Dec 2026
Majestique Signature Towers B2
Under construction · possession by Dec 2026
Majestique Signature Towers B3
Under construction · possession by Dec 2026
Majestique Signature Towers C4
Under construction · possession by Dec 2026
Majestique Signature Towers C5
Under construction · possession by Dec 2026
Malhar Serenity
Under construction · possession by Dec 2026
Manor
Under construction · possession by Dec 2026
Nirvana
Under construction · possession by Dec 2026
One Place Baner Phase III
Under construction · possession by Dec 2026
Raajas
Under construction · possession by Dec 2026
Regency Astra Phase III
Under construction · possession by Dec 2026
Saarrthi Skybay III
Under construction · possession by Dec 2026
Solitaire Business Hub -Iii, Phase- I, Baner
Under construction · possession by Dec 2026
Solitaire Business Hub-III-Phase-Ii,baner
Under construction · possession by Dec 2026
Solitaire Business Hub-III-Phase-Iii,baner
Under construction · possession by Dec 2026
Sufal
Under construction · possession by Dec 2026
The Canary Phase I
Under construction · possession by Dec 2026
The Shwet
Under construction · possession by Dec 2026
Univis
Under construction · possession by Dec 2026
Vastu Tulips
Under construction · possession by Dec 2026
Vivaan
Under construction · possession by Dec 2026
Westfield 23
Under construction · possession by Dec 2026
Westfield 3
Under construction · possession by Dec 2026
Yashada Business Zone
Under construction · possession by Dec 2026
Yashada Jubilee Hills
Under construction · possession by Dec 2026
Aadhya Ankoor
Under construction · possession by Jan 2027
Haute Capital
Under construction · possession by Jan 2027
Nyati Emerald II
Under construction · possession by Feb 2027
Godrej Hill Retreat 2
Under construction · possession by Mar 2027
Aurum Icon
Under construction · possession by Mar 2027
Golden OAK
Under construction · possession by Mar 2027
La Commercia
Under construction · possession by Mar 2027
Regency Astra Phase IV
Under construction · possession by Mar 2027
Saarrthi Skybizz
Under construction · possession by Mar 2027
Shree Samartha Daffodils
Under construction · possession by Mar 2027
Shrey Villas
Under construction · possession by Mar 2027
Treza
Under construction · possession by Mar 2027
Vrindanand-BAY
Under construction · possession by Mar 2027
Vrindanand-Bliss
Under construction · possession by Mar 2027
Yoovie Homes
Under construction · possession by Mar 2027
OM Krushnay Namaha
Under construction · possession by Apr 2027
Apex Commerce Zone
Under construction · possession by Apr 2027
Avaneesh
Under construction · possession by Apr 2027
37 Grandstand
Under construction · possession by May 2027
Nyati Emerald I
Under construction · possession by May 2027
Seven
Under construction · possession by May 2027
45 Shashwat Urbano
Under construction · possession by Jun 2027
Comfort Zone Bliss
Under construction · possession by Jun 2027
Dream Glorious
Under construction · possession by Jun 2027
Majestique Signature Towers A1
Under construction · possession by Jun 2027
Majestique Signature Towers A2
Under construction · possession by Jun 2027
Shreepati Heritage
Under construction · possession by Jun 2027
The Balmoral Riverside - Tower C, Phase I
Under construction · possession by Jun 2027
The Balmoral Riverside-Tower D, Phase II
Under construction · possession by Jun 2027
Thorve House
Under construction · possession by Jun 2027
Westworld
Under construction · possession by Jun 2027
Ganga Business Tower
Under construction · possession by Jul 2027
Tishya
Under construction · possession by Jul 2027
One 45
Under construction · possession by Aug 2027
Westwind
Under construction · possession by Aug 2027
Nancy Hillview A-2
Under construction · possession by Sep 2027
Vivanta
Under construction · possession by Sep 2027
Sanskruti Palm
Under construction · possession by Dec 2027
Kumar Panache
