RERA projects by locality

RERA-registered projects in Wakad, Pune

664 registered projects on record · 227 under construction

Major developers building in Wakad

Under construction in Wakad — possession ahead (227)

Fusion Towers Phase III
Under construction · possession by Jul 2026
ANP Bizsquare
Under construction · possession by Jul 2026
Olive Orchard
Under construction · possession by Jul 2026
Fairmont
Under construction · possession by Aug 2026
Varad Residency
Under construction · possession by Sep 2026
ANP Memento
Under construction · possession by Sep 2026
Manor Crystal
Under construction · possession by Sep 2026
Park59
Under construction · possession by Sep 2026
Sensorium, Phase VI
Under construction · possession by Sep 2026
Sonchandr Residency
Under construction · possession by Sep 2026
Spring Residency
Under construction · possession by Sep 2026
Akshara Serenity
Under construction · possession by Oct 2026
Tejas Imperial
Under construction · possession by Oct 2026
SKY World
Under construction · possession by Oct 2026
Ashiana Malhar Phase I And Commercial Block
Under construction · possession by Oct 2026
Godrej Woodsville
Under construction · possession by Nov 2026
SAI Icon Wing B
Under construction · possession by Dec 2026
Global Inspira
Under construction · possession by Dec 2026
Morella Phase II
Under construction · possession by Dec 2026
Sportsville
Under construction · possession by Dec 2026
Terminal ONE
Under construction · possession by Dec 2026
57 Elevate
Under construction · possession by Dec 2026
A G Landmark
Under construction · possession by Dec 2026
Acorn Park Phase - II
Under construction · possession by Dec 2026
Akshara Harmony
Under construction · possession by Dec 2026
Akshara Serenity B And C
Under construction · possession by Dec 2026
AR Amora
Under construction · possession by Dec 2026
Bappa Towers
Under construction · possession by Dec 2026
Courtyard ONE C Bldg
Under construction · possession by Dec 2026
Fusion Towers Phase IV
Under construction · possession by Dec 2026
Garve Buildcon O Wing 57 Avenue
Under construction · possession by Dec 2026
Infinia
Under construction · possession by Dec 2026
Jay Ganesh
Under construction · possession by Dec 2026
La Centra
Under construction · possession by Dec 2026
La Centra Phase 2
Under construction · possession by Dec 2026
Life Republic Sector R13/13th Avenue/aros/phase I
Under construction · possession by Dec 2026
Life Republic Sector R31/31st Avenue/24k-Espada
Under construction · possession by Dec 2026
Megapolis Mystic - G
Under construction · possession by Dec 2026
Mihir Amara Building - A4
Under construction · possession by Dec 2026
Mihir Amara Phase 1
Under construction · possession by Dec 2026
Mihir Amara Phase II
Under construction · possession by Dec 2026
Millennium Emerald
Under construction · possession by Dec 2026
Nakshatra
Under construction · possession by Dec 2026
Roshan Milestone Wing A
Under construction · possession by Dec 2026
Roshan Milestone Wing B
Under construction · possession by Dec 2026
Roshan Milestone Wing C
Under construction · possession by Dec 2026
Royal Oak
Under construction · possession by Dec 2026
Sai Proviso Emporis Phase 1
Under construction · possession by Dec 2026
Sensorium, Phase VII
Under construction · possession by Dec 2026
Sentosa Elite
Under construction · possession by Dec 2026
Shiv Malhar
Under construction · possession by Dec 2026
Siddhi Nisarg C Building
Under construction · possession by Dec 2026
Skyhigh Towers - D1d2
Under construction · possession by Dec 2026
VTP Bellissimo Phase 1
Under construction · possession by Dec 2026
Weone 121
Under construction · possession by Dec 2026
Weone 153
Under construction · possession by Dec 2026
The Camelia Phase - 1
Under construction · possession by Jan 2027
Godrej Eden Estate Phase 3
Under construction · possession by Mar 2027
Aditya Enclave
Under construction · possession by Mar 2027
RGS Forte
Under construction · possession by Mar 2027
Rohan Nidita Phase 1
Under construction · possession by Mar 2027
Signature Park Phase - I
Under construction · possession by Mar 2027
Vantage Capital
Under construction · possession by Mar 2027