Under construction · possession by Dec 2027
27 Grand Residences- Tower 1
Under construction · possession by Dec 2027
27 Grand Residences- Tower 2
Under construction · possession by Dec 2027
A4 THE Edge
Under construction · possession by Dec 2027
Anishka Avenue
Under construction · possession by Dec 2027
Avenue Promenade
Under construction · possession by Dec 2027
Bramhacorp Townhouse A
Under construction · possession by Dec 2027
Bramhacorp Townhouse A1
Under construction · possession by Dec 2027
Chintamani
Under construction · possession by Dec 2027
Earth 1 BY VTP Luxe Phase 1
Under construction · possession by Dec 2027
Emisphere
Under construction · possession by Dec 2027
F Residences II - C And D
Under construction · possession by Dec 2027
Galaxis BIZ Port
Under construction · possession by Dec 2027
Gurukrupa Apartments
Under construction · possession by Dec 2027
Habitat-Wing C
Under construction · possession by Dec 2027
Jhamtani Spacebiz
Under construction · possession by Dec 2027
Kaizen
Under construction · possession by Dec 2027
Kumar Parth Tower C1
Under construction · possession by Dec 2027
Lotus Serenity
Under construction · possession by Dec 2027
Palladio Balewadi Central Phase 1
Under construction · possession by Dec 2027
Pancard Business HUB
Under construction · possession by Dec 2027
Perfect 10 Phase V
Under construction · possession by Dec 2027
Pinewood Phase II
Under construction · possession by Dec 2027
Portia Grande
Under construction · possession by Dec 2027
Queens Castle
Under construction · possession by Dec 2027
Raanwa
Under construction · possession by Dec 2027
Rohan Ekam Phase 1
Under construction · possession by Dec 2027
Spectrum Commercial Spaces
Under construction · possession by Dec 2027
The Canary Phase 2
Under construction · possession by Dec 2027
The Canary Phase 3
Under construction · possession by Dec 2027
Velvet Vista
Under construction · possession by Dec 2027
Godrej Hillside 3
Under construction · possession by Feb 2028
Icon ORO
Under construction · possession by Mar 2028
24K Altura - Tower A And B
Under construction · possession by Mar 2028
28 Pearl
Under construction · possession by Mar 2028
45 West
Under construction · possession by Mar 2028
Ambrosia Studio
Under construction · possession by Mar 2028
Kumar Parth Tower C 2
Under construction · possession by Mar 2028
Right Barca Square
Under construction · possession by Mar 2028
SRK Gold
Under construction · possession by Mar 2028
Serenity 7
Under construction · possession by Apr 2028
Khyati Business Bay
Under construction · possession by May 2028
5 Maidan By Skyi
Under construction · possession by Jun 2028
Dahlia
Under construction · possession by Jun 2028
F Residences II - A And B
Under construction · possession by Jun 2028
F Residences II - E
Under construction · possession by Jun 2028
Nancy Hill View A-3
Under construction · possession by Jun 2028
Bhagyoday
Under construction · possession by Jul 2028
38 Daffodils
Under construction · possession by Jul 2028
Business HUB
Under construction · possession by Jul 2028
Nyati Emerald III
Under construction · possession by Aug 2028
24 Kalpavriksha
Under construction · possession by Sep 2028
Aldea Annexo - D
Under construction · possession by Sep 2028
Earth 1 BY VTP Luxe Phase 2
Under construction · possession by Oct 2028
Signis
Under construction · possession by Nov 2028
Tejelevia Building - A,B
Under construction · possession by Dec 2028
Tejelevia Building C
Under construction · possession by Dec 2028
Aldea Espanola Phase VII
Under construction · possession by Dec 2028
Kiran Solistia
Under construction · possession by Dec 2028
Stalwart Business Enclave
Under construction · possession by Dec 2028
24 Pallod Farm
Under construction · possession by Dec 2028
27west
Under construction · possession by Dec 2028
Astral Residency
Under construction · possession by Dec 2028
Casa Bonita
Under construction · possession by Dec 2028
Dream Elegance
Under construction · possession by Dec 2028
Green Onyx
Under construction · possession by Dec 2028
Icon Avanza
Under construction · possession by Dec 2028
Infinito Sereno
Under construction · possession by Dec 2028
Itrend Futura
Under construction · possession by Dec 2028
Jayka Synergy Tower
Under construction · possession by Dec 2028
Kakkad Oneworld
Under construction · possession by Dec 2028
Majestique Signature Towers, Building NO B, Wing B6
Under construction · possession by Dec 2028
Merlin Ventana
Under construction · possession by Dec 2028
Namoville
Under construction · possession by Dec 2028
Onyx Haus
Under construction · possession by Dec 2028
Palladio Balewadi Central Phase 2
Under construction · possession by Dec 2028
Platinum Marvelle
Under construction · possession by Dec 2028
Regency Astra Phase V
Under construction · possession by Dec 2028
Sai Canary A3
Under construction · possession by Dec 2028
Sudatta
Under construction · possession by Dec 2028
The Balmoral Hillside - Tower B , Phase I
Under construction · possession by Dec 2028
The Balmoral Riverside- Tower B , Phase III
Under construction · possession by Dec 2028
The Balmoral Riverside-Tower A, Phase IV
Under construction · possession by Dec 2028
The Balmoral Towers - Tower C, Phase II
Under construction · possession by Dec 2028
The Balmoral Towers - Tower D, Phase I
Under construction · possession by Dec 2028
Vertica Phase 1
Under construction · possession by Dec 2028
Vertica Phase 2
Under construction · possession by Dec 2028
Vertica Phase 3
Under construction · possession by Dec 2028
Vishnu
Under construction · possession by Dec 2028
Wandering Winds
Under construction · possession by Dec 2028
Zenistry- B
Under construction · possession by Dec 2028
DP Force Tower
Under construction · possession by Jan 2029
24K Altura - Tower D
Under construction · possession by Mar 2029
Godrej River Royale
Under construction · possession by Mar 2029
Mahalunge Riviera C Wing
Under construction · possession by Mar 2029
Manali Falcon
Under construction · possession by Mar 2029
Twilight
Under construction · possession by Mar 2029
Earth 1 BY VTP Luxe Phase 3
Under construction · possession by Apr 2029
Right Porto Square
Under construction · possession by May 2029
The Balmoral Hillside - Commercial
Under construction · possession by Jun 2029
The Balmoral Hillside-Tower A, Phase II
Under construction · possession by Jun 2029
The Midas Residences Phase 1
Under construction · possession by Jun 2029
Uptown BAY ONE
Under construction · possession by Jul 2029
Tejelevia Building D & Tejone Baner
Under construction · possession by Sep 2029
Kohinoor Business Tower-Baner
Under construction · possession by Oct 2029
Aruj Residency
Under construction · possession by Nov 2029
Majestique Signature Towers Phase 3
Under construction · possession by Dec 2029
Tower 1o8
Under construction · possession by Dec 2029
24K Sereno Building F
Under construction · possession by Dec 2029
Elements
Under construction · possession by Dec 2029
Growell Stays
Under construction · possession by Dec 2029
Kimaya ONE
Under construction · possession by Dec 2029
Kohinoor Satori Mahalunge
Under construction · possession by Dec 2029
Marqis Phase 1
Under construction · possession by Dec 2029
Montaire
Under construction · possession by Dec 2029
Nancy Hill View B 1
Under construction · possession by Dec 2029
Palladio Laviento
Under construction · possession by Dec 2029
The Balmoral Towers - Tower B, Phase III
Under construction · possession by Dec 2029
The Enclave
Under construction · possession by Dec 2029
The Midas Residences Phase 2
Under construction · possession by Dec 2029
The Midas Residences Phase 3
Under construction · possession by Dec 2029
THE Ornate
Under construction · possession by Dec 2029
VTP Verve
Under construction · possession by Dec 2029