VTP Bellissimo Phase 3
Under construction · possession by Mar 2027
Anand Vrindavan
Under construction · possession by Apr 2027
Kuber Antonia A Wing
Under construction · possession by Apr 2027
Kuber Antonia C Wing
Under construction · possession by Apr 2027
Kuber Properties Kuber Antonia B
Under construction · possession by Apr 2027
Ashiana Malhar Phase II
Under construction · possession by May 2027
Laxmi Bappa
Under construction · possession by May 2027
Sai Pleasure
Under construction · possession by Jun 2027
ANP Ultimus
Under construction · possession by Jun 2027
Ganga Asmi
Under construction · possession by Jun 2027
Hinjewadi Project
Under construction · possession by Jun 2027
Hinjewadi Project-Tower 1
Under construction · possession by Jun 2027
Kamalaraj Athens B And C
Under construction · possession by Jun 2027
Kamalraj Athens A
Under construction · possession by Jun 2027
MY Home Wakad
Under construction · possession by Jun 2027
Park Titan Phase III
Under construction · possession by Jun 2027
Prime Nest
Under construction · possession by Jun 2027
Sukhwani Ambar
Under construction · possession by Jun 2027
Triaa Galaxy - Phase 1
Under construction · possession by Jun 2027
VJ Indilife Wakad
Under construction · possession by Jun 2027
Yashone Eternitee Phase 2
Under construction · possession by Jun 2027
TOP Towers - B
Under construction · possession by Jul 2027
IRA
Under construction · possession by Sep 2027
Prime Pinnacle
Under construction · possession by Sep 2027
Zenone B Building
Under construction · possession by Sep 2027
Life Republic Sector R22/22nd Avenue - Atmos/phase - I
Under construction · possession by Oct 2027
Prithvi Paradise NXT
Under construction · possession by Oct 2027
VTP Bellissimo Phase 2
Under construction · possession by Dec 2027
Itrend City Life
Under construction · possession by Dec 2027
Life Republic Sector R1 - 1st Avenue
Under construction · possession by Dec 2027
Sukhwani Skylines
Under construction · possession by Dec 2027
41 Commune
Under construction · possession by Dec 2027
Apostrophe Hinjawadi Tower B
Under construction · possession by Dec 2027
Arbor Vista
Under construction · possession by Dec 2027
Avishkar Ridhima
Under construction · possession by Dec 2027
Building B2 Eon Homes
Under construction · possession by Dec 2027
Building C2 Eon Homes
Under construction · possession by Dec 2027
Kings County Phase - I
Under construction · possession by Dec 2027
Lagom
Under construction · possession by Dec 2027
Legend Aaradhyam Phase I
Under construction · possession by Dec 2027
Life Republic/sector R10/10th Avenue/universe/phase V
Under construction · possession by Dec 2027
Mindspace
Under construction · possession by Dec 2027
Palm Springs PH-II D-Wing
Under construction · possession by Dec 2027
Param
Under construction · possession by Dec 2027
Rohan Viti
Under construction · possession by Dec 2027
Roshan Milestone Wing D
Under construction · possession by Dec 2027
Siddhis Sapphire Homes
Under construction · possession by Dec 2027
Skyhigh Towers D3
Under construction · possession by Dec 2027
Skyline
Under construction · possession by Dec 2027
Sportsville Phase 1
Under construction · possession by Dec 2027
Suratwala Mark Plazzo- Building C, D AND E
Under construction · possession by Dec 2027
The Legend Phase II
Under construction · possession by Dec 2027
Trident E F
Under construction · possession by Dec 2027
Wakad Central Park
Under construction · possession by Dec 2027
Yashwin Urbo Centro - Phase 1
Under construction · possession by Dec 2027
You57 Tower D
Under construction · possession by Feb 2028
Life Republic/sector R16/16th Avenue/arezo-J, K, D Building And Shops
Under construction · possession by Mar 2028
Akshay Anantam
Under construction · possession by Mar 2028
Antalya Next
Under construction · possession by Mar 2028
Ashiana Malhar Phase III
Under construction · possession by Mar 2028
Park Titan Phase IV
Under construction · possession by Mar 2028
Hinjewadi Project-Tower 4 And 5
Under construction · possession by Jun 2028
Life Republic Sector R13/13th Avenue/aros/phase-II
Under construction · possession by Jun 2028
Abharan
Under construction · possession by Jul 2028