Indeco Atrium
Under construction · possession by Mar 2030
Rohan Ekam Phase 2
Under construction · possession by Mar 2030
Venkatesh Tresor
Under construction · possession by Mar 2030
Kumar Parth Tower C3
Under construction · possession by May 2030
Pune Baner Project-Tower 3
Under construction · possession by Jun 2030
Achalare Business Capital
Under construction · possession by Jun 2030
The Midas Residences Phase 4
Under construction · possession by Jun 2030
24K Altura - Tower C
Under construction · possession by Dec 2030
Arvaana
Under construction · possession by Dec 2030
Avenue Cecilia
Under construction · possession by Dec 2030
Botaniq
Under construction · possession by Dec 2030
Crown 8
Under construction · possession by Dec 2030
Jitendra Heritage - E 2 Building - Phase - 1
Under construction · possession by Dec 2030
Livience Unione
Under construction · possession by Dec 2030
Nancy Hill View B-2
Under construction · possession by Dec 2030
Omicron Commerz Baner
Under construction · possession by Dec 2030
Omicron F5 Business Landmarks
Under construction · possession by Dec 2030
Privilege Studios
Under construction · possession by Dec 2030
RVK Amara
Under construction · possession by Dec 2030
The Balmoral Towers - Tower A, Phase IV
Under construction · possession by Dec 2030
THE Hamptonns
Under construction · possession by Dec 2030
Arion
Under construction · possession by Mar 2031
THE Canary SKY Oasis Phase 1
Under construction · possession by Mar 2031
SR House
Under construction · possession by May 2031
Raheja Vistas - T1 & T2
Under construction · possession by Jul 2031
Raheja Vistas - T4
Under construction · possession by Jul 2031
Raheja Vistas - T6 & T7
Under construction · possession by Jul 2031
ANP Privado
Under construction · possession by Sep 2031
Signature Tower Phase 2
Under construction · possession by Dec 2031
Pyramid Corporate Park
Under construction · possession by Dec 2031
Palladio Presidential Suites Balewadi Riverfront
Under construction · possession by Dec 2032

Also registered in Baner (466)

204 Blue Paradise
Declared completion Jun 2026
24K Sereno Building E
Declared completion Jun 2026
Building A3 - Venicia
Declared completion Jun 2026
Godrej Green Cove
Declared completion Jun 2026
Harsh Isha
Declared completion Jun 2026
Majestique Signature Towers B5
Declared completion Jun 2026
Mantra Monarch Phase 1
Declared completion Jun 2026
Mantra Monarch Phase 2
Declared completion Jun 2026
Mantra Monarch Phase 3
Declared completion Jun 2026
Oriana Nest
Declared completion Jun 2026
Primus B Wing
Declared completion Jun 2026
Pulse
Declared completion Jun 2026
The Terraces Phase 2
Declared completion Jun 2026
VTP Aethereus- Phase1
Declared completion Jun 2026
VTP Sierra Phase1
Declared completion Jun 2026
Celestial ONE
Declared completion May 2026
Mahalunge Riviera A1 Bldg
Declared completion May 2026
Godrej Green Vistas
Declared completion May 2026
66 High Street Square
Declared completion Apr 2026
Palaash OAK Prime
Declared completion Apr 2026
Satvik Villa
Declared completion Apr 2026
Nancy Hillview Phase 1
Declared completion Apr 2026
La Commercia 4-9
Declared completion Mar 2026
Nandan ACE
Declared completion Mar 2026
Vivanta Heights
Declared completion Mar 2026
VTP Aethereus High Street
Declared completion Mar 2026
Western Casa
Declared completion Mar 2026
Aldea Espanola Phase Viii
Declared completion Mar 2026
Gagan Klara
Declared completion Mar 2026
Solitaire Business Hub Baner - II
Declared completion Mar 2026
Radiance Residency
Declared completion Feb 2026
51B Inclusive Housing
Declared completion Dec 2025
Aabha
Declared completion Dec 2025
Avenue Daffodil
Declared completion Dec 2025
Brentwood
Declared completion Dec 2025
Eco Tower Phase 2
Declared completion Dec 2025
Global Tower
Declared completion Dec 2025
Heritage 28
Declared completion Dec 2025
Hill Avenue
Declared completion Dec 2025