Ceratec West Winds
Under construction · possession by Aug 2028
Hinjewadi Project-Tower 6
Under construction · possession by Sep 2028
Shubh Swarovski Wing A
Under construction · possession by Oct 2028
Winds OF JOY Project B
Under construction · possession by Oct 2028
Nivaas Business Square
Under construction · possession by Oct 2028
Winds OF JOY Project A
Under construction · possession by Nov 2028
Chandrarang Serenity
Under construction · possession by Dec 2028
41 Commune - Hinjewadi
Under construction · possession by Dec 2028
Adya Alcove
Under construction · possession by Dec 2028
Altis One
Under construction · possession by Dec 2028
Amarillo Phase 2
Under construction · possession by Dec 2028
Apostrophe Hinjawadi Tower A
Under construction · possession by Dec 2028
Divine Reves, Wing A
Under construction · possession by Dec 2028
Ganga Asmi Wing 2
Under construction · possession by Dec 2028
Hinjewadi Premium-Tower 7
Under construction · possession by Dec 2028
Jalvan Homes Phase - I
Under construction · possession by Dec 2028
Kalp ONE
Under construction · possession by Dec 2028
Kohinoor Central Park - Phase 1
Under construction · possession by Dec 2028
Kohinoor Famville
Under construction · possession by Dec 2028
Life Republic Sector R22/22nd Avenue - Atmos/phase-II
Under construction · possession by Dec 2028
Menlo Estella
Under construction · possession by Dec 2028
Menlo Hashtag Studios
Under construction · possession by Dec 2028
Menlo Homes Hinjewadi Phase 2
Under construction · possession by Dec 2028
Meridian Studios
Under construction · possession by Dec 2028
Platinum Towers
Under construction · possession by Dec 2028
Rohan Nidita Phase 2
Under construction · possession by Dec 2028
Roshan Milestone Wing E
Under construction · possession by Dec 2028
Roshan Milestone Wing F
Under construction · possession by Dec 2028
Roshan Milestone Wing G
Under construction · possession by Dec 2028
Roshan Milestone Wing H
Under construction · possession by Dec 2028
SKY Sanctum
Under construction · possession by Dec 2028
The Crown Greens Plot 7 Phase 2 A
Under construction · possession by Dec 2028
Vaishnavi Homes A Wing
Under construction · possession by Dec 2028
Niwas
Under construction · possession by Jan 2029
Building C1 Eon Homes
Under construction · possession by Jan 2029
Hinjewadi Premium - Tower 8
Under construction · possession by Jan 2029
Megapolis Shimmer - A1
Under construction · possession by Mar 2029
Runaa Saukhyam
Under construction · possession by Mar 2029
The Gale At Godrej Park World
Under construction · possession by Mar 2029
41 Zoy
Under construction · possession by Jun 2029
Gulmohar Atrium
Under construction · possession by Jun 2029
Menlo Professional Park- Hinjawadi
Under construction · possession by Jun 2029
P.k.canopus
Under construction · possession by Jun 2029
Yashwin Urbo Centro Phase 2
Under construction · possession by Jun 2029
Park Titan Phase V
Under construction · possession by Aug 2029
Ashiana Malhar Phase 4
Under construction · possession by Sep 2029
Life Republic Sector R5/5th Avenue - Canvas/phase I
Under construction · possession by Sep 2029
Kohinoor Central Park - Phase II
Under construction · possession by Oct 2029
THE Ridges 41
Under construction · possession by Dec 2029
Skyhigh Towers D4
Under construction · possession by Dec 2029
Ibz Hinjewadi
Under construction · possession by Dec 2029
Monarque BY VTP Luxe Phase 2
Under construction · possession by Dec 2029
Parth Kiona
Under construction · possession by Dec 2029
Rajveer Garima Phase 1
Under construction · possession by Dec 2029
Terminal Two
Under construction · possession by Dec 2029
THE Raya Phase I
Under construction · possession by Dec 2029
Truston Aspen
Under construction · possession by Dec 2029
VTP Monarque Phase 1
Under construction · possession by Dec 2029
VTP Volare
Under construction · possession by Dec 2029
Westgate Business Park
Under construction · possession by Dec 2029
R7 - THE Altius
Under construction · possession by Jan 2030
Joy On The Tree Tops Project A
Under construction · possession by Mar 2030
Anshul Casa J Building
Under construction · possession by Apr 2030
Kohinoor Regalia Towers