Imperial Mist
Declared completion Dec 2025
Krishna Residency
Declared completion Dec 2025
Majestique Signature Towers B4
Declared completion Dec 2025
Majestique Signature Towers C3
Declared completion Dec 2025
Qbix
Declared completion Dec 2025
Solitaire Business Hub Baner
Declared completion Dec 2025
Studio 72
Declared completion Dec 2025
Supreme Estia Phase II
Declared completion Dec 2025
Supreme Estia Phase III
Declared completion Dec 2025
THE Address
Declared completion Dec 2025
11 West
Declared completion Dec 2025
ANP - Atlantis -Phase I
Declared completion Dec 2025
Espacio - Wing C D AND E/mhada
Declared completion Dec 2025
Perfect 10 Phase IV
Declared completion Dec 2025
Platinum 9
Declared completion Dec 2025
VTP Aethereus Phase2
Declared completion Dec 2025
Supreme Estia Phase I
Declared completion Dec 2025
VTP Leonara Building G
Declared completion Dec 2025
Ambrosia Galaxy
Declared completion Nov 2025
Galaxy
Declared completion Nov 2025
Regency Astra Phase II
Declared completion Nov 2025
Regency Astra Phase I
Declared completion Nov 2025
Kapil Grace
Declared completion Sep 2025
Metro Park County
Declared completion Sep 2025
Saarrthi Skybay II
Declared completion Sep 2025
Alpha C
Declared completion Sep 2025
Icon Business Spaces
Declared completion Aug 2025
Maruti Mansion
Declared completion Aug 2025
21 Baner Hills
Declared completion Jun 2025
Antaaya
Declared completion Jun 2025
Elegant Aariv
Declared completion Jun 2025
Espacio - Commercial
Declared completion Jun 2025
Kunal Aspiree Phase IV
Declared completion Jun 2025
La Vida
Declared completion Jun 2025
La Vida - Phase 2
Declared completion Jun 2025
Majestique Signature Towers C2
Declared completion Jun 2025
Vastu Kalash
Declared completion Jun 2025
Vtpbelair E And F Building
Declared completion Jun 2025
VTP Leonara Building B
Declared completion Jun 2025
Shruti Aprtment B Wing
Declared completion May 2025
VTP Leonara H Building
Declared completion May 2025
Vaidehi Villas
Declared completion May 2025
Vinayak
Declared completion Apr 2025
Crystal Hills
Declared completion Mar 2025
Pearl Eminent
Declared completion Mar 2025
Platinum Genx Tower
Declared completion Mar 2025
SAI Shriya Anand
Declared completion Mar 2025
VTP Townsquare
Declared completion Mar 2025
ONE Place Baner
Declared completion Mar 2025
ONE Place Baner Phase II
Declared completion Mar 2025
Carnival Nest
Declared completion Feb 2025
Siddhant Heights
Declared completion Feb 2025
Aarna Hills
Declared completion Dec 2024
Atlantis
Declared completion Dec 2024
Balaji Serenity
Declared completion Dec 2024
Ganadheesh
Declared completion Dec 2024
Impressions
Declared completion Dec 2024
Maruti Millennium Tower -2
Declared completion Dec 2024
Phanshul Homes
Declared completion Dec 2024
Raman Vara
Declared completion Dec 2024
Revanta
Declared completion Dec 2024
Siddhivinayak
Declared completion Dec 2024
Truspace Prima Angulus
Declared completion Dec 2024
Venkateshwara Heights D Wing
Declared completion Dec 2024
Westlink
Declared completion Dec 2024
99 Riverfront
Declared completion Dec 2024
Legacy Aeon
Declared completion Dec 2024
Magnolia Business Centre
Declared completion Dec 2024
Majestique Signature Towers C1
Declared completion Dec 2024
Pyramid Axis
Declared completion Dec 2024
Splendid Homes
Declared completion Dec 2024
VTP Belair B And D Building
Declared completion Dec 2024
VTP Belair C Building
Declared completion Dec 2024
VTP Leonara A And D Building
Declared completion Dec 2024
VTP Leonara Building C And F
Declared completion Dec 2024
Vtpbelair A Building
Declared completion Dec 2024
Aaiji Capital
Declared completion Dec 2024
Divyash Residency
Declared completion Oct 2024
Godrej Hillside 1
Declared completion Oct 2024
Godrej Hillside 2
Declared completion Oct 2024
Madhukosh
Declared completion Sep 2024

+346 more registered in Baner.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.