Under construction · possession by Jun 2030
Aventis
Under construction · possession by Jun 2030
Building B3 Eon Homes
Under construction · possession by Jun 2030
Landmarc
Under construction · possession by Jun 2030
Luxton
Under construction · possession by Jun 2030
Godrej Evergreen Square
Under construction · possession by Oct 2030
Ganga Asmi Wing 3
Under construction · possession by Dec 2030
Blue Ridge-The Promenade
Under construction · possession by Dec 2030
Brahma Tower Phase II
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 13
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 14
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 15
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 16
Under construction · possession by Dec 2030
Kohinoor Royale Towers
Under construction · possession by Dec 2030
Monarque BY VTP Luxe Phase 3
Under construction · possession by Dec 2030
Pashankar Waves
Under construction · possession by Dec 2030
Prissa Pratham
Under construction · possession by Dec 2030
The Greenfront At Godrej Park World
Under construction · possession by Dec 2030
Treasure Troves
Under construction · possession by Dec 2030
Vardhaman Skysymphony
Under construction · possession by Dec 2030
Anshul Casa K Building
Under construction · possession by Apr 2031
Pune Wakad Project
Under construction · possession by Jun 2031
Hinjewadi Phase 3 - Tower 2
Under construction · possession by Jun 2031
Hinjewadi Phase 3-Tower 1
Under construction · possession by Jun 2031
Hinjewadi Premium - Tower 9
Under construction · possession by Jun 2031
Hinjewadi Project-Tower A
Under construction · possession by Jun 2031
Hinjewadi Project-Tower B
Under construction · possession by Jun 2031
Lodha Hinjewadi Phase 3
Under construction · possession by Jun 2031
The Aqua Retreat At Godrej Park World
Under construction · possession by Sep 2031
A R Mirador
Under construction · possession by Dec 2031
Geras Joy On The Tree Tops Project B
Under construction · possession by Dec 2031
Platinum 9 World Tower
Under construction · possession by Dec 2031
Rajveer Garima Phase 2
Under construction · possession by Dec 2031
The Embercrest
Under construction · possession by Dec 2031
Hinjewadi Premium - Tower 10
Under construction · possession by Jul 2032
Highness
Under construction · possession by Dec 2032
Shankeshwar Kingsland Phase 1
Under construction · possession by Dec 2032

Also registered in Wakad (437)

Netizen
Declared completion Jul 2026
Green Life
Declared completion Jul 2026
172W Inclusive Housing
Declared completion Jun 2026
Anshul Casa I-Building
Declared completion Jun 2026
B. J. Heights
Declared completion Jun 2026
Blueridge-The Groves
Declared completion Jun 2026
Casa Imperia
Declared completion Jun 2026
Dolphin Matrix
Declared completion Jun 2026
Lagom Homes
Declared completion Jun 2026
Omega Paradise N Wing 57 MID Town
Declared completion Jun 2026
Park Astra Phase III
Declared completion Jun 2026
Park Titan
Declared completion Jun 2026
Presidency Towers
Declared completion Jun 2026
Prithvi Paradise
Declared completion Jun 2026
TOP Towers - A
Declared completion Jun 2026
Trident Business Park
Declared completion Jun 2026
Welworth Purnam
Declared completion Jun 2026
Yashwin Nuovocentro
Declared completion Jun 2026
Jubilate County
Declared completion May 2026
Bonheur A Wing
Declared completion Apr 2026
Yashone Eternitee Phase 1
Declared completion Apr 2026
Rahul Aston - II
Declared completion Apr 2026
7 Square
Declared completion Mar 2026
Bhama Center
Declared completion Mar 2026
Brahma Tower I A And B Wing
Declared completion Mar 2026
Gaikwad Nirvanas
Declared completion Mar 2026
Gaurav Icon Tower
Declared completion Mar 2026
Genesiis
Declared completion Mar 2026
Navkarshree Building
Declared completion Mar 2026
Orion 15-16-17
Declared completion Mar 2026
Royal ACE
Declared completion Mar 2026
Saarrthi Savvy Homes II
Declared completion Mar 2026
Swanand Residency
Declared completion Mar 2026
Yashwin Supernova
Declared completion Mar 2026
M J Opera
Declared completion Feb 2026
S3 Supreme
Declared completion Feb 2026
Kuber Antonia
Declared completion Feb 2026
Godrej Eden Estate Phase 1
Declared completion Feb 2026
Godrej Eden Estate Phase 2
Declared completion Feb 2026
A R Atlas
Declared completion Dec 2025
Apostrophe Hinjawadi Tower C
Declared completion Dec 2025
Athashree
Declared completion Dec 2025
Building C3 Eon Homes
Declared completion Dec 2025
Elanza
Declared completion Dec 2025
Festive Residency
Declared completion Dec 2025
Laxmi Bliss
Declared completion Dec 2025
Life Republic / Sector R10 / 10th Avenue / Universe / Phase IV
Declared completion Dec 2025
Life Republic Sector R17a/17a Avenue-Sound Of Soul/phase-I
Declared completion Dec 2025
Life Republic/sector R10/10th Avenue/universe/phase III
Declared completion Dec 2025
Omega Commercial Complex - Soham Icon
Declared completion Dec 2025
Pragati
Declared completion Dec 2025
Rioland B Wing
Declared completion Dec 2025
SRK Platinum
Declared completion Dec 2025
Suyog Space - Phase II
Declared completion Dec 2025
Talreja Business HUB
Declared completion Dec 2025
The Cliff Garden-Phase 2A
Declared completion Dec 2025
Trident C, D
Declared completion Dec 2025
Trinity Grace
Declared completion Dec 2025
Unnati Phase III
Declared completion Dec 2025
32 Pinewood Drive -Phase2
Declared completion Dec 2025
Atulya-Maan
Declared completion Dec 2025
Epitome Phase II
Declared completion Dec 2025
Kalpataru Exquisite - Wing 4
Declared completion Dec 2025
Megapolis Serenity A1 To A7, B1 And Conv Shop A
Declared completion Dec 2025
Megapolis Serenity A8 To A12, B2 And Conv Shop B
Declared completion Dec 2025
Park Astra
Declared completion Dec 2025
Rajveer Nucleus
Declared completion Dec 2025
Ritika Residency
Declared completion Dec 2025
Rohan Ananya
Declared completion Dec 2025
Royal Saiicon
Declared completion Dec 2025
Tropez Business Center - Commercial Phase
Declared completion Dec 2025
Leela Heights
Declared completion Dec 2025
Livmo Phase I
Declared completion Dec 2025
Livmo Phase II
Declared completion Dec 2025
Life Republic Sector R16- 16th Avenue- Arezo- M Building
Declared completion Oct 2025
Anshul Casa H Building
Declared completion Oct 2025
Cleveland Park
Declared completion Oct 2025
Vantagio. PH2
Declared completion Sep 2025
The Water Edge
Declared completion Aug 2025
Kratos Tower
Declared completion Aug 2025
Narmada Blue Sapphire
Declared completion Jul 2025
Snehangan Residency A And B Wing
Declared completion Jul 2025
Building B1 Eon Homes
Declared completion Jun 2025
Building D1 Eon Homes
Declared completion Jun 2025
Elysia Towers
Declared completion Jun 2025
Laxmi Pride
Declared completion Jun 2025
Palm Springs Phase 1
Declared completion Jun 2025
Sensorium, Phase IV
Declared completion Jun 2025
Sensorium, Phase V
Declared completion Jun 2025
Yashwin Hinjawadi
Declared completion Jun 2025
Sacred Basil
Declared completion Jun 2025
ANP Retreat
Declared completion Jun 2025
Ivana Residency
Declared completion May 2025
Kumar Piccadilly
Declared completion May 2025
Sensorium, Phase I
Declared completion May 2025
Sensorium, Phase II
Declared completion May 2025
Sensorium, Phase III
Declared completion May 2025
Rahul Aston - I
Declared completion Apr 2025
Shubharambh Apartment
Declared completion Apr 2025
Future Elite
Declared completion Mar 2025
Sky Bhumi
Declared completion Mar 2025
You57 Amenity Building
Declared completion Mar 2025
You57 Tower C
Declared completion Mar 2025
Stellar Homes - Phase I
Declared completion Mar 2025
Yashone Hinjawadi - Phase II
Declared completion Mar 2025
Itrend Life Plus
Declared completion Mar 2025
Casa Imperia EWS
Declared completion Mar 2025
Megapolis Mystic - F
Declared completion Feb 2025
Kumar Piccadilly F Building
Declared completion Jan 2025
A R Imperia
Declared completion Dec 2024
Aloha
Declared completion Dec 2024
Atlanta
Declared completion Dec 2024
Aura
Declared completion Dec 2024
Bloomville Building C
Declared completion Dec 2024
Chandan Colozium
Declared completion Dec 2024
Life Republic- Sector R16- 16th Avenue- Arezo- F Building
Declared completion Dec 2024
Park Connect Phase II
Declared completion Dec 2024
Platinum Park
Declared completion Dec 2024
Shivam Ridhima
Declared completion Dec 2024
Stellar Rhythmm
Declared completion Dec 2024

+317 more registered in Wakad.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.